Back to bathroom remodel contractors
Bayside Remodeling & Construction
- Based in
- Mill Valey
- On San Francisco permits
- Jun 2013 to Aug 2026
- Last 24 months
- 4 permits filed
30 permits since 2000: 28 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 12 completed, 1 in progress. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 2438 15th St | bathroom remodel due to water damage, new tiles, new shower tiles, install new sheetrock walls, install new vanity and toilet, tub to shower conversion.Details
bathroom remodel due to water damage, new tiles, new shower tiles, install new sheetrock walls, install new vanity and toilet, tub to shower conversion. | $28,750 |
| Jun 11, 2026 | Completed final sign-off Aug 2026 | 131 Cleo Rand Av | cosmetic bathroom remodel. new vanities. new tile in stall shower. replace prefab with custom tile floor. smooth texture on walls, prime and paint.Details
cosmetic bathroom remodel. new vanities. new tile in stall shower. replace prefab with custom tile floor. smooth texture on walls, prime and paint. | $35,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 247 Bella Vista Wy | bathroom remodel: like for like, remove bathtub, shower existing; will need shower pan inspection.Details
bathroom remodel: like for like, remove bathtub, shower existing; will need shower pan inspection. | $25,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2024 | 701 Chenery St | install all new insulation and sheetrock entire unit. install new floor covering. remodel (1) bathroom like new. update and install new electrical. prime and paint all walls textures. install new lighting . install new entry door, per sf code.Details
install all new insulation and sheetrock entire unit. install new floor covering. remodel (1) bathroom like new. update and install new electrical. prime and paint all walls textures. install new lighting . install new entry door, per sf code. | $145,000 |
| May 12, 2023 | Completed final sign-off Nov 2024 | 703 Chenery St | upgrade and make kitchen and bathroom look beautiful again. redo sheetrock. install new insulation per sf codes. prime and paint complete inerior. install new sheetrock. prime and paint. non structural remodel. no walls removed.Details
upgrade and make kitchen and bathroom look beautiful again. redo sheetrock. install new insulation per sf codes. prime and paint complete inerior. install new sheetrock. prime and paint. non structural remodel. no walls removed. | $250,000 |
| Dec 20, 2021 | Completed final sign-off Jul 2022 | 1906 Lyon St | unit #1: small bathroom + kitchen remodel in-kind.Details
unit #1: small bathroom + kitchen remodel in-kind. | $42,150 |
| Apr 29, 2021 | Completed final sign-off Jun 2021 | 751 42nd Av | bathroom remodelDetails
bathroom remodel | $28,000 |
| Mar 25, 2021 | Completed final sign-off May 2021 | 753 42nd Av | remodel bathroom, change bathtub & vanity, change lights & paint. no layout change, no wall framing demoDetails
remodel bathroom, change bathtub & vanity, change lights & paint. no layout change, no wall framing demo | $31,175 |
| Feb 25, 2020 | Completed final sign-off Apr 2020 | 1556 Church St | replace failing lath & plaster with approved sheetrock. replace failing knob and tube electrical with approved electrical. replace insulation that was removed. r eplace failing tile in bathroom. all work will be done only in interior.Details
replace failing lath & plaster with approved sheetrock. replace failing knob and tube electrical with approved electrical. replace insulation that was removed. r eplace failing tile in bathroom. all work will be done only in interior. | $25,000 |
| Jun 3, 2019 | Completed final sign-off Dec 2019 | 402 Fair Oaks St | remodel (e) 3rd flr bathroom. add (n) bathroom on 3rd flr. no exterior workDetails
remodel (e) 3rd flr bathroom. add (n) bathroom on 3rd flr. no exterior work | $20,000 |
| Dec 14, 2016 | Completed final sign-off Sep 2017 | 1558 Church St | this is for 1558a church st.studio remove plaster & lath, install insulation & new electrical . remodel bathroom & kitchen, repalce lath & plaster with 5/8" type x gyp board, no walls to be altered.Details
this is for 1558a church st.studio remove plaster & lath, install insulation & new electrical . remodel bathroom & kitchen, repalce lath & plaster with 5/8" type x gyp board, no walls to be altered. | $50,000 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 1558 Church St | bathroom. kitchen and laundry room remodel no change on walls. all new lighting are leds at least 30" clearance btw cabinet & cook top. laundry room light to be controlled by occuoancy sensorDetails
bathroom. kitchen and laundry room remodel no change on walls. all new lighting are leds at least 30" clearance btw cabinet & cook top. laundry room light to be controlled by occuoancy sensor | $130,000 |
| Aug 28, 2015 | Completed final sign-off Mar 2016 | 193 Day St | remodel (e) bathroom and add new bathroom in (e) bonus room. n/a maher ord. # 155-13Details
remodel (e) bathroom and add new bathroom in (e) bonus room. n/a maher ord. # 155-13 | $45,000 |