Back to bathroom remodel contractors
Belfor Usa Group Inc
- Based in
- Hayward
- On San Francisco permits
- Nov 2004 to Sep 2026
- Last 24 months
- 8 permits filed
71 permits since 2000: 53 completed, 6 in progress, 11 never finaled, 1 expired or cancelled.
Of the 11 never-finaled permits, 5 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 1 in progress, 2 never finaled. Typically 9 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | In progress issued May 2026 | 2801 Broadway | restoration repairs from water leaks - like kind quality, wet bar, guest bathrooms (3), primary bath, water closetDetails
restoration repairs from water leaks - like kind quality, wet bar, guest bathrooms (3), primary bath, water closet | $100,000 |
| Mar 13, 2026 | Completed final sign-off Aug 2026 | 1285 Sutter St | unit 407: install insulation, drywall, texture, and paint on all walls in kitchen, bathroom, living room, bathroom, and hallway. to comply with nov 202547985.Details
unit 407: install insulation, drywall, texture, and paint on all walls in kitchen, bathroom, living room, bathroom, and hallway. to comply with nov 202547985. | $10,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 1662 Union St | replace insulation and drywall flood cuts, hardwood floor and bathroom tile floor.Details
replace insulation and drywall flood cuts, hardwood floor and bathroom tile floor. | $25,000 |
| Dec 5, 2023 | Completed final sign-off Apr 2024 | 222 Taylor St | for unit#: 615 and 813; remove and replace cabinets. remove and replace floors. detach and reset toilets. detach and reset kitchen applicances. drywall patch. like for like partial kitchen and bath remodels.Details
for unit#: 615 and 813; remove and replace cabinets. remove and replace floors. detach and reset toilets. detach and reset kitchen applicances. drywall patch. like for like partial kitchen and bath remodels. | $51,000 |
| Aug 20, 2019 | Completed final sign-off Nov 2021 | 546 Panorama Dr | repair and remodel fire damaged residence arear of repair - 1536 sf. adding living 185 sqft (new bedroom, bathroom, sitting room)Details
repair and remodel fire damaged residence arear of repair - 1536 sf. adding living 185 sqft (new bedroom, bathroom, sitting room) | $75,000 |
| Aug 3, 2018 | Completed final sign-off Oct 2018 | 1837 Polk St | ceiling replacement dryw wall ada bath & new ele also to abate 201708951Details
ceiling replacement dryw wall ada bath & new ele also to abate 201708951 | $20,000 |
| Dec 8, 2017 | Completed final sign-off Feb 2019 | 1833 Polk St | repair to fire damage & add ada bath, upgrades. remove & replace electrical, repair some 2x framing, ceiling joist, remove and replace roof framing per plan.Details
repair to fire damage & add ada bath, upgrades. remove & replace electrical, repair some 2x framing, ceiling joist, remove and replace roof framing per plan. | $20,000 |
| Dec 8, 2017 | Completed final sign-off Feb 2019 | 1829 Polk St | repair to fire damage & add ada bath. remove & replace electrical, repair, upgrades, 2x framing.Details
repair to fire damage & add ada bath. remove & replace electrical, repair, upgrades, 2x framing. | $20,000 |
| Nov 17, 2016 | Completed final sign-off Mar 2017 | 805 University St | replace fire damange framing/siding/roofing. new drywall, paint, caprets, cabinets, bathtub. repair - in-like kind" per original plans: kitchen bathroom, living room and as need. ref pa#293548Details
replace fire damange framing/siding/roofing. new drywall, paint, caprets, cabinets, bathtub. repair - in-like kind" per original plans: kitchen bathroom, living room and as need. ref pa#293548 | $50,000 |
| Apr 21, 2016 | Completed final sign-off Sep 2016 | 5343 Diamond Heights Bl | #a- smoke damage repair, new ducting, existing furnace to remain, replace all drywall throughout, like for like, replace electrical outlets as needed, replace 3 windows u factor 0.32, replace all kitchens & bath cabinets, counters & sinks, replace hvac ductwork, no life safety work included.Details
#a- smoke damage repair, new ducting, existing furnace to remain, replace all drywall throughout, like for like, replace electrical outlets as needed, replace 3 windows u factor 0.32, replace all kitchens & bath cabinets, counters & sinks, replace hvac ductwork, no life safety work included. | $40,000 |
| Oct 22, 2015 | Never finaled issued Oct 2015, no final | 1443 Chinook Ct | remove fire damaged drywall (300 sqft) insulation (200 sq ft), unit 1443. remove interior doors, floor finishes, carpet, bathroom tile walls. remove hvac duct and seven registers, remove 4 windows, 1 set patio doors at deck soffit. soft demo of fire damagedDetails
remove fire damaged drywall (300 sqft) insulation (200 sq ft), unit 1443. remove interior doors, floor finishes, carpet, bathroom tile walls. remove hvac duct and seven registers, remove 4 windows, 1 set patio doors at deck soffit. soft demo of fire damaged | $40,000 |
| Jul 30, 2015 | Never finaled issued Mar 2016, no final | 2215 19th Av | replace damage drywall, replace insulation. replace cabinet in bathroom. replace roof sheeting, repair 3 cut rafters per fire damage.Details
replace damage drywall, replace insulation. replace cabinet in bathroom. replace roof sheeting, repair 3 cut rafters per fire damage. | $5,000 |
| Sep 24, 2014 | Completed final sign-off May 2015 | 1028 Capitol Av | exploratory demolition. all sheetrock per 2nd floor. floor covering kit-bath fixtures. building permit under separate application per fire report dated 9/18/14Details
exploratory demolition. all sheetrock per 2nd floor. floor covering kit-bath fixtures. building permit under separate application per fire report dated 9/18/14 | $20,000 |
| Apr 9, 2013 | Completed final sign-off May 2014 | 819 Ulloa St | to comply with complaint #201271221. bldg improvements for fire repair, for upstairs apt. including new bathrooms (2) & kitchen & rear deck. downstairs commerical shell improvement of bathroom and entry to meet ada requirement.Details
to comply with complaint #201271221. bldg improvements for fire repair, for upstairs apt. including new bathrooms (2) & kitchen & rear deck. downstairs commerical shell improvement of bathroom and entry to meet ada requirement. | $300,000 |
| Apr 15, 2009 | Completed final sign-off Apr 2009 | 403 Main St | replacement of water damaged sheetrock and insulation above tub in the bathroom (5/8 type x drywall approx 15 sq. ft)Details
replacement of water damaged sheetrock and insulation above tub in the bathroom (5/8 type x drywall approx 15 sq. ft) | $1,200 |