Back to kitchen remodel contractors
Baytel
- Based in
- Davis
- On San Francisco permits
- May 2025 to May 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 in progress. Typically 492 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2025 | In progress issued Sep 2026 | 28 Lupine Av | remodel existing kitchen; primary suite bathroom to be remodeled. the east wall will be moved 12" into the closet. existing shower will be made larger; 2nd bathroom will have new tile floor and shower surround. new electrical and lighting in kitchen bathrooms and will meet title 24 requirement.Details
remodel existing kitchen; primary suite bathroom to be remodeled. the east wall will be moved 12" into the closet. existing shower will be made larger; 2nd bathroom will have new tile floor and shower surround. new electrical and lighting in kitchen bathrooms and will meet title 24 requirement. | $100,000 |