Bestway Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2011
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 101 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2011 | Completed final sign-off Sep 2011 | 132 Sagamore St | per nov 199706509, replace extg dryrotted front portch and stairs and deck at back porch. repair dryrot damage at extg basement level.Details
per nov 199706509, replace extg dryrotted front portch and stairs and deck at back porch. repair dryrot damage at extg basement level. | $12,000 |
| Sep 5, 2006 | Completed final sign-off Feb 2008 | 262 Staples Av | remove (e) rear stairs, build new enclosed stair and storage area, new deck at upper floor.Details
remove (e) rear stairs, build new enclosed stair and storage area, new deck at upper floor. | $50,000 |