Beam Construction Enterprises Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2020 to Aug 2026
- Last 24 months
- 15 permits filed
48 permits since 2000: 38 completed, 4 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 in progress. Typically 10 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Aug 2026 | 3542 24th St | revision 202404240674- replace 42 in half wall guard at stairs of unit 1 at second and third floors with full floor to ceiling wall at kitchen and office. see sheet a1.3.Details
revision 202404240674- replace 42 in half wall guard at stairs of unit 1 at second and third floors with full floor to ceiling wall at kitchen and office. see sheet a1.3. | |
| Aug 13, 2025 | Completed final sign-off Dec 2025 | 643 Taraval St | to comply with nov # 202539112. interior stair replacement in kind and same configuration.Details
to comply with nov # 202539112. interior stair replacement in kind and same configuration. | $30,000 |
| May 10, 2024 | Completed final sign-off Sep 2026 | 3542 24th St | flr 1: new fdn. convert 1,009 sf of garage/storage to habitable space for unit 1. add 1.5 baths, and add int stair. flr 2: unit 1 remodel kitchen, (2) baths, and laundry, connect flr 1 with int stair. flr 3: unit 2 relocate kitchen and bath. unit 1 (#3542)add bath, office, and int stair flr 2 to 3.Details
flr 1: new fdn. convert 1,009 sf of garage/storage to habitable space for unit 1. add 1.5 baths, and add int stair. flr 2: unit 1 remodel kitchen, (2) baths, and laundry, connect flr 1 with int stair. flr 3: unit 2 relocate kitchen and bath. unit 1 (#3542)add bath, office, and int stair flr 2 to 3. | $817,500 |
| Apr 25, 2022 | Completed final sign-off Jun 2022 | 725 Clayton St | repair dryrot at front stairs- less than 50%. repair in kind.Details
repair dryrot at front stairs- less than 50%. repair in kind. | $5,000 |