Baytex Corp.
- Based in
- Foster City
- On San Francisco permits
- Oct 2002 to Aug 2010
- Last 24 months
- 0 permits filed
28 permits since 2000: 14 completed, 1 never finaled, 13 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 64 days from filing to permit and 411 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2008 | Completed final sign-off May 2009 | 548 Vermont St | both units -relocate kitchen/bath, reconfig. int walls, reconfig. deck & stair to yard (lower unit only). replace siding w/8" channel rustic to achieve consistent,new furnace,new windows, reconfig. rear windows. upper unit only - add stair to attic,add dormerd bath @ attic.Details
both units -relocate kitchen/bath, reconfig. int walls, reconfig. deck & stair to yard (lower unit only). replace siding w/8" channel rustic to achieve consistent,new furnace,new windows, reconfig. rear windows. upper unit only - add stair to attic,add dormerd bath @ attic. | $150,000 |