Back to kitchen remodel contractors
Bay C T Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Aug 2026
- Last 24 months
- 33 permits filed
299 permits since 2000: 216 completed, 18 in progress, 38 never finaled, 27 expired or cancelled.
Of the 38 never-finaled permits, 7 are 3 to 5 years old, 20 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
95 kitchen remodel permits: 67 completed, 5 in progress, 6 never finaled, 17 expired or cancelled. Typically 4 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 506 Holyoke St | 1/f: provide rooms down consisting of (2) bedrooms, (2) bathrooms, an office, and a kitchenette. relocate existing water heater and furnace within garage.Details
1/f: provide rooms down consisting of (2) bedrooms, (2) bathrooms, an office, and a kitchenette. relocate existing water heater and furnace within garage. | $95,000 |
| Jan 22, 2026 | In progress issued Jan 2026 | 26 Fairmount St | remodel (e) kitchen, add 2 bathroom at 3/f. remodel (e) bathroom at attic floor.Details
remodel (e) kitchen, add 2 bathroom at 3/f. remodel (e) bathroom at attic floor. | $100,000 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 239 Sawyer St | kitchen, bathroom, recessed lighting remodel. no layout change, like to likeDetails
kitchen, bathroom, recessed lighting remodel. no layout change, like to like | $20,000 |
| Oct 24, 2025 | Completed final sign-off Sep 2026 | 1283 Gilman Av | remodel (e) kitchen, bathroom. add1 new bath & replace (e) sheetrock w/ new at 2/f. construct 1 bedroom, 1 study room, 1 bathroom, media room & wet bar at g/f.Details
remodel (e) kitchen, bathroom. add1 new bath & replace (e) sheetrock w/ new at 2/f. construct 1 bedroom, 1 study room, 1 bathroom, media room & wet bar at g/f. | $268,000 |
| Sep 23, 2025 | Completed final sign-off Jul 2026 | 1009 South Van Ness Av | unit #1009: relocate (e) kitchen, bathroom. convert (e) kitchen space to bedroom & replace (e) sheetrock w/ new. all work at g/f.Details
unit #1009: relocate (e) kitchen, bathroom. convert (e) kitchen space to bedroom & replace (e) sheetrock w/ new. all work at g/f. | $138,000 |
| Jul 3, 2025 | Completed final sign-off Aug 2025 | 37 Niagara Av | revision to 202506189009 remodel one bathroom, no removal of walls, replace sheetrock in one wall of the kitchenDetails
revision to 202506189009 remodel one bathroom, no removal of walls, replace sheetrock in one wall of the kitchen | $8,000 |
| Jul 2, 2025 | Completed final sign-off Jul 2026 | 522 26th Av | 1st/fl: rear addition with new bedroom and bathroom. at 2nd/fl:remodel existing kitchen and bathroom. new bedroom and bathroom and new roof deck over 1st floor addition.Details
1st/fl: rear addition with new bedroom and bathroom. at 2nd/fl:remodel existing kitchen and bathroom. new bedroom and bathroom and new roof deck over 1st floor addition. | $159,000 |
| Jun 18, 2025 | Completed final sign-off Aug 2025 | 37 Niagara Av | replace (e) kitchen countertops and cabinets in kind. new electrical subpanel. new electrical wiring for two bedrooms one kitchen. living room, and one bathroom.Details
replace (e) kitchen countertops and cabinets in kind. new electrical subpanel. new electrical wiring for two bedrooms one kitchen. living room, and one bathroom. | $8,600 |
| Mar 12, 2025 | Completed final sign-off May 2025 | 2930 Pacheco St | kitchen remodel in kind. (only changing the cabinets)Details
kitchen remodel in kind. (only changing the cabinets) | $8,000 |
| Nov 20, 2024 | Expired or cancelled expired Jun 2026 | 358 Vienna St | remodel one kitchen and one bathroom in kind. replace (e) bathtub in kind. update 125m add one subpanel. no change to floor layout. no change to wall layout. no structural work.Details
remodel one kitchen and one bathroom in kind. replace (e) bathtub in kind. update 125m add one subpanel. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Sep 24, 2024 | Completed final sign-off Dec 2024 | 144 Oshaughnessy Bl | remodel (e) kitchen, replace counter, cabinets, sink & relocate kitchen opening at 2/f.Details
remodel (e) kitchen, replace counter, cabinets, sink & relocate kitchen opening at 2/f. | $32,000 |
| Sep 9, 2024 | Completed final sign-off Mar 2025 | 1643 Cabrillo St | 2/f: (unit 1643) remodel (e) kitchen, laundry, and bathroom. (n) full bath and water heater. 3/f: (unit 1647) remodel (e) kitchen, laundry, and bathroom. (n) full bath and water heater.Details
2/f: (unit 1643) remodel (e) kitchen, laundry, and bathroom. (n) full bath and water heater. 3/f: (unit 1647) remodel (e) kitchen, laundry, and bathroom. (n) full bath and water heater. | $140,000 |
| Sep 5, 2024 | Completed final sign-off Apr 2025 | 821 Judah St | convert closet to powder room at 3/f. remodel (e) kitchen, 2 bathroom at 2/f. legalize (e) space to family room, one full bath, & install kitchenette at g/f.Details
convert closet to powder room at 3/f. remodel (e) kitchen, 2 bathroom at 2/f. legalize (e) space to family room, one full bath, & install kitchenette at g/f. | $183,000 |
