Back to kitchen remodel contractors
Baytex Corp.
- Based in
- Foster City
- On San Francisco permits
- Oct 2002 to Aug 2010
- Last 24 months
- 0 permits filed
28 permits since 2000: 14 completed, 1 never finaled, 13 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 344 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2010 | Expired or cancelled expired Apr 2013 | 225 Granville Wy | a kitchen remodel and a basement conversion to living rm, bedroom, one full bath rm and laundry area. work to include new windows, elec, plbg, new hvac and a new water heaterDetails
a kitchen remodel and a basement conversion to living rm, bedroom, one full bath rm and laundry area. work to include new windows, elec, plbg, new hvac and a new water heater | $100,000 |
| Jun 16, 2008 | Completed final sign-off Oct 2008 | 254 Day St | in place kitchen remodel, new fixtures & finishes. remove (e) cavity and remove pony wallDetails
in place kitchen remodel, new fixtures & finishes. remove (e) cavity and remove pony wall | $10,000 |
| Jan 23, 2008 | Completed final sign-off May 2009 | 548 Vermont St | both units -relocate kitchen/bath, reconfig. int walls, reconfig. deck & stair to yard (lower unit only). replace siding w/8" channel rustic to achieve consistent,new furnace,new windows, reconfig. rear windows. upper unit only - add stair to attic,add dormerd bath @ attic.Details
both units -relocate kitchen/bath, reconfig. int walls, reconfig. deck & stair to yard (lower unit only). replace siding w/8" channel rustic to achieve consistent,new furnace,new windows, reconfig. rear windows. upper unit only - add stair to attic,add dormerd bath @ attic. | $150,000 |
| Nov 16, 2007 | Completed final sign-off Mar 2009 | 552 Vermont St | remodel kitchen and bath, relocate kitchen,remove 1 bath, remove raised slab, remove /replace stair and adjacent wall, remove and replace all windows and doors w/ metal framed,add insulation, repair replace roof,reconfigure partitions,new tankless water heaterDetails
remodel kitchen and bath, relocate kitchen,remove 1 bath, remove raised slab, remove /replace stair and adjacent wall, remove and replace all windows and doors w/ metal framed,add insulation, repair replace roof,reconfigure partitions,new tankless water heater | $70,000 |
| Jul 7, 2006 | Completed final sign-off Apr 2007 | 340 Colon Av | kitchen remodel and stairs to basement existing remove powder roomsDetails
kitchen remodel and stairs to basement existing remove powder rooms | $60,000 |