Barron Construction Inc.
- Based in
- So. San Francisco
- On San Francisco permits
- Sep 2012 to Nov 2025
- Last 24 months
- 3 permits filed
45 permits since 2000: 34 completed, 7 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 7 completed, 1 in progress, 1 never finaled. Typically 20 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2025 | In progress issued Nov 2025 | 600 Ortega St | revision to pa# 202304276609, ref planning 2024-007542prj, add an elevator penthouse, service roof deck, and exterior spiral staircase. the elevator penthouse will be approximately 12 feet in height.Details
revision to pa# 202304276609, ref planning 2024-007542prj, add an elevator penthouse, service roof deck, and exterior spiral staircase. the elevator penthouse will be approximately 12 feet in height. | $1,000 |
| Sep 23, 2024 | Completed final sign-off Nov 2024 | 173 Jordan Av | revision to 202307212734. due to change in field construction of the entry stair for this project was changed from concrete to wood frames. spec insp 4, 24 a, 18a to be removed. no longer applicableDetails
revision to 202307212734. due to change in field construction of the entry stair for this project was changed from concrete to wood frames. spec insp 4, 24 a, 18a to be removed. no longer applicable | |
| Jul 21, 2023 | Completed final sign-off Nov 2024 | 173 Jordan Av | minor changes to exterior front entry stairDetails
minor changes to exterior front entry stair | $500 |
| May 31, 2022 | Completed final sign-off Dec 2024 | 173 Jordan Av | excavate at 1st flr & increase clg ht. convert storage to habitable. remodel (e) sfh replace foundations new stair throughout. no work to be done on front besides replace glazing of front windows. keep (e) window frame and trim. add/replace of rear & side window & doors. new mech system to be designDetails
excavate at 1st flr & increase clg ht. convert storage to habitable. remodel (e) sfh replace foundations new stair throughout. no work to be done on front besides replace glazing of front windows. keep (e) window frame and trim. add/replace of rear & side window & doors. new mech system to be design | $750,000 |
| May 10, 2018 | Completed final sign-off Mar 2019 | 1354 28th Av | infill partial interior lgtwell @ 2nd fl for new stair to 1st fl. add open stair partial new roof, not visible by neighbor. develop rooms down: family rm, 1 bedrm, remodel a full bath, add a 1/2 bath. laundry in garage repair floor in (e) storage rm. replace windows not visible from st. add patioDetails
infill partial interior lgtwell @ 2nd fl for new stair to 1st fl. add open stair partial new roof, not visible by neighbor. develop rooms down: family rm, 1 bedrm, remodel a full bath, add a 1/2 bath. laundry in garage repair floor in (e) storage rm. replace windows not visible from st. add patio | $65,340 |
| Nov 29, 2017 | Completed final sign-off May 2018 | 787 43rd Av | remodel (e) kitchen & bathroom, open up walls in dining room. remove (e) exterior stairs in lightwell. infill (e) door connected to lightwell access.Details
remodel (e) kitchen & bathroom, open up walls in dining room. remove (e) exterior stairs in lightwell. infill (e) door connected to lightwell access. | $20,000 |
| Mar 30, 2016 | Never finaled issued Mar 2016, no final | 17 Stoneman St | repair handrail on exterior stairs at rear of property.Details
repair handrail on exterior stairs at rear of property. | $1,000 |
| Mar 3, 2016 | Completed final sign-off Aug 2016 | 26 Fernwood Dr | revision pa 2015-1022-0462, replace (e) footing per plan to suit site conditions. framing changes at stairs and powder room to increase ceiling height. voluntary provide shearwall at rear of garage. replace slab on grade at family room.Details
revision pa 2015-1022-0462, replace (e) footing per plan to suit site conditions. framing changes at stairs and powder room to increase ceiling height. voluntary provide shearwall at rear of garage. replace slab on grade at family room. | $25,000 |
| Sep 5, 2012 | Completed final sign-off Sep 2012 | 358 Diamond St | to comply with physical inspection report #cc-7094: provide hand rail at rear stairs. repair/replace damage exterior wood landing at front stairs.Details
to comply with physical inspection report #cc-7094: provide hand rail at rear stairs. repair/replace damage exterior wood landing at front stairs. | $1,200 |