| Aug 19, 2024 | Completed final sign-off Jan 2025 | 2928 Pacheco St | revision to approved pa #202405061483: install 2 (n) skylights at 2/f bathroom. enlarge (e) skylight at kitchen. install (n) sliding door at g/f.Details
revision to approved pa #202405061483: install 2 (n) skylights at 2/f bathroom. enlarge (e) skylight at kitchen. install (n) sliding door at g/f. | $2,000 |
| Aug 5, 2024 | In progress issued Aug 2024 | 2148 17th Av | new interior layout @ kitchen area (ie ope kitchen layout) new kitchen island, and relocation of interior stair. no work to the front. new furnace.Details
new interior layout @ kitchen area (ie ope kitchen layout) new kitchen island, and relocation of interior stair. no work to the front. new furnace. | $100,000 |
| May 6, 2024 | Completed final sign-off Jan 2025 | 2928 Pacheco St | remodel (e) kitchen and bathroom, construct (n) bathroom on 2/f. remove walls at living room, dining room, ktichen area. remodel (e) bathroom at g/f. construct (n) laundry room at g/f.Details
remodel (e) kitchen and bathroom, construct (n) bathroom on 2/f. remove walls at living room, dining room, ktichen area. remodel (e) bathroom at g/f. construct (n) laundry room at g/f. | $110,000 |
| Jan 12, 2024 | Completed final sign-off May 2024 | 4044 18th St | revision to approved pa# 202307242825 & 202310188946. remodel (e) 1/f unit (4044) kitchen bedrooms and bathroom; new bath, laudnry, dining and toilet room, remodel (e) dining to bedrooms.Details
revision to approved pa# 202307242825 & 202310188946. remodel (e) 1/f unit (4044) kitchen bedrooms and bathroom; new bath, laudnry, dining and toilet room, remodel (e) dining to bedrooms. | $89,500 |
| Dec 28, 2023 | Completed final sign-off Apr 2024 | 593 20th Av | 3/f unit 593 20th ave: add new full bath and remodel (e) living room to bedroom, remodel (e) kitchen & bath, new laundry, and new light fixture & outlets.Details
3/f unit 593 20th ave: add new full bath and remodel (e) living room to bedroom, remodel (e) kitchen & bath, new laundry, and new light fixture & outlets. | $87,500 |
| Sep 1, 2023 | Completed final sign-off May 2024 | 4044 18th St | to reinstate a bathroom, a kitchen, lighting in bedroom due to structural upgrade in basement and tenant was relocated temporary. now due the foundation is done sot have to reinstate in order have tenenat reoccupy the unit.Details
to reinstate a bathroom, a kitchen, lighting in bedroom due to structural upgrade in basement and tenant was relocated temporary. now due the foundation is done sot have to reinstate in order have tenenat reoccupy the unit. | $10,000 |
| Aug 29, 2023 | Completed final sign-off Jun 2026 | 1791 17th Av | g/f interior remodeling consist of an addition of 1 bedroom, 1 bathroom, new entertainment room, & relocation of (e) bathroom. add a kitchenette w/ 2 or less burner w/ no full size oven. seismic upgrade at ground floor.Details
g/f interior remodeling consist of an addition of 1 bedroom, 1 bathroom, new entertainment room, & relocation of (e) bathroom. add a kitchenette w/ 2 or less burner w/ no full size oven. seismic upgrade at ground floor. | $150,000 |
| Aug 25, 2023 | Completed final sign-off Nov 2023 | 1370 11th Av | 3rd flr unit#1: interior remodel, add new full bath, remodel e bathroom and kitchen, new laundry, new light fixtures.Details
3rd flr unit#1: interior remodel, add new full bath, remodel e bathroom and kitchen, new laundry, new light fixtures. | $40,000 |
| Aug 25, 2023 | Completed final sign-off Jul 2026 | 262 32nd Av | infill (e) north light well, rebuilt modify (e) rear 1-level wood deck at 1st fl, new media, home office and new bedroom with excavation. 2nd fl remodel (e) kitchen, new pantry, toilet room. 3rd fl, remodel (e) bath, master bath and walkin. new laundryDetails
infill (e) north light well, rebuilt modify (e) rear 1-level wood deck at 1st fl, new media, home office and new bedroom with excavation. 2nd fl remodel (e) kitchen, new pantry, toilet room. 3rd fl, remodel (e) bath, master bath and walkin. new laundry | $198,000 |
| Jul 24, 2023 | Completed final sign-off May 2024 | 4040 18th St | remodel 2nd floor (4042) and 3rd floor (4044). relocate/remodel kitchen and (e) bathroom. provide (n) master medroom and (n) bathroom; bathroom for (e) bedroom; new wiring and light fixtures; and (n) w/h and furnaces. repair (e) dryrot rear wall and winows at sunroom, all floors.Details
remodel 2nd floor (4042) and 3rd floor (4044). relocate/remodel kitchen and (e) bathroom. provide (n) master medroom and (n) bathroom; bathroom for (e) bedroom; new wiring and light fixtures; and (n) w/h and furnaces. repair (e) dryrot rear wall and winows at sunroom, all floors. | $190,000 |
| Jun 7, 2023 | Completed final sign-off Oct 2023 | 506 Holyoke St | upgrade electrical throughout the house. interior remodel on second flr for one bathroom -replace shower/tub, vanity, toilet and flooring and kitchen - replace cabinets, counter, sink.Details
