Back to bathroom remodel contractors
Beam Construction Enterprises Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2020 to Aug 2026
- Last 24 months
- 15 permits filed
48 permits since 2000: 38 completed, 4 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 376 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 888 Corbett Av | ground floor remodel to include full bath, mudroom, bedroom, living rmDetails
ground floor remodel to include full bath, mudroom, bedroom, living rm | $55,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 21 Divisadero St | remove and dispose carpet flooring in kitchen and living room, replace with hardwood, remove and replace hardwood in bathroom, replace bathroom tiles. floor only.Details
remove and dispose carpet flooring in kitchen and living room, replace with hardwood, remove and replace hardwood in bathroom, replace bathroom tiles. floor only. | $2,800 |
| Apr 30, 2025 | Completed final sign-off Oct 2025 | 2287 14th Av | kitchen, bathroom, powder room remodel of 1/f = 300 sq ft. no expansion, in-kind remodeling only. update all plumbing, electrical, & mech to code. current windows to remain. flooring to be refinished. tile in powder bath. dining room will be altered with new electrical and cabinetry.Details
kitchen, bathroom, powder room remodel of 1/f = 300 sq ft. no expansion, in-kind remodeling only. update all plumbing, electrical, & mech to code. current windows to remain. flooring to be refinished. tile in powder bath. dining room will be altered with new electrical and cabinetry. | $125,000 |
| Apr 16, 2025 | Completed final sign-off Apr 2025 | 4112 21st St | administrative permit to document bathroom count of 5 as per permits 201705096079, 201909060951 and 202406043662Details
administrative permit to document bathroom count of 5 as per permits 201705096079, 201909060951 and 202406043662 | |
| Dec 19, 2024 | Completed final sign-off Jan 2026 | 460 South Van Ness Av | unit #11: remodel kitchen and bathroom in kind.Details
unit #11: remodel kitchen and bathroom in kind. | $50,000 |
| Jun 27, 2024 | Completed final sign-off Jun 2025 | 1407 Francisco St | unit #10: comply w/ nov# 202424307; repair apartment inkind, due to fire damage. demolish to studs re-wire entire space insulate sheetrock and re-install kitchen and bath room in-kindDetails
unit #10: comply w/ nov# 202424307; repair apartment inkind, due to fire damage. demolish to studs re-wire entire space insulate sheetrock and re-install kitchen and bath room in-kind | $90,000 |
| May 10, 2024 | Completed final sign-off Sep 2026 | 3542 24th St | flr 1: new fdn. convert 1,009 sf of garage/storage to habitable space for unit 1. add 1.5 baths, and add int stair. flr 2: unit 1 remodel kitchen, (2) baths, and laundry, connect flr 1 with int stair. flr 3: unit 2 relocate kitchen and bath. unit 1 (#3542)add bath, office, and int stair flr 2 to 3.Details
flr 1: new fdn. convert 1,009 sf of garage/storage to habitable space for unit 1. add 1.5 baths, and add int stair. flr 2: unit 1 remodel kitchen, (2) baths, and laundry, connect flr 1 with int stair. flr 3: unit 2 relocate kitchen and bath. unit 1 (#3542)add bath, office, and int stair flr 2 to 3. | $817,500 |
| Jan 26, 2024 | Completed final sign-off Feb 2026 | 4205 22nd St | 2nd fl bathroom remodel, reconstruct bedroom closet, replace like for like windows (side & front facing), refinish floorsDetails
2nd fl bathroom remodel, reconstruct bedroom closet, replace like for like windows (side & front facing), refinish floors | $75,000 |
| Jun 5, 2023 | Completed final sign-off Nov 2025 | 4332 24th St | interior remodel, expand into (e)garage to 2/f, remodel kitchen, guest bath, primary bath & dining room, new skylight, replacement windows @ rear yard only.Details
interior remodel, expand into (e)garage to 2/f, remodel kitchen, guest bath, primary bath & dining room, new skylight, replacement windows @ rear yard only. | $269,488 |
| Mar 10, 2023 | Completed final sign-off Jan 2024 | 1387 Hayes St | remodel bathroom, in kind, in unit# 2. remodel kitchen and bathroon, in kind, in unit# 12. no structural changes.Details
remodel bathroom, in kind, in unit# 2. remodel kitchen and bathroon, in kind, in unit# 12. no structural changes. | $50,000 |
| May 24, 2022 | Never finaled issued Jun 2022, no final | 10 Imperial Al | update 1st flr kitchen,dining rm, water closet. adding elect fireplace to living rm. update 2nd flr guest bath, primary suite, + vault ceiling. add full (n) primary bath, skylight + solar tube. update all plumbing, elect, lighting, vent fans + fixtures. update hvac.Details
update 1st flr kitchen,dining rm, water closet. adding elect fireplace to living rm. update 2nd flr guest bath, primary suite, + vault ceiling. add full (n) primary bath, skylight + solar tube. update all plumbing, elect, lighting, vent fans + fixtures. update hvac. | $250,000 |
| Apr 12, 2022 | Completed final sign-off Aug 2023 | 164 Delmar St | new garage door 4 side door. new heat pump. remodel master suite and hall bath. resurface (e) roof deck. insulate attic replace skylights, re-roof. solar panels under seperate permitDetails
new garage door 4 side door. new heat pump. remodel master suite and hall bath. resurface (e) roof deck. insulate attic replace skylights, re-roof. solar panels under seperate permit | $95,000 |
| Mar 30, 2022 | Completed final sign-off Mar 2023 | 398 Pennsylvania Av | interior alteration & skylight addition; 1st fl - manufactured spa tub in rear; pedestal decking, repplace carpet; 2nd fl - replace closet sliding door; 3rd fl - (n) carpet, (n) hardwood in kitchen; 4th fl - add skylight & remodel (e) bath w/(n) fixtures finishes & cab.Details
interior alteration & skylight addition; 1st fl - manufactured spa tub in rear; pedestal decking, repplace carpet; 2nd fl - replace closet sliding door; 3rd fl - (n) carpet, (n) hardwood in kitchen; 4th fl - add skylight & remodel (e) bath w/(n) fixtures finishes & cab. | $90,000 |