Back to bathroom remodel contractors
Bay General Contractor
- Based in
- Menlo Park
- On San Francisco permits
- Feb 2010 to Oct 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 2 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2017 | Completed final sign-off Apr 2018 | 1001 Pine St | apt 307: kitchen remodel: replace cabinets & appliances, replace tiles in bathroom., replace ceiling lights, all replacmeent in-kind (same location).Details
apt 307: kitchen remodel: replace cabinets & appliances, replace tiles in bathroom., replace ceiling lights, all replacmeent in-kind (same location). | $10,000 |
| Nov 30, 2015 | Completed final sign-off Mar 2016 | 475 Huron Av | update kitchen with new sink, d/w, disposak, electrical outlets, coutertops, use (e) cabs, bathroom remodel: tub, sink, shower, tile, plumbing, electrical, no change on wall.Details
update kitchen with new sink, d/w, disposak, electrical outlets, coutertops, use (e) cabs, bathroom remodel: tub, sink, shower, tile, plumbing, electrical, no change on wall. | $40,000 |
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 590 04th Av | unit 201: remodel bathroom, swan stone 5 foot by 6 foot 1 piece, 2 peice of 3 foot by 6 foot shower plumbing, install 24 inch or 36 inch handicap rails. tileDetails
unit 201: remodel bathroom, swan stone 5 foot by 6 foot 1 piece, 2 peice of 3 foot by 6 foot shower plumbing, install 24 inch or 36 inch handicap rails. tile | $3,200 |
| Feb 19, 2010 | Completed final sign-off Mar 2010 | 594 Clipper St | add new bathroom on 2nd fl in existing family roomDetails
add new bathroom on 2nd fl in existing family room | $10,000 |