Back to bathroom remodel contractors
Bespoke Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2010 to Sep 2017
- Last 24 months
- 0 permits filed
47 permits since 2000: 44 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 22 completed, 1 never finaled. Typically 5 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2015 | Completed final sign-off Feb 2016 | 25 Coleridge St | 2nd floor kitchen & bath remodel, stair reconfiguration & partitoin wall reconfiguration. replace windows not visible from street.Details
2nd floor kitchen & bath remodel, stair reconfiguration & partitoin wall reconfiguration. replace windows not visible from street. | $25,000 |
| Feb 18, 2015 | Completed final sign-off Dec 2017 | 235 San Anselmo Av | kitchen and bath remodel. new windows and doors like kind in rear only. n/a for the maher. compliance with maher ordinance no 155-13 not required.Details
kitchen and bath remodel. new windows and doors like kind in rear only. n/a for the maher. compliance with maher ordinance no 155-13 not required. | $150,000 |
| Jan 20, 2015 | Completed final sign-off Mar 2015 | 121 Hugo St | bathroom remodel to include remove (e) tub & install one shower stall, new tile, new vanity, replace toilet, no change on walls.Details
bathroom remodel to include remove (e) tub & install one shower stall, new tile, new vanity, replace toilet, no change on walls. | $6,000 |
| Dec 4, 2014 | Completed final sign-off Oct 2015 | 75 Mercedes Wy | kitchen remodel, 1/2 bath relocation, new windows & doors at side & rear yard, not visable from street. new deck at side yard, bathroom remodel, bathroom addition.Details
kitchen remodel, 1/2 bath relocation, new windows & doors at side & rear yard, not visable from street. new deck at side yard, bathroom remodel, bathroom addition. | $150,000 |
| Mar 28, 2014 | Completed final sign-off Nov 2014 | 754 Ulloa St | revision to appl #2013.0321.2771 - convert storage area @ 1st floor to family room, bedroom, bath, laundry. remove enclosure @ bottom of stairs.Details
revision to appl #2013.0321.2771 - convert storage area @ 1st floor to family room, bedroom, bath, laundry. remove enclosure @ bottom of stairs. | $15,000 |
| Oct 21, 2013 | Completed final sign-off Apr 2015 | 155 Dorchester Wy | 1st floor-enclose landing at new stairs & add laundry & study rooms. 2nd floor-relocate interior stairs, remodel kitchen & bathroom. add bathroom & closet at bedroom. remove walls at kitchen & living roomDetails
1st floor-enclose landing at new stairs & add laundry & study rooms. 2nd floor-relocate interior stairs, remodel kitchen & bathroom. add bathroom & closet at bedroom. remove walls at kitchen & living room | $85,000 |
| Oct 15, 2013 | Completed final sign-off Aug 2014 | 167 Alhambra St | 1st floor-remodel rooms behind garage to include new interior stairs, bathroom, 1 bedroom, family room w (n) fireplace. 2nd floor-reconfigure walls at kitchen & remodel kitchenDetails
1st floor-remodel rooms behind garage to include new interior stairs, bathroom, 1 bedroom, family room w (n) fireplace. 2nd floor-reconfigure walls at kitchen & remodel kitchen | $86,000 |
| May 14, 2013 | Completed final sign-off Aug 2013 | 1219 11th Av | bathroom remodel: replacement of fixtures in kind.Details
bathroom remodel: replacement of fixtures in kind. | $50,000 |
| Apr 18, 2013 | Completed final sign-off Oct 2013 | 3843 26th St | re-configure master bathroom & closet. remove 2nd bathroom @2nd floor. add half bathroom @2nd floor @ (e) porch. add skylight at master bathroom. horizontal addition: enclosed porch for new half bathroom.Details
re-configure master bathroom & closet. remove 2nd bathroom @2nd floor. add half bathroom @2nd floor @ (e) porch. add skylight at master bathroom. horizontal addition: enclosed porch for new half bathroom. | $24,000 |
| Apr 4, 2013 | Completed final sign-off Sep 2013 | 69 Scott St | replace int. spiral staircase with new staircase. reconfigure master bedroom and bath at 2nd floor. remodel kitchen and 2 baths at 3rd floor.Details
replace int. spiral staircase with new staircase. reconfigure master bedroom and bath at 2nd floor. remodel kitchen and 2 baths at 3rd floor. | $56,000 |
| Mar 21, 2013 | Completed final sign-off Nov 2014 | 754 Ulloa St | 1st flr-rear extension behind garage non conditioned space. 2nd flr add 1 bedroom at new rear extension reconfigure (e) plan to include living/dining room,kitchen, bath. 3rd flr. adition to include 1 bedroom bath, family room, new deck over second fl.Details
1st flr-rear extension behind garage non conditioned space. 2nd flr add 1 bedroom at new rear extension reconfigure (e) plan to include living/dining room,kitchen, bath. 3rd flr. adition to include 1 bedroom bath, family room, new deck over second fl. | $140,000 |