upgrade electrical throughout the house. interior remodel on second flr for one bathroom -replace shower/tub, vanity, toilet and flooring and kitchen - replace cabinets, counter, sink. | $25,000 |
| Jan 10, 2023 | Completed final sign-off Jun 2023 | 597 20th Av | at 2nd floor, interior remodel for unit(597 20th ave). add new full bathroom and convert (e) living room to (n) bedroom, add new stack up washer & dryer; remove (e) n0n-bearing wall b/w kitchen & living.Details
at 2nd floor, interior remodel for unit(597 20th ave). add new full bathroom and convert (e) living room to (n) bedroom, add new stack up washer & dryer; remove (e) n0n-bearing wall b/w kitchen & living. | $19,000 |
| Nov 30, 2022 | Completed final sign-off Apr 2024 | 3829 Geary Bl | at 2nd/f, interior remodel (e) both unis (a+b): remodel (e) kitchen, bathroom & bedroom, add 1 full bathroom in each unit. comply w/ nov 202180236/ add (n) heating sys, comply w/nov 202180225, add 2 new skylights. remove cover over lightwellDetails
at 2nd/f, interior remodel (e) both unis (a+b): remodel (e) kitchen, bathroom & bedroom, add 1 full bathroom in each unit. comply w/ nov 202180236/ add (n) heating sys, comply w/nov 202180225, add 2 new skylights. remove cover over lightwell | $96,700 |
| Oct 20, 2022 | Completed final sign-off Jan 2023 | 1370 11th Av | unit 2: remodel kitchen and bath, 1 bedroom unit replace kitchen cabinets, toilet, floor tile. drywall,no chang layout or wall.add framing studs. lighing comply with cel 150Details
unit 2: remodel kitchen and bath, 1 bedroom unit replace kitchen cabinets, toilet, floor tile. drywall,no chang layout or wall.add framing studs. lighing comply with cel 150 | $30,000 |
| Aug 24, 2022 | Completed final sign-off Nov 2022 | 1443 29th Av | rev to pa 202201266701 @ 2nd floor, change kitchen configuration per paln. change home office to dining. new 2 x 4 skylight.Details
rev to pa 202201266701 @ 2nd floor, change kitchen configuration per paln. change home office to dining. new 2 x 4 skylight. | $1,000 |
| Jun 28, 2022 | Never finaled issued Aug 2022, no final | 24 Fairmount St | comply with nov 202292145, 202292503. (front bldg) 1st fl garage, provide new plywood and anchor bolts to e walls i kind 2nd fl. relocate remodel e kitchen, remodel e bath and bedroom.remove/replace all dry rotted wood stud and floor joist in general. repair e garage door.rear window furnace.Details
comply with nov 202292145, 202292503. (front bldg) 1st fl garage, provide new plywood and anchor bolts to e walls i kind 2nd fl. relocate remodel e kitchen, remodel e bath and bedroom.remove/replace all dry rotted wood stud and floor joist in general. repair e garage door.rear window furnace. | $75,000 |
| Jun 21, 2022 | Completed final sign-off Apr 2023 | 1011 South Van Ness Av | relocate (e) kitchen, bathroom. construct 1 (n) half bath. repair (e) deck in-kind & replace (e) sheetrock w/ new at 2nd floor (unit 1011a). relocate (e) kitchen, bathroom. construct 1 (n) half bath. repair (e) deck in-kind & replace (e) sheetrock w/ new at 3rd floor (unit 1011).Details
relocate (e) kitchen, bathroom. construct 1 (n) half bath. repair (e) deck in-kind & replace (e) sheetrock w/ new at 2nd floor (unit 1011a). relocate (e) kitchen, bathroom. construct 1 (n) half bath. repair (e) deck in-kind & replace (e) sheetrock w/ new at 3rd floor (unit 1011). | $120,000 |
| Mar 8, 2022 | Completed final sign-off Aug 2022 | 2626 23rd Av | 1st fl: provide 2 (n) bedrooms, (n) bathroom, (n) family room, (n) laundry & (n) wetbar. 2nd fl: remodel & relocate (e) kitchen, 2 (n) bathrooms, (n) 1 level deck. remodel (e) interior stair.Details
1st fl: provide 2 (n) bedrooms, (n) bathroom, (n) family room, (n) laundry & (n) wetbar. 2nd fl: remodel & relocate (e) kitchen, 2 (n) bathrooms, (n) 1 level deck. remodel (e) interior stair. | $130,000 |
| Feb 15, 2022 | Completed final sign-off Oct 2022 | 1370 11th Av | apt 5. remodel one bathroom and kitchen.replace drywall whre necessary. no change of layout. no change of wall and framing stud.lighting shall comply with cec150.0(k).Details
apt 5. remodel one bathroom and kitchen.replace drywall whre necessary. no change of layout. no change of wall and framing stud.lighting shall comply with cec150.0(k). | $30,000 |
| Jan 26, 2022 | Completed final sign-off Nov 2022 | 1443 29th Av | 1/f: new study, new 2 baths, new media room with wet bar, and remodel (e) bedroom. 2/f: remodel/relocate (e) bathroom and kitchen, new home office, and new bathroom at bedroom, infill (e) lightwell at north, new 1-level wood deck at rear yard. no change to front facade or garage door.Details
1/f: new study, new 2 baths, new media room with wet bar, and remodel (e) bedroom. 2/f: remodel/relocate (e) bathroom and kitchen, new home office, and new bathroom at bedroom, infill (e) lightwell at north, new 1-level wood deck at rear yard. no change to front facade or garage door. | $125,000 |
