Block 7159, lot 038
72 Liebig St
- City’s use
- Single Family Residential
- Built
- 1952
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 1,593 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 72 Liebig St | Bay C T Construction Inc. | revision to 2201905150697, 201902223605 at 2nd flr. remodel/relocate (e) kitchen, modify (e) kitchen space to bedrm, and 1 new bathroom.Details
revision to 2201905150697, 201902223605 at 2nd flr. remodel/relocate (e) kitchen, modify (e) kitchen space to bedrm, and 1 new bathroom. | $25,000 |
| May 31, 2019 | Completed final sign-off Sep 2019 | 72 Liebig St | replace approx 100 sq ft of plywood, felt paper & replace roofing. all work in-kind.Details
replace approx 100 sq ft of plywood, felt paper & replace roofing. all work in-kind. | $2,000 | |
| May 17, 2019 | Completed final sign-off Sep 2019 | 72 Liebig St | revision to pa 201905150697 additional to scope new hardwood flooring. revise estimate cost to 290k.Details
revision to pa 201905150697 additional to scope new hardwood flooring. revise estimate cost to 290k. | $290,000 | |
| May 15, 2019 | Completed final sign-off Sep 2019 | 72 Liebig St | remodel 1 kitchen and 4 bathroom(s), new 5/8" type x sheetrock throughout. new kitchen cabinets, sinks, vanity toilets. no walls demolition.Details
remodel 1 kitchen and 4 bathroom(s), new 5/8" type x sheetrock throughout. new kitchen cabinets, sinks, vanity toilets. no walls demolition. | $80,000 | |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 72 Liebig St | street spaceDetails
street space | ||
| Mar 19, 2019 | Completed final sign-off Sep 2019 | 72 Liebig St | revision to app#201902223605. drywall removal through entire dwelling. both floors, drywall is acm-asbestos>1% by certified asbestos contractorDetails
revision to app#201902223605. drywall removal through entire dwelling. both floors, drywall is acm-asbestos>1% by certified asbestos contractor | $26,694 | |
| Feb 22, 2019 | Completed final sign-off Sep 2019 | 72 Liebig St | to demo fire damage area, remove fire damage debris. no change in wall layouts, no structural work under this permit. demo only.Details
to demo fire damage area, remove fire damage debris. no change in wall layouts, no structural work under this permit. demo only. | $1,000 | |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 72 Liebig St | Amherst Associates Const | re-roofingDetails
re-roofing | $5,000 |
| Feb 14, 2012 | Completed final sign-off Apr 2012 | 72 Liebig St | Bay C T Construction Inc. | remodel garage area. convert garage to two bedrooms w/two bath, two additional storage room. and a smaller garage per plan.Details
remodel garage area. convert garage to two bedrooms w/two bath, two additional storage room. and a smaller garage per plan. | $23,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay C T Construction Inc. (2), Amherst Associates Const
- Architects
- Bill Xie Guan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.