Back to bathroom remodel contractors
Ben Hardy & Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Jun 2026
- Last 24 months
- 5 permits filed
26 permits since 2000: 19 completed, 5 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 1 in progress, 1 expired or cancelled. Typically 6 days from filing to permit and 420 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2024 | Completed final sign-off Feb 2025 | 233 Liberty St | kitchen and bathroom in kind with (n) fixture locationsDetails
kitchen and bathroom in kind with (n) fixture locations | $50,000 |
| Aug 2, 2024 | In progress issued Aug 2024 | 882 Carolina St | 2 kitchen remodels, cagework replacement in bathroomsDetails
2 kitchen remodels, cagework replacement in bathrooms | $75,000 |
| Jul 10, 2023 | Completed final sign-off Mar 2024 | 257 Collingwood St | in-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $50,000 |
| Jun 27, 2023 | Completed final sign-off Dec 2023 | 701 Rhode Island St | in kind bathroom remodelDetails
in kind bathroom remodel | $75,000 |
| Jun 23, 2023 | Expired or cancelled cancelled Jan 2026 | 701 Rhode Island St | in-kind bathroom remodel.Details
in-kind bathroom remodel. | $75,000 |
| Nov 10, 2022 | Completed final sign-off May 2023 | 482 20th Av | revision to bpa#202012020056, reduction of scope to interior renov of (1)bath & (1.5)bath, replace some windows, stucco in-kind front only. no change to building volume, no structural work. this scope is less than original permitted scope. this scope replaces previously permitted scope.Details
revision to bpa#202012020056, reduction of scope to interior renov of (1)bath & (1.5)bath, replace some windows, stucco in-kind front only. no change to building volume, no structural work. this scope is less than original permitted scope. this scope replaces previously permitted scope. | |
| Aug 19, 2022 | Completed final sign-off Aug 2023 | 821 Dolores St | in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s). | $100,000 |
| Jan 28, 2021 | Completed final sign-off Jul 2025 | 128 Woodland Av | interior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work.Details
interior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work. | $140,000 |
| Jan 11, 2021 | Completed final sign-off Apr 2023 | 2832 Sacramento St | remodel 2 existing bathrooms. replace with new fixtures & finishes. no fixtures added.Details
remodel 2 existing bathrooms. replace with new fixtures & finishes. no fixtures added. | $25,000 |
| Dec 2, 2020 | Completed final sign-off Jan 2026 | 482 20th Av | interior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft.Details
interior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft. | $110,000 |
| Nov 19, 2020 | Completed final sign-off Nov 2024 | 2105 20th St | convert (e) two-car garage area to ground floor adu looking onto rear yard and 20th street. (n) adu to be entirely within (e) building envelope. (n) adu to be type va construction and be sprinklered per cbc 903.3.1.1 or 903.3.1.2. (n) adu to contain: living room, kitchen, (1) bath, (1) bedroom.Details
convert (e) two-car garage area to ground floor adu looking onto rear yard and 20th street. (n) adu to be entirely within (e) building envelope. (n) adu to be type va construction and be sprinklered per cbc 903.3.1.1 or 903.3.1.2. (n) adu to contain: living room, kitchen, (1) bath, (1) bedroom. | $180,000 |
| Sep 12, 2020 | Completed final sign-off Sep 2021 | 558 Alvarado St | remodel at 3rd floor single family residence. demo of partitions of (e) walls, finishes, & bathroom. remodel includes relocating (e) bedrooms, master bath/closet, & addition of 3 skylights. no exteiror facade work. other work includes addition of new & alteration of (e) casework.Details
remodel at 3rd floor single family residence. demo of partitions of (e) walls, finishes, & bathroom. remodel includes relocating (e) bedrooms, master bath/closet, & addition of 3 skylights. no exteiror facade work. other work includes addition of new & alteration of (e) casework. | $110,000 |
| May 13, 2020 | Completed final sign-off Apr 2023 | 2832 Sacramento St | remodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street.Details
remodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street. | $100,000 |
| Jun 20, 2019 | Completed final sign-off Oct 2020 | 1146 Florida St | interior remodel of bathrooms, railings, details, replace gas fireplace, replace 2 windows in-kind at rear, add new skylight, reapair waterproofing at deck, replace stone tile at front stair. legalize stucco facage and replaced garage door.Details
interior remodel of bathrooms, railings, details, replace gas fireplace, replace 2 windows in-kind at rear, add new skylight, reapair waterproofing at deck, replace stone tile at front stair. legalize stucco facage and replaced garage door. | $150,000 |