| Nov 2, 2021 | In progress issued Jul 2025 | 815 Greenwich St | add new unit per ca state adu law. new unit included bedroom, bathroom, and kitchen at the first floor.Details
add new unit per ca state adu law. new unit included bedroom, bathroom, and kitchen at the first floor. | $40,000 |
| Jul 9, 2021 | Completed final sign-off Feb 2022 | 1370 11th Av | to remodel bathroom and kitchen in unit #4 and #6. replace drywall where needed. no layout changes, no wall stud framing demo.Details
to remodel bathroom and kitchen in unit #4 and #6. replace drywall where needed. no layout changes, no wall stud framing demo. | $40,000 |
| Nov 5, 2020 | Completed final sign-off Dec 2020 | 1645 Cabrillo St | at 2nd floor, unit 1645: remodel extg kitchen, laundry and bathroom, new full bathroom and water heater at 3r floor unit 1649, remodel extg kitchen, laundry and bathroom; new full bathroom and water heater.Details
at 2nd floor, unit 1645: remodel extg kitchen, laundry and bathroom, new full bathroom and water heater at 3r floor unit 1649, remodel extg kitchen, laundry and bathroom; new full bathroom and water heater. | $60,000 |
| Aug 11, 2020 | Completed final sign-off Aug 2022 | 565 Filbert St | remodel (e) floor space to (n) family, media, study bathroom & laundry; 2nd fl, unit 569 - remodel (e)kitchen & bathroom; 3rd & 4th fl - remodel (e) kitchen & bathroom, remodel bedroom to living room. enlarge garage door to 10'-0"; replace all windows. infill lightwell.Details
remodel (e) floor space to (n) family, media, study bathroom & laundry; 2nd fl, unit 569 - remodel (e)kitchen & bathroom; 3rd & 4th fl - remodel (e) kitchen & bathroom, remodel bedroom to living room. enlarge garage door to 10'-0"; replace all windows. infill lightwell. | $170,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2021 | 12 Baden St | remodel bathroom and kitchen in kind. replace 2 doors for bathroom. bathroom 60sq ft. kitchen 120sq ft.Details
remodel bathroom and kitchen in kind. replace 2 doors for bathroom. bathroom 60sq ft. kitchen 120sq ft. | $25,000 |
| Nov 12, 2019 | Completed final sign-off Nov 2020 | 7433 Geary Bl | remodel (e) 2nd floor units, including unit #1 & #2, work included kitchens, baths, and bedroom remodel, new light fixtures.Details
remodel (e) 2nd floor units, including unit #1 & #2, work included kitchens, baths, and bedroom remodel, new light fixtures. | $80,000 |
| Nov 7, 2019 | Completed final sign-off Dec 2020 | 2618 19th Av | relocate/remodel kitchen and bathroom and interior stairs. add a full bathroom, add a new deck with stairs on the 2/f. install 5 skylights & close off light well. add 2 bedrooms, 2 full bathrooms, and a media room on the 1st floor. relocate window. install tankless water heater.Details
relocate/remodel kitchen and bathroom and interior stairs. add a full bathroom, add a new deck with stairs on the 2/f. install 5 skylights & close off light well. add 2 bedrooms, 2 full bathrooms, and a media room on the 1st floor. relocate window. install tankless water heater. | $130,000 |
| Nov 7, 2019 | Expired or cancelled expired Mar 2023 | 1807 Broadway | revision to app#200811066036. rearraange interior layout. relocate kitchen and bathrooms.Details
revision to app#200811066036. rearraange interior layout. relocate kitchen and bathrooms. | |
| Sep 10, 2019 | Completed final sign-off Feb 2020 | 2230 Quintara St | upstairs rmeodel kitchen & bathroom. remodel in same location.Details
upstairs rmeodel kitchen & bathroom. remodel in same location. | $35,000 |
| Sep 4, 2019 | Expired or cancelled expired Jul 2021 | 1807 Broadway | unit 1: recommencement & completion of work approved under pa#200811066036 (voluntary to install new steels beams & posts in basement to support floor joists above. on 1/f-unit #1 - relocation of (e) kitchen to bedroom #3. add new bath #3 & laundry room & remodel (e) bed #1, #2 & bath #2Details
unit 1: recommencement & completion of work approved under pa#200811066036 (voluntary to install new steels beams & posts in basement to support floor joists above. on 1/f-unit #1 - relocation of (e) kitchen to bedroom #3. add new bath #3 & laundry room & remodel (e) bed #1, #2 & bath #2 | $10,000 |
| Aug 2, 2019 | Completed final sign-off Nov 2021 | 706 30th Av | remodel 85 sq ft kitchen and 40 sq ft bathroom at 2nd floorDetails
remodel 85 sq ft kitchen and 40 sq ft bathroom at 2nd floor | $7,000 |
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 72 Liebig St | revision to 2201905150697, 201902223605 at 2nd flr. remodel/relocate (e) kitchen, modify (e) kitchen space to bedrm, and 1 new bathroom.Details
revision to 2201905150697, 201902223605 at 2nd flr. remodel/relocate (e) kitchen, modify (e) kitchen space to bedrm, and 1 new bathroom. | $25,000 |
| Jun 5, 2019 | Completed final sign-off Dec 2021 | 54 Edgehill Wy | legalization of dwelling unit @ basement & 1st flr per ord# 43-14. convert (e) 1st floor space to dwelling unit. (n) unit within (e) bldg footprint. (n) unit included bedroom, bath and kitchent.Details
