Baytel
- Based in
- Davis
- On San Francisco permits
- May 2025 to May 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 130 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2026 | In progress issued Sep 2026 | 26 Lupine Av | (e) upper deck off of condo will be repaired & replaced in-kind guardrails will be changed to hogwire panels, (e) lower deck off of studio to be repaired & replaced w/extending 3'-8", (n) guardrail to be installed. guardrail shall be hogwire panels. stairs will extend from lower deck into backDetails
(e) upper deck off of condo will be repaired & replaced in-kind guardrails will be changed to hogwire panels, (e) lower deck off of studio to be repaired & replaced w/extending 3'-8", (n) guardrail to be installed. guardrail shall be hogwire panels. stairs will extend from lower deck into back | $60,000 |