Permit GraphShortlistSan Francisco building permits since 2000

Ben Hardy & Company

Contractor license
1042613
State license record
Based in
San Francisco
On San Francisco permits
Jun 2019 to Jun 2026
Last 24 months
5 permits filed

26 permits since 2000: 19 completed, 5 in progress, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 1Stairs 3Kitchen remodel 6Bathroom remodel 14

14 bathroom remodel permits: 12 completed, 1 in progress, 1 expired or cancelled. Typically 6 days from filing to permit and 420 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 29, 2024Completed
final sign-off Feb 2025
233 Liberty Stkitchen and bathroom in kind with (n) fixture locations
Details
Permit
202408299782
Status
complete
Filed
Aug 29, 2024
Permit issued
Aug 30, 2024
Final sign-off
Feb 18, 2025
Declared cost
$50,000
Address
233 Liberty St

kitchen and bathroom in kind with (n) fixture locations

Open the permit page

$50,000
Aug 2, 2024In progress
issued Aug 2024
882 Carolina St2 kitchen remodels, cagework replacement in bathrooms
Details
Permit
202408027863
Status
issued
Filed
Aug 2, 2024
Permit issued
Aug 8, 2024
Declared cost
$75,000
Address
882 Carolina St

2 kitchen remodels, cagework replacement in bathrooms

Open the permit page

$75,000
Jul 10, 2023Completed
final sign-off Mar 2024
257 Collingwood Stin-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).
Details
Permit
202307101778
Status
complete
Filed
Jul 10, 2023
Permit issued
Jul 10, 2023
Final sign-off
Mar 14, 2024
Declared cost
$50,000
Address
257 Collingwood St

in-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).

Open the permit page

$50,000
Jun 27, 2023Completed
final sign-off Dec 2023
701 Rhode Island Stin kind bathroom remodel
Details
Permit
202306270980
Status
complete
Filed
Jun 27, 2023
Permit issued
Jun 27, 2023
Final sign-off
Dec 11, 2023
Declared cost
$75,000
Address
701 Rhode Island St

in kind bathroom remodel

Open the permit page

$75,000
Jun 23, 2023Expired or cancelled
cancelled Jan 2026
701 Rhode Island Stin-kind bathroom remodel.
Details
Permit
202306230726
Status
cancelled
Filed
Jun 23, 2023
Declared cost
$75,000
Address
701 Rhode Island St

in-kind bathroom remodel.

Open the permit page

$75,000
Nov 10, 2022Completed
final sign-off May 2023
482 20th Avrevision to bpa#202012020056, reduction of scope to interior renov of (1)bath & (1.5)bath, replace some windows, stucco in-kind front only. no change to building volume, no structural work. this scope is less than original permitted scope. this scope replaces previously permitted scope.
Details
Permit
202211106299
Status
complete
Filed
Nov 10, 2022
Permit issued
Nov 10, 2022
Final sign-off
May 11, 2023
Address
482 20th Av

revision to bpa#202012020056, reduction of scope to interior renov of (1)bath & (1.5)bath, replace some windows, stucco in-kind front only. no change to building volume, no structural work. this scope is less than original permitted scope. this scope replaces previously permitted scope.

Open the permit page

Aug 19, 2022Completed
final sign-off Aug 2023
821 Dolores Stin-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s).
Details
Permit
202208190950
Status
complete
Filed
Aug 19, 2022
Permit issued
Aug 19, 2022
Final sign-off
Aug 28, 2023
Declared cost
$100,000
Address
821 Dolores St

in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s).

Open the permit page

$100,000
Jan 28, 2021Completed
final sign-off Jul 2025
128 Woodland Avinterior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work.
Details
Permit
202101283493
Status
complete
Filed
Jan 28, 2021
Permit issued
May 7, 2021
Final sign-off
Jul 2, 2025
Declared cost
$140,000
Address
128 Woodland Av

interior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work.

Open the permit page

$140,000
Jan 11, 2021Completed
final sign-off Apr 2023
2832 Sacramento Stremodel 2 existing bathrooms. replace with new fixtures & finishes. no fixtures added.
Details
Permit
202101112415
Status
complete
Filed
Jan 11, 2021
Permit issued
Jan 11, 2021
Final sign-off
Apr 24, 2023
Declared cost
$25,000
Address
2832 Sacramento St

remodel 2 existing bathrooms. replace with new fixtures & finishes. no fixtures added.

Open the permit page

$25,000
Dec 2, 2020Completed
final sign-off Jan 2026
482 20th Avinterior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft.
Details
Permit
202012020056
Status
complete
Filed
Dec 2, 2020
Permit issued
Jul 29, 2021
Final sign-off
Jan 7, 2026
Declared cost
$110,000
Address
482 20th Av

interior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft.

Open the permit page

$110,000
Nov 19, 2020Completed
final sign-off Nov 2024
2105 20th Stconvert (e) two-car garage area to ground floor adu looking onto rear yard and 20th street. (n) adu to be entirely within (e) building envelope. (n) adu to be type va construction and be sprinklered per cbc 903.3.1.1 or 903.3.1.2. (n) adu to contain: living room, kitchen, (1) bath, (1) bedroom.
Details
Permit
202011199318
Status
complete
Filed
Nov 19, 2020
Permit issued
Oct 26, 2021
Final sign-off
Nov 18, 2024
Declared cost
$180,000
Address
2105 20th St

convert (e) two-car garage area to ground floor adu looking onto rear yard and 20th street. (n) adu to be entirely within (e) building envelope. (n) adu to be type va construction and be sprinklered per cbc 903.3.1.1 or 903.3.1.2. (n) adu to contain: living room, kitchen, (1) bath, (1) bedroom.

Open the permit page

$180,000
Sep 12, 2020Completed
final sign-off Sep 2021
558 Alvarado Stremodel at 3rd floor single family residence. demo of partitions of (e) walls, finishes, & bathroom. remodel includes relocating (e) bedrooms, master bath/closet, & addition of 3 skylights. no exteiror facade work. other work includes addition of new & alteration of (e) casework.
Details
Permit
202009124059
Status
complete
Filed
Sep 12, 2020
Permit issued
Oct 7, 2020
Final sign-off
Sep 7, 2021
Declared cost
$110,000
Address
558 Alvarado St

remodel at 3rd floor single family residence. demo of partitions of (e) walls, finishes, & bathroom. remodel includes relocating (e) bedrooms, master bath/closet, & addition of 3 skylights. no exteiror facade work. other work includes addition of new & alteration of (e) casework.

Open the permit page

$110,000
May 13, 2020Completed
final sign-off Apr 2023
2832 Sacramento Stremodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street.
Details
Permit
202005137501
Status
complete
Filed
May 13, 2020
Permit issued
Aug 7, 2020
Final sign-off
Apr 24, 2023
Declared cost
$100,000
Address
2832 Sacramento St

remodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street.

Open the permit page

$100,000
Jun 20, 2019Completed
final sign-off Oct 2020
1146 Florida Stinterior remodel of bathrooms, railings, details, replace gas fireplace, replace 2 windows in-kind at rear, add new skylight, reapair waterproofing at deck, replace stone tile at front stair. legalize stucco facage and replaced garage door.
Details
Permit
201906204057
Status
complete
Filed
Jun 20, 2019
Permit issued
Jun 28, 2019
Final sign-off
Oct 6, 2020
Declared cost
$150,000
Address
1146 Florida St

interior remodel of bathrooms, railings, details, replace gas fireplace, replace 2 windows in-kind at rear, add new skylight, reapair waterproofing at deck, replace stone tile at front stair. legalize stucco facage and replaced garage door.

Open the permit page

$150,000