legalization of dwelling unit @ basement & 1st flr per ord# 43-14. convert (e) 1st floor space to dwelling unit. (n) unit within (e) bldg footprint. (n) unit included bedroom, bath and kitchent. | $18,700 |
| Feb 13, 2019 | Completed final sign-off Mar 2019 | 1519 Van Dyke Av | kitchen bathroom remodel, no change of layout.Details
kitchen bathroom remodel, no change of layout. | $20,000 |
| Feb 1, 2019 | Never finaled issued May 2021, no final | 1614 Mcallister St | 1st fl - add 3 full baths, convert storage space to 3 bedrooms, study and media room///nfpa 13 system required. add a kitchen,living, and dining. additional one unit to existing 1st floor storage.Details
1st fl - add 3 full baths, convert storage space to 3 bedrooms, study and media room///nfpa 13 system required. add a kitchen,living, and dining. additional one unit to existing 1st floor storage. | $150,000 |
| Dec 6, 2018 | Completed final sign-off Oct 2019 | 1859 Geneva Av | remodel (e) kitchen, replace counter, cabinets w/newDetails
remodel (e) kitchen, replace counter, cabinets w/new | $18,000 |
| Dec 3, 2018 | Completed final sign-off Mar 2019 | 951 Naples St | remodel kitchen in-kindDetails
remodel kitchen in-kind | $25,000 |
| Nov 28, 2018 | Never finaled issued Nov 2018, no final | 855 47th Av | kitchen and bathroom remodel. no walls moved, removed, added or infilled. all existing layout to remain unchangedDetails
kitchen and bathroom remodel. no walls moved, removed, added or infilled. all existing layout to remain unchanged | $13,000 |
| Oct 22, 2018 | Completed final sign-off Oct 2021 | 734 Green St | revision to app#201607202801. new propertyline opening at east wall. new 1 hour rated opening at exit passageway. new partition wall between kitchen and bedroom. n/a for maherDetails
revision to app#201607202801. new propertyline opening at east wall. new 1 hour rated opening at exit passageway. new partition wall between kitchen and bedroom. n/a for maher | $5,000 |
| Sep 19, 2018 | Completed final sign-off Jul 2019 | 124 Drake St | to comply with nov 201873133 & 201870291. - basement excavate for (n) liv space, (n) bedrm, stair, bath, media & lanudry. 1st flr - relocate kitchen, (n) bath, (n) mstr suite & remodel (e) baths. 1/2 bath in playrm 2nd flr - (n) bath, (n) 34" ht deck.Details
to comply with nov 201873133 & 201870291. - basement excavate for (n) liv space, (n) bedrm, stair, bath, media & lanudry. 1st flr - relocate kitchen, (n) bath, (n) mstr suite & remodel (e) baths. 1/2 bath in playrm 2nd flr - (n) bath, (n) 34" ht deck. | $99,000 |
| Jun 12, 2018 | Completed final sign-off Dec 2018 | 1583 28th Av | infill (e) lightwell. remodel (e) kitchen, bath add 1 new bathrm. construct 1 skylight & rebuilt interior staircase at 2nd flr. construct 1 bedrm, 2 full bathrm, media rm w/laundry area at grnd flrDetails
infill (e) lightwell. remodel (e) kitchen, bath add 1 new bathrm. construct 1 skylight & rebuilt interior staircase at 2nd flr. construct 1 bedrm, 2 full bathrm, media rm w/laundry area at grnd flr | $78,000 |
| Jun 7, 2018 | Expired or cancelled revoked Jul 2018 | 124 Drake St | construct 1 bedrm, 1 full bathrm, storage & media rm at ground floor; remodel (e) kitchen, 2 bathrm. construct 1 new bathrm, re-sheet rock w/insulation at 2nd floor; add 1 bathrm at 3rd floorDetails
construct 1 bedrm, 1 full bathrm, storage & media rm at ground floor; remodel (e) kitchen, 2 bathrm. construct 1 new bathrm, re-sheet rock w/insulation at 2nd floor; add 1 bathrm at 3rd floor | $67,000 |
| May 29, 2018 | Completed final sign-off Oct 2019 | 167 Vienna St | remodel 2 bathrooms and one kitchen in-kind & same location. upgrade panel board in same location.Details
remodel 2 bathrooms and one kitchen in-kind & same location. upgrade panel board in same location. | $20,000 |
| May 29, 2018 | Expired or cancelled revoked Jul 2018 | 124 Drake St | remove sheetrock in kitchen & dining room and replace with new ones, using 5/8in type x gyp.Details
remove sheetrock in kitchen & dining room and replace with new ones, using 5/8in type x gyp. | $5,000 |
| May 14, 2018 | Completed final sign-off Jan 2020 | 2940 22nd Av | remodel one kitchen in-kind & same location.Details
remodel one kitchen in-kind & same location. | $22,000 |
| Apr 25, 2018 | Never finaled issued Apr 2018, no final | 58 Lafayette St | 1)comply to complaints: #201846422,201847031, & 201847021. 2)remodel extg unit at 58 lafayette street to include new electrical wiring, lighting, remodel extg bathroom and kitchen, relocate water heater and replace extg furnace at basement.Details
1)comply to complaints: #201846422,201847031, & 201847021. 2)remodel extg unit at 58 lafayette street to include new electrical wiring, lighting, remodel extg bathroom and kitchen, relocate water heater and replace extg furnace at basement. | $68,500 |
