Back to kitchen remodel contractors
Bespoke Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2010 to Sep 2017
- Last 24 months
- 0 permits filed
47 permits since 2000: 44 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 14 completed, 1 never finaled. Typically 6 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2015 | Completed final sign-off Feb 2016 | 25 Coleridge St | 2nd floor kitchen & bath remodel, stair reconfiguration & partitoin wall reconfiguration. replace windows not visible from street.Details
2nd floor kitchen & bath remodel, stair reconfiguration & partitoin wall reconfiguration. replace windows not visible from street. | $25,000 |
| Feb 18, 2015 | Completed final sign-off Dec 2017 | 235 San Anselmo Av | kitchen and bath remodel. new windows and doors like kind in rear only. n/a for the maher. compliance with maher ordinance no 155-13 not required.Details
kitchen and bath remodel. new windows and doors like kind in rear only. n/a for the maher. compliance with maher ordinance no 155-13 not required. | $150,000 |
| Dec 4, 2014 | Completed final sign-off Oct 2015 | 75 Mercedes Wy | kitchen remodel, 1/2 bath relocation, new windows & doors at side & rear yard, not visable from street. new deck at side yard, bathroom remodel, bathroom addition.Details
kitchen remodel, 1/2 bath relocation, new windows & doors at side & rear yard, not visable from street. new deck at side yard, bathroom remodel, bathroom addition. | $150,000 |
| Oct 21, 2013 | Completed final sign-off Apr 2015 | 155 Dorchester Wy | 1st floor-enclose landing at new stairs & add laundry & study rooms. 2nd floor-relocate interior stairs, remodel kitchen & bathroom. add bathroom & closet at bedroom. remove walls at kitchen & living roomDetails
1st floor-enclose landing at new stairs & add laundry & study rooms. 2nd floor-relocate interior stairs, remodel kitchen & bathroom. add bathroom & closet at bedroom. remove walls at kitchen & living room | $85,000 |
| Oct 15, 2013 | Completed final sign-off Aug 2014 | 167 Alhambra St | 1st floor-remodel rooms behind garage to include new interior stairs, bathroom, 1 bedroom, family room w (n) fireplace. 2nd floor-reconfigure walls at kitchen & remodel kitchenDetails
1st floor-remodel rooms behind garage to include new interior stairs, bathroom, 1 bedroom, family room w (n) fireplace. 2nd floor-reconfigure walls at kitchen & remodel kitchen | $86,000 |
| Apr 4, 2013 | Completed final sign-off Sep 2013 | 69 Scott St | replace int. spiral staircase with new staircase. reconfigure master bedroom and bath at 2nd floor. remodel kitchen and 2 baths at 3rd floor.Details
replace int. spiral staircase with new staircase. reconfigure master bedroom and bath at 2nd floor. remodel kitchen and 2 baths at 3rd floor. | $56,000 |
| Mar 21, 2013 | Completed final sign-off Nov 2014 | 754 Ulloa St | 1st flr-rear extension behind garage non conditioned space. 2nd flr add 1 bedroom at new rear extension reconfigure (e) plan to include living/dining room,kitchen, bath. 3rd flr. adition to include 1 bedroom bath, family room, new deck over second fl.Details
1st flr-rear extension behind garage non conditioned space. 2nd flr add 1 bedroom at new rear extension reconfigure (e) plan to include living/dining room,kitchen, bath. 3rd flr. adition to include 1 bedroom bath, family room, new deck over second fl. | $140,000 |
| Mar 18, 2013 | Never finaled issued Mar 2013, no final | 69 Scott St | remove 3 bathrooms, toilets, vanity, tile sheetrock remove 1 old kitchen cabinet, couter tops, sheetrock, remove flooring and carpet througout house, no change on walls & openings.Details
remove 3 bathrooms, toilets, vanity, tile sheetrock remove 1 old kitchen cabinet, couter tops, sheetrock, remove flooring and carpet througout house, no change on walls & openings. | $1,500 |
| Dec 4, 2012 | Completed final sign-off Aug 2013 | 338 Noriega St | renovation of (e) kitchen, removal of partitions between dining room & replacement of one (e) skylight.Details
renovation of (e) kitchen, removal of partitions between dining room & replacement of one (e) skylight. | $20,000 |
| Nov 27, 2012 | Completed final sign-off Aug 2013 | 1219 11th Av | replace stairs to second fl. relocate entry to interior stairs to first fl. remodel kitchen, add 1/2 bath @ 2nd fl. build 25 addition @ 2nd flat rear yard. new 7x20 deck at rear yard w/ stairs to yard.Details
replace stairs to second fl. relocate entry to interior stairs to first fl. remodel kitchen, add 1/2 bath @ 2nd fl. build 25 addition @ 2nd flat rear yard. new 7x20 deck at rear yard w/ stairs to yard. | $38,000 |
| Nov 1, 2011 | Completed final sign-off Mar 2012 | 70 Lurline St | remodel one bathroom and one kitchen. new cabinets and island, enlarge door opening through to dining room, replace 5 windows. some facing street, same size and location.Details
remodel one bathroom and one kitchen. new cabinets and island, enlarge door opening through to dining room, replace 5 windows. some facing street, same size and location. | $20,000 |
| Sep 16, 2011 | Completed final sign-off Feb 2012 | 925 Cabrillo St | interior renovation/in kind stair replacemnt, in-fill under bldg, unit #927-create new kitchen space, remove (e) kitchen to create bathrm, remove (e) bathrm to create office. unit #925-new internal stairs, in kind replacemnt of non code compliant exterior rear stairs. minor modification for bldg codDetails
interior renovation/in kind stair replacemnt, in-fill under bldg, unit #927-create new kitchen space, remove (e) kitchen to create bathrm, remove (e) bathrm to create office. unit #925-new internal stairs, in kind replacemnt of non code compliant exterior rear stairs. minor modification for bldg cod | $50,000 |
| May 11, 2011 | Completed final sign-off Dec 2011 | 720 27th St | interior remodel: new master suite, new 1/2 bath, new kitchen cabinets, appliances, replace front entry door at 2nd fl, new tub and vanity at 1st fl, elec, plumbing, new skylightsDetails
interior remodel: new master suite, new 1/2 bath, new kitchen cabinets, appliances, replace front entry door at 2nd fl, new tub and vanity at 1st fl, elec, plumbing, new skylights | $105,385 |
| Mar 16, 2011 | Completed final sign-off Aug 2011 | 1115 Diamond St | new stair connecting extg ground level to 1st floor,new ground level bathroom, reconfigure extg kitchen and bath at 1st floor, remove extg shower at 2nd level, reconfigure lighting.Details
new stair connecting extg ground level to 1st floor,new ground level bathroom, reconfigure extg kitchen and bath at 1st floor, remove extg shower at 2nd level, reconfigure lighting. | $70,000 |
| Jan 19, 2010 | Completed final sign-off Mar 2010 | 45 Cleary Ct | unit#10: replace cabinets, replace tile floor, hook-up new hood, new sink, new outlets , new garbage disposal for kitchen work.Details
unit#10: replace cabinets, replace tile floor, hook-up new hood, new sink, new outlets , new garbage disposal for kitchen work. | $6,500 |