Back to bathroom remodel contractors
Better Construction Ltd
- Based in
- Daly City
- On San Francisco permits
- Aug 2000 to May 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 25 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 5 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2015 | Completed final sign-off Dec 2016 | 2561 23rd Av | fill-in lightwell. not visible from street. add stairs to below. remodel kitchen, add skylights, reframe roof. remove old interior stairs - make into closets. remodel (e) legal downstairs family bedroom, office & full bath, add 1.2 bath. new conditioned space 78 sf total. add voluntary shear walls &Details
fill-in lightwell. not visible from street. add stairs to below. remodel kitchen, add skylights, reframe roof. remove old interior stairs - make into closets. remodel (e) legal downstairs family bedroom, office & full bath, add 1.2 bath. new conditioned space 78 sf total. add voluntary shear walls & | $31,500 |
| Jun 16, 2015 | Completed final sign-off Sep 2015 | 182 26th Av | this project includes interior renovation of two (e) bedrooms into (1) master bedroom and one (1) master bathroom.Details
this project includes interior renovation of two (e) bedrooms into (1) master bedroom and one (1) master bathroom. | $45,000 |
| Jun 19, 2014 | Completed final sign-off Jul 2016 | 1534 Plymouth Av | room down: addition of extg single family residence. work include architectural, plumbing, electrical, and mechanical. add one bedroom, 1 1/2 baths, one family room and 1 storage room and one new stairway.Details
room down: addition of extg single family residence. work include architectural, plumbing, electrical, and mechanical. add one bedroom, 1 1/2 baths, one family room and 1 storage room and one new stairway. | $180,000 |
| Aug 1, 2013 | Completed final sign-off Oct 2013 | 1218 48th Av | kitchen remodel - replace cabinets, counter, upgrade electrical lighting, modify plumbing. install , sink, hood stove. bathroom remodel, replace bath tub, sink, shower stal, all faucets, upgrade electrical. all work to be on upstairsDetails
kitchen remodel - replace cabinets, counter, upgrade electrical lighting, modify plumbing. install , sink, hood stove. bathroom remodel, replace bath tub, sink, shower stal, all faucets, upgrade electrical. all work to be on upstairs | $20,000 |
| Aug 3, 2012 | Completed final sign-off Sep 2012 | 1651 35th Av | remodel existing first floor family room. relocate 1/2 bath, relocate laundry.Details
remodel existing first floor family room. relocate 1/2 bath, relocate laundry. | $40,000 |
| Sep 28, 2011 | Completed final sign-off Jan 2012 | 1534 Plymouth Av | remodel kitchen, replace cabinets, all fixtures, upgrade electrical. no structural work. remodel bath, replace all fixtures, upgrade electrical. all new lighting must comply with cec 150 k 10, 1/2 cec 150 k 8Details
remodel kitchen, replace cabinets, all fixtures, upgrade electrical. no structural work. remodel bath, replace all fixtures, upgrade electrical. all new lighting must comply with cec 150 k 10, 1/2 cec 150 k 8 | $35,000 |
| Apr 23, 2010 | Completed final sign-off Jan 2011 | 37 Theresa St | to comply with nov #201031280. proposed repair works in the (e) building and remove one illegal room. replace furnace. legalize 1/2 bath.Details
to comply with nov #201031280. proposed repair works in the (e) building and remove one illegal room. replace furnace. legalize 1/2 bath. | $15,000 |
| Apr 1, 2010 | Completed final sign-off Nov 2010 | 2697 Alemany Bl | legalize the (e) bath & (e) fam room & bar sink at garage floor. add one new bath & two bedrm @ garage level; replace 6 windows at west & south side of house in kind. add two new windows at south side of the house. all new windows must match (e) windows style.Details
legalize the (e) bath & (e) fam room & bar sink at garage floor. add one new bath & two bedrm @ garage level; replace 6 windows at west & south side of house in kind. add two new windows at south side of the house. all new windows must match (e) windows style. | $30,000 |
| Dec 1, 2006 | Completed final sign-off Apr 2007 | 60 Brentwood Av | bathroom remodel, change all plmg fixtures, light fixtures. replace sheetrock upgrade electrical upgrade main service. repair front wall dryrot interior printing and exterior painting refinish hardwood floor. install kchn counter top. replace furnace and water heater, install dishwasher, same loctnDetails
bathroom remodel, change all plmg fixtures, light fixtures. replace sheetrock upgrade electrical upgrade main service. repair front wall dryrot interior printing and exterior painting refinish hardwood floor. install kchn counter top. replace furnace and water heater, install dishwasher, same loctn | $50,000 |