| Apr 4, 2018 | Expired or cancelled expired Aug 2020 | 229 02nd Av | unit#2 to comply complaint#201853306. like for like. remodel w/ replace kitchen cabinets & fixts & replace fixts @ bathrm, kitchen area approx. about 6x8 area & bathroom about 5x6. lighting per cec 150.0 (k).Details
unit#2 to comply complaint#201853306. like for like. remodel w/ replace kitchen cabinets & fixts & replace fixts @ bathrm, kitchen area approx. about 6x8 area & bathroom about 5x6. lighting per cec 150.0 (k). | $11,000 |
| Feb 7, 2018 | Expired or cancelled expired Jul 2021 | 1807 Broadway | #3. remodel kitchen. no rough framing or change in (e) layout.Details
#3. remodel kitchen. no rough framing or change in (e) layout. | $7,000 |
| Feb 7, 2018 | Completed final sign-off May 2018 | 2015 Revere Av | remodel kitchen & bathroom at 2/f, new plumbing, new electrical.Details
remodel kitchen & bathroom at 2/f, new plumbing, new electrical. | $18,000 |
| Dec 4, 2017 | Completed final sign-off Aug 2018 | 2831 Cabrillo St | unit #2831: remodel (2) bathrooms and (1) kitchen. repair sheetrock in bedroom, window glazing replacement, not visible from streetDetails
unit #2831: remodel (2) bathrooms and (1) kitchen. repair sheetrock in bedroom, window glazing replacement, not visible from street | $40,000 |
| Oct 20, 2017 | Completed final sign-off Jun 2018 | 127 Baden St | construct 2 bedrooms, 2 full bathroom & laundry room at g/f, relocate (e) kitchen, convert (e) kitchen space to home office, construct 2 full bathrooms, 1 toilet room & upgrade partial ceiling framing. construct 2 skylight at 2/f. in-fill (e) central patio at 2/f.Details
construct 2 bedrooms, 2 full bathroom & laundry room at g/f, relocate (e) kitchen, convert (e) kitchen space to home office, construct 2 full bathrooms, 1 toilet room & upgrade partial ceiling framing. construct 2 skylight at 2/f. in-fill (e) central patio at 2/f. | $130,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 821 Greenwich St | remodel kitchen tiles onlyDetails
remodel kitchen tiles only | $2,000 |
| Sep 14, 2017 | Completed final sign-off Dec 2017 | 5 Sunview Dr | to comply with #201702631 ,remodel 1 bathroom and kitchen in 2nd floor level. replace 2 windows in rear bldg with u = 0.32. install 5/8" type "x" sheetrock in garage and upgrade main electrical panel and replace gas furnace., contact district inspector for start of workDetails
to comply with #201702631 ,remodel 1 bathroom and kitchen in 2nd floor level. replace 2 windows in rear bldg with u = 0.32. install 5/8" type "x" sheetrock in garage and upgrade main electrical panel and replace gas furnace., contact district inspector for start of work | $25,000 |
| Aug 25, 2017 | Expired or cancelled suspend Aug 2018 | 133 Lunado Wy | remodel kitchen & add a half bathroom on 2nd floor. removal of one side window & one side door. (n) stucco to match (e). one (n) wood sliding window. no other exterior changes.Details
remodel kitchen & add a half bathroom on 2nd floor. removal of one side window & one side door. (n) stucco to match (e). one (n) wood sliding window. no other exterior changes. | $25,000 |
| Jul 27, 2017 | Expired or cancelled expired Dec 2019 | 1046 Treat Av | to comply with violation #201788171. remodel/convert (e) ground fl (1) kitchen, (1) bathroom and (1) bedroom into (1) bedroom, (1) kitchen, (2) bathrms, & (1) laundry room. refinish the interior of the entire ground unit.Details
to comply with violation #201788171. remodel/convert (e) ground fl (1) kitchen, (1) bathroom and (1) bedroom into (1) bedroom, (1) kitchen, (2) bathrms, & (1) laundry room. refinish the interior of the entire ground unit. | $15,000 |
| Jul 11, 2017 | Completed final sign-off Jan 2018 | 292 21st Av | to expand the scope of work: add 2 bathrooms and relocate kitchen. revision to app#201604043902Details
to expand the scope of work: add 2 bathrooms and relocate kitchen. revision to app#201604043902 | $30,000 |
| Jul 6, 2017 | Expired or cancelled withdrawn Jul 2017 | 1046 Treat Av | comply with nov 201788171 - remodel/convert (e) ground fl kitchen, bathrm and bedrm into new 1 bedrm, 1 kitchen 2 bathrms and 1 laundry rm. add 18 feet long, full width at ground fl as 1 bedrm. connect rooftop level of addition as new deck to (e) deck. remove (e) exterior stairs in rear yard, buildDetails
comply with nov 201788171 - remodel/convert (e) ground fl kitchen, bathrm and bedrm into new 1 bedrm, 1 kitchen 2 bathrms and 1 laundry rm. add 18 feet long, full width at ground fl as 1 bedrm. connect rooftop level of addition as new deck to (e) deck. remove (e) exterior stairs in rear yard, build | $15,000 |
| May 18, 2017 | Completed final sign-off Mar 2019 | 258 Valley St | re-doing floor, replace kitchen cabinets & painting. no moving of walls, doors or windows.Details
re-doing floor, replace kitchen cabinets & painting. no moving of walls, doors or windows. | $8,000 |
| Apr 18, 2017 | Completed final sign-off Oct 2017 | 531 Girard St | infill (e) lightwell. add 2 (n) skylights to ceiling and remodel kitchen on 2/f. convert (e) shower to closet and remodel (e) bathroom on 2/f.Details