| Mar 18, 2013 | Never finaled issued Mar 2013, no final | 69 Scott St | remove 3 bathrooms, toilets, vanity, tile sheetrock remove 1 old kitchen cabinet, couter tops, sheetrock, remove flooring and carpet througout house, no change on walls & openings.Details
remove 3 bathrooms, toilets, vanity, tile sheetrock remove 1 old kitchen cabinet, couter tops, sheetrock, remove flooring and carpet througout house, no change on walls & openings. | $1,500 |
| Jan 28, 2013 | Completed final sign-off Apr 2013 | 729 Bay St | bathroom remodel, replace vanities, shower valve, tub, replace tile in shower, walls and floor, install new lightingDetails
bathroom remodel, replace vanities, shower valve, tub, replace tile in shower, walls and floor, install new lighting | $10,000 |
| Nov 27, 2012 | Completed final sign-off Aug 2013 | 1219 11th Av | replace stairs to second fl. relocate entry to interior stairs to first fl. remodel kitchen, add 1/2 bath @ 2nd fl. build 25 addition @ 2nd flat rear yard. new 7x20 deck at rear yard w/ stairs to yard.Details
replace stairs to second fl. relocate entry to interior stairs to first fl. remodel kitchen, add 1/2 bath @ 2nd fl. build 25 addition @ 2nd flat rear yard. new 7x20 deck at rear yard w/ stairs to yard. | $38,000 |
| Nov 21, 2012 | Completed final sign-off May 2013 | 441 Valley St | 1st fl, legalize family room to (n) bedroom, (n) bathroom & laundry closet in ground fl. replace (e) water heater & furnace. construct (n) bearing wall w/ (n) footing. 2nd fl, remove bearing wall @ dining room & install (n) beams.Details
1st fl, legalize family room to (n) bedroom, (n) bathroom & laundry closet in ground fl. replace (e) water heater & furnace. construct (n) bearing wall w/ (n) footing. 2nd fl, remove bearing wall @ dining room & install (n) beams. | $41,000 |
| Sep 12, 2012 | Completed final sign-off Jan 2013 | 428 Sanchez St | convert existing closet into half bathroom and storage. addition would include: toilet, sink+faucet, cabinet, lighting fixtures + outlet, window.Details
convert existing closet into half bathroom and storage. addition would include: toilet, sink+faucet, cabinet, lighting fixtures + outlet, window. | $5,000 |
| Feb 16, 2012 | Completed final sign-off Nov 2012 | 3843 26th St | interior remodel on ground floor: select demolition, new bedrooms, bath, playroom, new plbg fixtures, no structural, rebuild interior stair, n add steel spiral stair @ exterior, 2 new windows, 1 exterior door.Details
interior remodel on ground floor: select demolition, new bedrooms, bath, playroom, new plbg fixtures, no structural, rebuild interior stair, n add steel spiral stair @ exterior, 2 new windows, 1 exterior door. | $50,000 |
| Dec 1, 2011 | Completed final sign-off Mar 2012 | 70 Lurline St | revision to 201111018029. revised framing detail at 2nd fl bathDetails
revision to 201111018029. revised framing detail at 2nd fl bath | |
| Nov 1, 2011 | Completed final sign-off Mar 2012 | 70 Lurline St | remodel one bathroom and one kitchen. new cabinets and island, enlarge door opening through to dining room, replace 5 windows. some facing street, same size and location.Details
remodel one bathroom and one kitchen. new cabinets and island, enlarge door opening through to dining room, replace 5 windows. some facing street, same size and location. | $20,000 |
| May 13, 2011 | Completed final sign-off Sep 2011 | 729 Lawton St | remodel existing 1st floor bath, new window and sliding door, new deck at 1st fl roof, new deck to replace existing at gr levelDetails
remodel existing 1st floor bath, new window and sliding door, new deck at 1st fl roof, new deck to replace existing at gr level | $40,000 |
| May 11, 2011 | Completed final sign-off Dec 2011 | 720 27th St | interior remodel: new master suite, new 1/2 bath, new kitchen cabinets, appliances, replace front entry door at 2nd fl, new tub and vanity at 1st fl, elec, plumbing, new skylightsDetails
interior remodel: new master suite, new 1/2 bath, new kitchen cabinets, appliances, replace front entry door at 2nd fl, new tub and vanity at 1st fl, elec, plumbing, new skylights | $105,385 |
| Mar 16, 2011 | Completed final sign-off Aug 2011 | 1115 Diamond St | new stair connecting extg ground level to 1st floor,new ground level bathroom, reconfigure extg kitchen and bath at 1st floor, remove extg shower at 2nd level, reconfigure lighting.Details
new stair connecting extg ground level to 1st floor,new ground level bathroom, reconfigure extg kitchen and bath at 1st floor, remove extg shower at 2nd level, reconfigure lighting. | $70,000 |
| Apr 12, 2010 | Completed final sign-off Jun 2010 | 1416 Jackson St | convert (e) sunroom to bathroom. install new door from (e) bedroom to (e) deck. door replace (e) window.Details
convert (e) sunroom to bathroom. install new door from (e) bedroom to (e) deck. door replace (e) window. | $11,000 |