Back to kitchen remodel contractors
Bestway Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2011
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2011 | Completed final sign-off Nov 2011 | 1846 34th Av | (1) kitchen remodeling: lighting to comply with cec 150k. remove kitchen cabinets, walls & base. rerplace existing kitchen entrance door - for a packet door. repair all kitchen wall. no change to exterior door, window & walls. install new cabinets and new fixtures.Details
(1) kitchen remodeling: lighting to comply with cec 150k. remove kitchen cabinets, walls & base. rerplace existing kitchen entrance door - for a packet door. repair all kitchen wall. no change to exterior door, window & walls. install new cabinets and new fixtures. | $15,000 |
| Mar 15, 2007 | Completed final sign-off May 2007 | 650 Parnassus Av | work in unit#652 lot#044 only. kitchen remodeling. replace (e) cabinets. replace plumbing fixtures and install new faucet. 50% flourescent lighting wattage min.Details
work in unit#652 lot#044 only. kitchen remodeling. replace (e) cabinets. replace plumbing fixtures and install new faucet. 50% flourescent lighting wattage min. | $9,500 |
| Jun 27, 2006 | Completed final sign-off Jan 2007 | 54 Edgar Av | strip broken plaster from wall & ceiling in kitchen hallway & repl w/sheetrock were is necessary, remodeling existing kitchen: repl existing kitchen cabinets & all fixtures. remodeling existing bathroom (2), 1 main floor, 1 top floor; strip existing walls & floor tiles, retile/replace bathrm fixtureDetails
strip broken plaster from wall & ceiling in kitchen hallway & repl w/sheetrock were is necessary, remodeling existing kitchen: repl existing kitchen cabinets & all fixtures. remodeling existing bathroom (2), 1 main floor, 1 top floor; strip existing walls & floor tiles, retile/replace bathrm fixture | $80,000 |
| May 11, 2006 | Never finaled issued May 2006, no final | 666 Post St | repair broken plaster on walls & ceiling. repair or replace interior doors. paint existing kitchen cabinets. paint all interior apartment.Details
repair broken plaster on walls & ceiling. repair or replace interior doors. paint existing kitchen cabinets. paint all interior apartment. | $10,500 |
| Jun 9, 2004 | Completed final sign-off Nov 2004 | 660 Clarendon Av | kitchen remodeling carpentry workDetails
kitchen remodeling carpentry work | $19,000 |
| May 23, 2000 | Completed final sign-off Sep 2000 | 1177 California St | kitchen and bathroom remodelingDetails
kitchen and bathroom remodeling | $10,000 |