Back to kitchen remodel contractors
Bay Area Design & Construction
- Based in
- Los Gatos
- On San Francisco permits
- Apr 2010 to Nov 2015
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 1 days from filing to permit and 460 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 183 Saint Germain Av | interior remodel of existing single family residence: remodeling existing kitchen, powder room & bar. remodeling (e) master bath, addition of 2 skylights.Details
interior remodel of existing single family residence: remodeling existing kitchen, powder room & bar. remodeling (e) master bath, addition of 2 skylights. | $97,000 |
| Jan 26, 2012 | Completed final sign-off Apr 2014 | 29 Chenery St | front bldg - relocate upstairs bathrooms and master bedroom. kitchen remodel, window site changes, 3 new window openings, infill lightwell. skylights in bathrooms.Details
front bldg - relocate upstairs bathrooms and master bedroom. kitchen remodel, window site changes, 3 new window openings, infill lightwell. skylights in bathrooms. | $110,000 |
| Jan 23, 2012 | Completed final sign-off May 2012 | 1439 Page St | remodeling kitchen including installing cabinet and counter top. outlets and flooring. remodeling master bathroom. remodeling toilet room and adding a small sink.Details
remodeling kitchen including installing cabinet and counter top. outlets and flooring. remodeling master bathroom. remodeling toilet room and adding a small sink. | $35,000 |