Bay Area Design & Construction
- Based in
- Los Gatos
- On San Francisco permits
- Apr 2010 to Nov 2015
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 138 days from filing to permit and 538 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2014 | Completed final sign-off Aug 2016 | 3211 Baker St | as per plans &spec rev dated 10/7/14: site permit-hori ext w/ roof deck & infill at 2/f--maher- compliance with ordinance no. 155-13 not required.Details
as per plans &spec rev dated 10/7/14: site permit-hori ext w/ roof deck & infill at 2/f--maher- compliance with ordinance no. 155-13 not required. | $250,000 |
| Nov 8, 2011 | Completed final sign-off Apr 2013 | 1089 Chestnut St | add a powder room to ktichen including a toilet & pedestal sink & light, outlet & vent on 2nd floor. extend roof deck forward, replace iron railing with glass railing.Details
add a powder room to ktichen including a toilet & pedestal sink & light, outlet & vent on 2nd floor. extend roof deck forward, replace iron railing with glass railing. | $50,000 |