Back to kitchen remodel contractors
Ben Hardy & Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Jun 2026
- Last 24 months
- 5 permits filed
26 permits since 2000: 19 completed, 5 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 in progress. Typically 46 days from filing to permit and 990 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2024 | Completed final sign-off Feb 2025 | 233 Liberty St | kitchen and bathroom in kind with (n) fixture locationsDetails
kitchen and bathroom in kind with (n) fixture locations | $50,000 |
| Aug 2, 2024 | In progress issued Aug 2024 | 882 Carolina St | 2 kitchen remodels, cagework replacement in bathroomsDetails
2 kitchen remodels, cagework replacement in bathrooms | $75,000 |
| Jul 10, 2023 | Completed final sign-off Mar 2024 | 257 Collingwood St | in-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $50,000 |
| Dec 2, 2020 | Completed final sign-off Jan 2026 | 482 20th Av | interior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft.Details
interior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft. | $110,000 |
| Nov 19, 2020 | Completed final sign-off Nov 2024 | 2105 20th St | convert (e) two-car garage area to ground floor adu looking onto rear yard and 20th street. (n) adu to be entirely within (e) building envelope. (n) adu to be type va construction and be sprinklered per cbc 903.3.1.1 or 903.3.1.2. (n) adu to contain: living room, kitchen, (1) bath, (1) bedroom.Details
convert (e) two-car garage area to ground floor adu looking onto rear yard and 20th street. (n) adu to be entirely within (e) building envelope. (n) adu to be type va construction and be sprinklered per cbc 903.3.1.1 or 903.3.1.2. (n) adu to contain: living room, kitchen, (1) bath, (1) bedroom. | $180,000 |
| May 13, 2020 | Completed final sign-off Apr 2023 | 2832 Sacramento St | remodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street.Details
remodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street. | $100,000 |