Back to bathroom remodel contractors
Barker-O'donoghue Master Bldrs
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Jul 2025
- Last 24 months
- 5 permits filed
109 permits since 2000: 81 completed, 3 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 19 completed, 1 in progress, 3 never finaled, 4 expired or cancelled. Typically 133 days from filing to permit and 448 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2024 | In progress issued Sep 2025 | 525 23rd Av | modifications to front facade including: new bay window. enclose entry stair, new front door and garage door, new windows and siding materials. remodel of primary bed and bath. (n) direct vent gas fireplace in living room.Details
modifications to front facade including: new bay window. enclose entry stair, new front door and garage door, new windows and siding materials. remodel of primary bed and bath. (n) direct vent gas fireplace in living room. | $300,000 |
| Nov 19, 2024 | Completed final sign-off Apr 2026 | 900 Chenery St | revision to pa#202101072240. minor re-orginazation to basement media room and media bathroom, minor re-organization of 1st floor kitchen, replacement of 2 metal gates with glass doors, elimination of 2 metal awnings, reduction in cabinetry, simplification of rear yard.Details
revision to pa#202101072240. minor re-orginazation to basement media room and media bathroom, minor re-organization of 1st floor kitchen, replacement of 2 metal gates with glass doors, elimination of 2 metal awnings, reduction in cabinetry, simplification of rear yard. | |
| Mar 7, 2024 | Completed final sign-off Jan 2026 | 3969 Cesar Chavez St | kitchen and bathroom remodel for duplex on 2nd and 3rd floor to include removing wall at bathroom and kitchen. replace (12) windows in kind throughout house (none at front facade). remove exterior attached shed at rear of property seperate mep permits will need to be obtained.Details
kitchen and bathroom remodel for duplex on 2nd and 3rd floor to include removing wall at bathroom and kitchen. replace (12) windows in kind throughout house (none at front facade). remove exterior attached shed at rear of property seperate mep permits will need to be obtained. | $402,250 |
| Nov 2, 2023 | Completed final sign-off Aug 2024 | 77 Jordan Av | 1st flr: add (n) batroom 4, replace damaged garage pour header. 3rd flr: enlarge+ remodel master bathroom and add shower, remodel star hall, add(n) laundry room, remodel bedroom 2 + bedroom 2 closet, enlarge and remodel bathroom 2, replace bedroom 3 w/small office and bathroom and batroom 3; (e)Details
1st flr: add (n) batroom 4, replace damaged garage pour header. 3rd flr: enlarge+ remodel master bathroom and add shower, remodel star hall, add(n) laundry room, remodel bedroom 2 + bedroom 2 closet, enlarge and remodel bathroom 2, replace bedroom 3 w/small office and bathroom and batroom 3; (e) | $350,000 |
| Mar 28, 2023 | Completed final sign-off Mar 2024 | 386 Hill St | replace kitchen w/new kitchen in e location, remodel laundry rm, replace side window w/new fixed window, not visible from street, remodel 3rd flr to include 3 bedrooms & 2 bathrooms. new lighting & electrical, new plumbing, fixtures & appliances.Details
replace kitchen w/new kitchen in e location, remodel laundry rm, replace side window w/new fixed window, not visible from street, remodel 3rd flr to include 3 bedrooms & 2 bathrooms. new lighting & electrical, new plumbing, fixtures & appliances. | $136,110 |
| Mar 9, 2022 | Completed final sign-off Feb 2024 | 849 Sanchez St | add (n) roof deck, cable guard rail, roof access hatch, & interior stair. replace roofing. remodel (e) kitchen & bathrooms. remove & replace 2nd fl terrace flooring in-kind. new lighting in areas of new work. new whole house fan & ducted ac.Details
add (n) roof deck, cable guard rail, roof access hatch, & interior stair. replace roofing. remodel (e) kitchen & bathrooms. remove & replace 2nd fl terrace flooring in-kind. new lighting in areas of new work. new whole house fan & ducted ac. | $138,552 |
