Back to bathroom remodel contractors
Bayward Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Apr 2026
- Last 24 months
- 5 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 never finaled. Typically 1 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2026 | Completed final sign-off Jul 2026 | 905 Florida St | like for like - upper unint. bathroom remodel. no exterior work.Details
like for like - upper unint. bathroom remodel. no exterior work. | $26,480 |
| Jun 13, 2025 | Completed final sign-off Jan 2026 | 246 Casitas Av | (3) bathroom and (1) kitchen remodels, like for like replacement. no (n) electrical or plumbing.Details
(3) bathroom and (1) kitchen remodels, like for like replacement. no (n) electrical or plumbing. | $95,000 |
| Nov 10, 2023 | Completed final sign-off Feb 2025 | 400 France Av | remodel 2nd fl. bathroom, remodel/reconfigure 1st fl. to new bedroom, bathroom, den and laundry roof. replace (e) vinly rock siding with stuccoDetails
remodel 2nd fl. bathroom, remodel/reconfigure 1st fl. to new bedroom, bathroom, den and laundry roof. replace (e) vinly rock siding with stucco | $100,000 |
| Jun 28, 2023 | Completed final sign-off Nov 2023 | 3629 25th St | partial bathroom remodel (repairs). replace bathtub and tile enclosure. replace tile floor due to water damageDetails
partial bathroom remodel (repairs). replace bathtub and tile enclosure. replace tile floor due to water damage | $10,000 |
| Mar 21, 2023 | Completed final sign-off Jan 2026 | 404 Marietta Dr | enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylightsDetails
enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylights | $187,000 |
| Jan 28, 2022 | Completed final sign-off May 2024 | 148 Otsego Av | rear building. convert (e) 450 sf worksthop at back of lot to home office with bathroom & utility sink.Details
rear building. convert (e) 450 sf worksthop at back of lot to home office with bathroom & utility sink. | $127,000 |
| Nov 8, 2021 | Completed final sign-off Mar 2022 | 4406 20th St | bathroom remodel (in-kind). no layout change, no stud wall demo.Details
bathroom remodel (in-kind). no layout change, no stud wall demo. | $15,000 |
| Oct 25, 2020 | Never finaled issued Mar 2022, no final | 647 Edinburgh St | 1st fl: add (n) bath with minor expansion under (e) rear fl 2 deck. remodel bedrm, bath & laundry. reconfigure rear deck & exterior stair. (n) 1 hr wall @ north & south p.l. 2nd fl: remove (e) exterior stair @ rear. repair (e) deck & replace railings. add 1 hr wall @ south deck. no interior work.Details
1st fl: add (n) bath with minor expansion under (e) rear fl 2 deck. remodel bedrm, bath & laundry. reconfigure rear deck & exterior stair. (n) 1 hr wall @ north & south p.l. 2nd fl: remove (e) exterior stair @ rear. repair (e) deck & replace railings. add 1 hr wall @ south deck. no interior work. | $75,000 |
| Sep 27, 2018 | Completed final sign-off Aug 2025 | 2007 15th Av | no change to building footprint. 1st fl - reconfigure bath, lower floor in (e) art studio. 2nd fl - remodel kitchen & bath; replace windows @ front floor 2Details
no change to building footprint. 1st fl - reconfigure bath, lower floor in (e) art studio. 2nd fl - remodel kitchen & bath; replace windows @ front floor 2 | $145,000 |
| Apr 13, 2018 | Completed final sign-off Oct 2018 | 135 San Benito Wy | bathroom remodel/repairs. replace tile floors, shower pan/enclosure, vanity/sink, toilet. move sconce lightDetails
bathroom remodel/repairs. replace tile floors, shower pan/enclosure, vanity/sink, toilet. move sconce light | $12,000 |
| Mar 15, 2017 | Completed final sign-off Jun 2019 | 1494 Rhode Island St | no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage.Details
no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage. | $250,000 |