Back to kitchen remodel contractors
Bayward Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Apr 2026
- Last 24 months
- 5 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 2 days from filing to permit and 783 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2025 | Completed final sign-off Jan 2026 | 246 Casitas Av | (3) bathroom and (1) kitchen remodels, like for like replacement. no (n) electrical or plumbing.Details
(3) bathroom and (1) kitchen remodels, like for like replacement. no (n) electrical or plumbing. | $95,000 |
| Mar 21, 2023 | Completed final sign-off Jan 2026 | 404 Marietta Dr | enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylightsDetails
enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylights | $187,000 |
| Sep 3, 2021 | Completed final sign-off Mar 2022 | 3629 25th St | repair water damage to unit (in kind) 30% insulation: 30% sheetrock (in-kind) replace kitchen (in kind) same footprintDetails
repair water damage to unit (in kind) 30% insulation: 30% sheetrock (in-kind) replace kitchen (in kind) same footprint | $43,000 |
| Sep 27, 2018 | Completed final sign-off Aug 2025 | 2007 15th Av | no change to building footprint. 1st fl - reconfigure bath, lower floor in (e) art studio. 2nd fl - remodel kitchen & bath; replace windows @ front floor 2Details
no change to building footprint. 1st fl - reconfigure bath, lower floor in (e) art studio. 2nd fl - remodel kitchen & bath; replace windows @ front floor 2 | $145,000 |
| Mar 15, 2017 | Completed final sign-off Jun 2019 | 1494 Rhode Island St | no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage.Details
no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage. | $250,000 |