Back to bathroom remodel contractors
Barron Construction Inc.
- Based in
- So. San Francisco
- On San Francisco permits
- Sep 2012 to Nov 2025
- Last 24 months
- 3 permits filed
45 permits since 2000: 34 completed, 7 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 19 completed. Typically 13 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2025 | Completed final sign-off May 2026 | 3119 Harrison St | demo existing kitchen. renovation of new kitchen and addition of 1/2 bathroom. no work done to exterior. no additional sq ftg. no work done at separate condominium at 3121 harrison.Details
demo existing kitchen. renovation of new kitchen and addition of 1/2 bathroom. no work done to exterior. no additional sq ftg. no work done at separate condominium at 3121 harrison. | $75,000 |
| Jan 10, 2022 | Completed final sign-off Dec 2022 | 3633 Mission St | all work on lower level of house: coversion to accommmodate a new bedroom, full bath & wet bar. relocate (e) laundry.Details
all work on lower level of house: coversion to accommmodate a new bedroom, full bath & wet bar. relocate (e) laundry. | $65,000 |
| Aug 10, 2021 | Completed final sign-off Apr 2025 | 272 Eureka St | addition at 1st & 2nd flrs. extend by appx 9'-7 1/2". adding 224 sq ft to each level. relocate pwdr rm, replace (e) wood deck, (n) sliding door & window at rear, add (n) bath rm-laundry-office & skylight. renovate kitchen.Details
addition at 1st & 2nd flrs. extend by appx 9'-7 1/2". adding 224 sq ft to each level. relocate pwdr rm, replace (e) wood deck, (n) sliding door & window at rear, add (n) bath rm-laundry-office & skylight. renovate kitchen. | $158,000 |
| Sep 24, 2019 | Completed final sign-off Jan 2026 | 521 Capp St | excavate existing garage, demolish existing enclosed porch & deck. a 2 story addition and remodel that includes a guest bedroom, bathroom and kitchen.Details
excavate existing garage, demolish existing enclosed porch & deck. a 2 story addition and remodel that includes a guest bedroom, bathroom and kitchen. | $240,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2021 | 1230 05th Av | int reno - kitchen and bathrooms. additin of 2 bathrooms and 1 powder room. repair/replace front ext windows and siding. addition/replacement of rear windows & doorsDetails
int reno - kitchen and bathrooms. additin of 2 bathrooms and 1 powder room. repair/replace front ext windows and siding. addition/replacement of rear windows & doors | $550,000 |
| May 30, 2019 | Completed final sign-off Jun 2020 | 1466 12th Av | kitchen and bath remodelDetails
kitchen and bath remodel | $60,000 |
| Jan 8, 2019 | Completed final sign-off Apr 2019 | 647 Hyde St | remodel kitchen, master bath, guest bath, two powder rooms in kind. no alteration to wall, windows or doors.Details
remodel kitchen, master bath, guest bath, two powder rooms in kind. no alteration to wall, windows or doors. | $60,000 |
| May 10, 2018 | Completed final sign-off Mar 2019 | 1354 28th Av | infill partial interior lgtwell @ 2nd fl for new stair to 1st fl. add open stair partial new roof, not visible by neighbor. develop rooms down: family rm, 1 bedrm, remodel a full bath, add a 1/2 bath. laundry in garage repair floor in (e) storage rm. replace windows not visible from st. add patioDetails
infill partial interior lgtwell @ 2nd fl for new stair to 1st fl. add open stair partial new roof, not visible by neighbor. develop rooms down: family rm, 1 bedrm, remodel a full bath, add a 1/2 bath. laundry in garage repair floor in (e) storage rm. replace windows not visible from st. add patio | $65,340 |
| Mar 15, 2018 | Completed final sign-off May 2019 | 142 Newton St | remodel extg lower level to accomodate 2 bedrooms, laundry room, and 1 full bath.Details
remodel extg lower level to accomodate 2 bedrooms, laundry room, and 1 full bath. | $55,000 |
| Mar 5, 2018 | Completed final sign-off Oct 2018 | 80 Lagunitas Dr | revision to 201612134809: remove section of bearing wall btwn kitchen & dining rm. replace 2 rear windows with 2 pairs of patio doors. remodel kitchen & bath 2Details
revision to 201612134809: remove section of bearing wall btwn kitchen & dining rm. replace 2 rear windows with 2 pairs of patio doors. remodel kitchen & bath 2 | $40,000 |
| Dec 7, 2017 | Completed final sign-off Feb 2018 | 3085 20th Av | remodel 9' x 8' bathroom. replace like with like.Details
remodel 9' x 8' bathroom. replace like with like. | $20,000 |
| Nov 29, 2017 | Completed final sign-off May 2018 | 787 43rd Av | remodel (e) kitchen & bathroom, open up walls in dining room. remove (e) exterior stairs in lightwell. infill (e) door connected to lightwell access.Details
remodel (e) kitchen & bathroom, open up walls in dining room. remove (e) exterior stairs in lightwell. infill (e) door connected to lightwell access. | $20,000 |
| Apr 11, 2016 | Completed final sign-off Jun 2016 | 1032 Castro St | remodel 6x8 bathroom tub/sink toiletDetails
remodel 6x8 bathroom tub/sink toilet | $10,000 |
| Feb 26, 2016 | Completed final sign-off Jan 2017 | 1032 Castro St | kitchen remodel, infill (e) lightwell, remove fireplace (n) skylight in (e) bathroom and kitchen.Details
kitchen remodel, infill (e) lightwell, remove fireplace (n) skylight in (e) bathroom and kitchen. | $60,000 |
| Jan 27, 2016 | Completed final sign-off Apr 2016 | 1403 11th Av | upgrade kitchen, bathroom and powder room.Details
upgrade kitchen, bathroom and powder room. | $45,000 |
| Oct 22, 2015 | Completed final sign-off Aug 2016 | 26 Fernwood Dr | new deck on lower level, bedroom, bath, powder & family room on lower level & small deck at dining room on upper level.Details
new deck on lower level, bedroom, bath, powder & family room on lower level & small deck at dining room on upper level. | $80,000 |
| Dec 5, 2014 | Completed final sign-off Mar 2017 | 1339 28th Av | addition to rear of (e) house & remodel of (e) house. kitchen & add 3-bathrooms.Details
addition to rear of (e) house & remodel of (e) house. kitchen & add 3-bathrooms. | $200,000 |
| May 14, 2014 | Completed final sign-off Jul 2014 | 1780 Mcallister St | unit#3 remodel kitchen & bathroom.Details
unit#3 remodel kitchen & bathroom. | $15,000 |
| May 10, 2013 | Completed final sign-off Jul 2013 | 360 Diamond St | partial bathroom remodel-upgrade tile, vanity & tub. toilet to remainDetails
partial bathroom remodel-upgrade tile, vanity & tub. toilet to remain | $10,000 |