infill (e) lightwell. add 2 (n) skylights to ceiling and remodel kitchen on 2/f. convert (e) shower to closet and remodel (e) bathroom on 2/f. | $16,000 |
| Mar 29, 2017 | Completed final sign-off Nov 2017 | 51 Fairfield Wy | interior remodel per plan: remodel extg kitchen, bathroom on 2nd floor. add new bathroom on 2nd floor, remove and relocate extg stairs to 1st floor. remodel extg 1st floor bathroom and family room to convert to 2 bedrooms. relocate extg 1st floor bathroom, add new family room on 1st floor withDetails
interior remodel per plan: remodel extg kitchen, bathroom on 2nd floor. add new bathroom on 2nd floor, remove and relocate extg stairs to 1st floor. remodel extg 1st floor bathroom and family room to convert to 2 bedrooms. relocate extg 1st floor bathroom, add new family room on 1st floor with | $108,000 |
| Mar 28, 2017 | Completed final sign-off Aug 2018 | 54 Sea View Tr | internal remodeling of kitchen, living room, and dining room . add 2 bathroom and family room in basement.foundation and walls structural strengthening per plan.Details
internal remodeling of kitchen, living room, and dining room . add 2 bathroom and family room in basement.foundation and walls structural strengthening per plan. | $180,000 |
| Feb 27, 2017 | Expired or cancelled expired Dec 2019 | 1046 Treat Av | remodeling 2 bathrooms and kitchen on 2/f. no change on walls.Details
remodeling 2 bathrooms and kitchen on 2/f. no change on walls. | $45,000 |
| Dec 6, 2016 | Completed final sign-off Jan 2018 | 45 Teresita Bl | relocated kitchen to (e) dining room add 1 bath and closet space in (e) kitchen. convert (e) breakfast and enclosed central patio to dining room. no work at 1st flrDetails
relocated kitchen to (e) dining room add 1 bath and closet space in (e) kitchen. convert (e) breakfast and enclosed central patio to dining room. no work at 1st flr | $10,000 |
| Nov 15, 2016 | Completed final sign-off Nov 2018 | 737 20th Av | 2nd floor, unit 737 20th ave: remodel (e) kitchen, bathroom, toilet and add new master bath. new lighting and outlets. 1st fl remove post and beam and intall new beam at garage. relocate furnance and install new wall mounted water heaterDetails
2nd floor, unit 737 20th ave: remodel (e) kitchen, bathroom, toilet and add new master bath. new lighting and outlets. 1st fl remove post and beam and intall new beam at garage. relocate furnance and install new wall mounted water heater | $50,000 |
| Oct 3, 2016 | Completed final sign-off Feb 2017 | 1535 15th St | remodel kitchen and bath, replace 7 windows. replace drywall, replace water heater, new window, not visible from streetDetails
remodel kitchen and bath, replace 7 windows. replace drywall, replace water heater, new window, not visible from street | $22,000 |
| Aug 4, 2016 | Completed final sign-off May 2017 | 586 41st Av | replace existing kitchen cabinets at kitchen.Details
replace existing kitchen cabinets at kitchen. | $2,000 |
| Jul 29, 2016 | Completed final sign-off Feb 2017 | 2614 19th Av | 1. remodel (e) kitchen, bathroom. convert (e) kitchen into studey room & enclosure (e) patio at second floor. 2. construct two bedroom. two full bathroom. hall & laundry area at ground floor. 3. re-built (e) deck with staircase at rear 9approx. 16'-3" x 8'-0").Details
1. remodel (e) kitchen, bathroom. convert (e) kitchen into studey room & enclosure (e) patio at second floor. 2. construct two bedroom. two full bathroom. hall & laundry area at ground floor. 3. re-built (e) deck with staircase at rear 9approx. 16'-3" x 8'-0"). | $68,000 |
| Jul 15, 2016 | In progress issued Aug 2024 | 815 Greenwich St | legaliztion of dwelling unit #815(adu) at 1st floor per ordinance 43-14 planning code section 207.3. new unit included bedrooms, bathroom and kitchen.Details
legaliztion of dwelling unit #815(adu) at 1st floor per ordinance 43-14 planning code section 207.3. new unit included bedrooms, bathroom and kitchen. | $48,000 |
| Jul 12, 2016 | Never finaled issued Oct 2018, no final | 1614 Mcallister St | reconfigure interior layout for all 3 units. add one bedroom, one study, 3 bathrooms & 1 entertainment on 2nd. relocate kitchen on 2nd flr. add 2 bedrooms, office, 3 baths and entertainment rm & relocate kitchen on 3rd. add 2 bathrooms, study, office, gameroom, media rm, & relocate kitchenDetails
reconfigure interior layout for all 3 units. add one bedroom, one study, 3 bathrooms & 1 entertainment on 2nd. relocate kitchen on 2nd flr. add 2 bedrooms, office, 3 baths and entertainment rm & relocate kitchen on 3rd. add 2 bathrooms, study, office, gameroom, media rm, & relocate kitchen | $80,000 |
| Jun 17, 2016 | Expired or cancelled expired Mar 2018 | 198 15th Av | electrical panel upgrade, plumbing upgrades at two bathrooms and one kitchen.Details
electrical panel upgrade, plumbing upgrades at two bathrooms and one kitchen. | $18,000 |
