Back to kitchen remodel contractors
Bay General Contractor
- Based in
- Menlo Park
- On San Francisco permits
- Feb 2010 to Oct 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2018 | Completed final sign-off Aug 2018 | 240 Lombard St | kitchen remodel: replace cabinets and appliances (dishwasher, range, sink), replace 5 lights and upgrade all outlets, all replacements are in-kind. kitchen are 60' sq. ft. lighting per cec 150.0 (k)Details
kitchen remodel: replace cabinets and appliances (dishwasher, range, sink), replace 5 lights and upgrade all outlets, all replacements are in-kind. kitchen are 60' sq. ft. lighting per cec 150.0 (k) | $12,000 |
| Aug 3, 2017 | Completed final sign-off Apr 2018 | 1001 Pine St | apt 307: kitchen remodel: replace cabinets & appliances, replace tiles in bathroom., replace ceiling lights, all replacmeent in-kind (same location).Details
apt 307: kitchen remodel: replace cabinets & appliances, replace tiles in bathroom., replace ceiling lights, all replacmeent in-kind (same location). | $10,000 |
| Nov 30, 2015 | Completed final sign-off Mar 2016 | 475 Huron Av | update kitchen with new sink, d/w, disposak, electrical outlets, coutertops, use (e) cabs, bathroom remodel: tub, sink, shower, tile, plumbing, electrical, no change on wall.Details
update kitchen with new sink, d/w, disposak, electrical outlets, coutertops, use (e) cabs, bathroom remodel: tub, sink, shower, tile, plumbing, electrical, no change on wall. | $40,000 |
| Sep 2, 2014 | Completed final sign-off Sep 2014 | 463 Buena Vista East Av | kitchen cabinet replacement, no structural, no mechanical, no electrical, no plumbing.Details
kitchen cabinet replacement, no structural, no mechanical, no electrical, no plumbing. | $5,000 |
| Mar 20, 2014 | Completed final sign-off May 2014 | 355 01st St | replace kitchen cabinet and counter top.Details
replace kitchen cabinet and counter top. | $5,000 |
| Feb 21, 2013 | Completed final sign-off Apr 2013 | 1755 Filbert St | work in unit 23: install new cabinet and granite countertop in kitchen.Details
work in unit 23: install new cabinet and granite countertop in kitchen. | $9,000 |