Back to kitchen remodel contractors
Bayside Remodeling & Construction
- Based in
- Mill Valey
- On San Francisco permits
- Jun 2013 to Aug 2026
- Last 24 months
- 4 permits filed
30 permits since 2000: 28 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 never finaled. Typically 1 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2023 | Completed final sign-off Nov 2024 | 703 Chenery St | upgrade and make kitchen and bathroom look beautiful again. redo sheetrock. install new insulation per sf codes. prime and paint complete inerior. install new sheetrock. prime and paint. non structural remodel. no walls removed.Details
upgrade and make kitchen and bathroom look beautiful again. redo sheetrock. install new insulation per sf codes. prime and paint complete inerior. install new sheetrock. prime and paint. non structural remodel. no walls removed. | $250,000 |
| Sep 8, 2022 | Completed final sign-off Jul 2023 | 1574 41st Av | kitchen remodel: replace existing cabinets and sheetrock with all new. new counter tops and new paint.Details
kitchen remodel: replace existing cabinets and sheetrock with all new. new counter tops and new paint. | $39,250 |
| Dec 20, 2021 | Completed final sign-off Jul 2022 | 1906 Lyon St | unit #1: small bathroom + kitchen remodel in-kind.Details
unit #1: small bathroom + kitchen remodel in-kind. | $42,150 |
| Sep 19, 2019 | Completed final sign-off Dec 2019 | 402 Fair Oaks St | remove old kitchen cabinets, install new kitchen cabinets in sameDetails
remove old kitchen cabinets, install new kitchen cabinets in same | $30,000 |
| Dec 14, 2016 | Completed final sign-off Sep 2017 | 1558 Church St | this is for 1558a church st.studio remove plaster & lath, install insulation & new electrical . remodel bathroom & kitchen, repalce lath & plaster with 5/8" type x gyp board, no walls to be altered.Details
this is for 1558a church st.studio remove plaster & lath, install insulation & new electrical . remodel bathroom & kitchen, repalce lath & plaster with 5/8" type x gyp board, no walls to be altered. | $50,000 |
| Oct 21, 2016 | Completed final sign-off Dec 2018 | 863 Ocean Av | change of use. remodel to restore original r-2 occupancy. 2 new kitchens shall be built in their original location. extg fire alarm to be removed. see pre-app mtg. minutes dated 6/16/16Details
change of use. remodel to restore original r-2 occupancy. 2 new kitchens shall be built in their original location. extg fire alarm to be removed. see pre-app mtg. minutes dated 6/16/16 | $30,000 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 1558 Church St | bathroom. kitchen and laundry room remodel no change on walls. all new lighting are leds at least 30" clearance btw cabinet & cook top. laundry room light to be controlled by occuoancy sensorDetails
bathroom. kitchen and laundry room remodel no change on walls. all new lighting are leds at least 30" clearance btw cabinet & cook top. laundry room light to be controlled by occuoancy sensor | $130,000 |
| Aug 13, 2015 | Completed final sign-off May 2016 | 1077 Dolores St | remodel kitchen - remove non-structural wall. r&r windows 3 along back of structure. replace in-kind. max u-factor 0.32.Details
remodel kitchen - remove non-structural wall. r&r windows 3 along back of structure. replace in-kind. max u-factor 0.32. | $10,000 |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 790 07th Av | replace kitchen cabinets and countertops. no change on walls.Details
replace kitchen cabinets and countertops. no change on walls. | $17,000 |