| Apr 19, 2016 | Expired or cancelled expired Jan 2019 | 356 Willard North St | remodel (4) bathrooms, 1/2 bathroom and (1) kitchen. no walls to be removed or alteredDetails
remodel (4) bathrooms, 1/2 bathroom and (1) kitchen. no walls to be removed or altered | $23,000 |
| Aug 21, 2014 | Completed final sign-off Nov 2014 | 506 08th Av | unit 2: remodel (e) kitchen & bathroom located at 2/f with new plumbing & electrical work, no structural work.Details
unit 2: remodel (e) kitchen & bathroom located at 2/f with new plumbing & electrical work, no structural work. | $10,000 |
| Mar 31, 2014 | Completed final sign-off Jun 2015 | 140 Hernandez Av | at (e) 2nd floor - remodel (e) kitchen, bathroom, construct & relocate a bathroom, new light fixtures & outlets, new skylights.Details
at (e) 2nd floor - remodel (e) kitchen, bathroom, construct & relocate a bathroom, new light fixtures & outlets, new skylights. | $31,000 |
| Mar 12, 2014 | Expired or cancelled withdrawn May 2014 | 140 Hernandez Av | provide non-structural demolition to (e) floor to prepare for new work including demolish (e) kitchen counter, appliances, fixtures, bathroom fixtures, finishes, doors water heater e furnace and ductworks.Details
provide non-structural demolition to (e) floor to prepare for new work including demolish (e) kitchen counter, appliances, fixtures, bathroom fixtures, finishes, doors water heater e furnace and ductworks. | $5,000 |
| Mar 3, 2014 | Completed final sign-off Nov 2014 | 2398 30th Av | 2nd floor- relocate & remove (e) kitchen, remodle (e) bathroom, new toilet. 1st floor: remodle (e) bathroom, new laundry & storage. new furnace & water heater @ garage. new wall finish, new light fixture & outlets work per plansDetails
2nd floor- relocate & remove (e) kitchen, remodle (e) bathroom, new toilet. 1st floor: remodle (e) bathroom, new laundry & storage. new furnace & water heater @ garage. new wall finish, new light fixture & outlets work per plans | $47,000 |
| Jan 14, 2014 | Completed final sign-off Sep 2014 | 883 35th Av | at 2nd floor remodel extg kitchen, remove walls and replace with new beams. at 3rd floor new master bathroom and remodel extg bath new light fixture and outlets. all work per plan, add new laundry.Details
at 2nd floor remodel extg kitchen, remove walls and replace with new beams. at 3rd floor new master bathroom and remodel extg bath new light fixture and outlets. all work per plan, add new laundry. | $40,000 |
| Jul 12, 2010 | Completed final sign-off Aug 2010 | 1211 Revere Av | remodel kitchen & bathroom-replace cabinetry, sink, faucet & tile work. no moving or adding walls. replace 4 existing light fixtures in kitchen. new lighting comply cec 150 cksDetails
remodel kitchen & bathroom-replace cabinetry, sink, faucet & tile work. no moving or adding walls. replace 4 existing light fixtures in kitchen. new lighting comply cec 150 cks | $8,500 |
| Feb 11, 2010 | Expired or cancelled expired Apr 2013 | 96 Toledo Wy | unit 205. replace kitchen cabinets & floor tile. # 306 replace kitchen cabinets, floor tile, bathroom tile , painting, replace3 windows in kind. not visible from street. no structural work.Details
unit 205. replace kitchen cabinets & floor tile. # 306 replace kitchen cabinets, floor tile, bathroom tile , painting, replace3 windows in kind. not visible from street. no structural work. | $10,000 |
| Jan 7, 2010 | Completed final sign-off Sep 2010 | 766 Clayton St | revision to pa# 2009.10.21.9411. 1st fl: replace wall/ceiling,bath fixtures and relocate kitchen; basement: remove columns for additinal prkg spaces, replace foundation, add new master bedroom and bath room. all work shown on delta 1, dated 12.07.09Details
revision to pa# 2009.10.21.9411. 1st fl: replace wall/ceiling,bath fixtures and relocate kitchen; basement: remove columns for additinal prkg spaces, replace foundation, add new master bedroom and bath room. all work shown on delta 1, dated 12.07.09 | $120,000 |
| Dec 31, 2009 | Expired or cancelled expired Jan 2011 | 1700 Broadway | unit #606-remove (e) kitchen cabinets & replace new at same location. no other work, also counter top & sink, no lightingDetails
unit #606-remove (e) kitchen cabinets & replace new at same location. no other work, also counter top & sink, no lighting | $4,500 |
| Dec 31, 2009 | Expired or cancelled expired Jan 2011 | 1700 Broadway | unit #405-remove kitchen cabentry and replace new @ same location. no other work, also countertop & sink-no lighting.Details
unit #405-remove kitchen cabentry and replace new @ same location. no other work, also countertop & sink-no lighting. | $4,500 |
| Oct 5, 2009 | Completed final sign-off Sep 2010 | 764 Clayton St | interior alteration: repalce wall/ceiling finishes, bath fixtures, kitchen remodel, insulation upgrade, floor finishes, voluntary structural strengthening at 3rd floor.Details
interior alteration: repalce wall/ceiling finishes, bath fixtures, kitchen remodel, insulation upgrade, floor finishes, voluntary structural strengthening at 3rd floor. | $20,000 |