| Jan 7, 2021 | Completed final sign-off Apr 2026 | 900 Chenery St | horizontal addition at 1st & 2nd floor of (e) 2 story house over basement. remodel basement and add guest suite. remodel existing house and add bathroom & master suite with balcony.Details
horizontal addition at 1st & 2nd floor of (e) 2 story house over basement. remodel basement and add guest suite. remodel existing house and add bathroom & master suite with balcony. | $750,000 |
| Jun 25, 2019 | Completed final sign-off Oct 2019 | 476 Duncan St | remodel of 2 (e) bathrooms, inkind, like for like replacmeent. replace cabinets, vanities, fixturs, plumbing & light fixtures & tile.Details
remodel of 2 (e) bathrooms, inkind, like for like replacmeent. replace cabinets, vanities, fixturs, plumbing & light fixtures & tile. | $41,000 |
| Oct 18, 2017 | Expired or cancelled suspend Aug 2019 | 930 Grove St | repair & rehabilitate exterior bldg facades. repair (e) wood windows & doors. repair & rehabilitate interiors on floors 1,2 & 3. remodel interiors to include (n) kitchen & bathrooms. no structural work. mep under separate permits. drawings address nov's.Details
repair & rehabilitate exterior bldg facades. repair (e) wood windows & doors. repair & rehabilitate interiors on floors 1,2 & 3. remodel interiors to include (n) kitchen & bathrooms. no structural work. mep under separate permits. drawings address nov's. | $350,000 |
| Nov 8, 2016 | Never finaled issued Mar 2019, no final | 1715 Alabama St | horizontal & vertical addition. renovation of a single family residence. infill lightwell @ 2nd flr. (n) windows, doors & plumbing throughout. 2 new bedrooms & 2 new bathroom on 3rd floor. adu on on first floor.Details
horizontal & vertical addition. renovation of a single family residence. infill lightwell @ 2nd flr. (n) windows, doors & plumbing throughout. 2 new bedrooms & 2 new bathroom on 3rd floor. adu on on first floor. | $313,192 |
| Feb 24, 2015 | Completed final sign-off Mar 2016 | 27 Lyon St | reconfigure interior partitions and doors. add new shower, bath gr fl. convert existing water closet to shower. convert existing closet to bath. new bath at level 3. new interior finishes/fixutres in bathDetails
reconfigure interior partitions and doors. add new shower, bath gr fl. convert existing water closet to shower. convert existing closet to bath. new bath at level 3. new interior finishes/fixutres in bath | $45,000 |
| Dec 2, 2014 | Completed final sign-off Feb 2020 | 489 Day St | conversion of lower level storage to habitable space includes bathrm, bedrm & laudry. addition to rear of of 15' deep. addition housing bedroom & bath. add new interior stair. no alteration to front or bldg height.Details
conversion of lower level storage to habitable space includes bathrm, bedrm & laudry. addition to rear of of 15' deep. addition housing bedroom & bath. add new interior stair. no alteration to front or bldg height. | $148,000 |
| Nov 21, 2014 | Completed final sign-off Aug 2019 | 1451 Shotwell St | bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms.Details
bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms. | $400,000 |
| Oct 22, 2014 | Completed final sign-off Oct 2016 | 4020 26th St | horizontal addition at the rear of (e) three story single family res'd & interior alterion to the(e) bldg. the proposed horizontal addition includes a family room, office, bath, & laundry room. window replacement, a new deck & cosmetic altrations are proposed at the front facade.Details
horizontal addition at the rear of (e) three story single family res'd & interior alterion to the(e) bldg. the proposed horizontal addition includes a family room, office, bath, & laundry room. window replacement, a new deck & cosmetic altrations are proposed at the front facade. | $350,000 |
| Feb 11, 2014 | Completed final sign-off Sep 2021 | 891 Carolina St | change of use. convert existing single family house to 2-unit residence w/horizontal & vertical addition. remodel (n) kitchen,(n)bath,(n)bedrms & assoc living spac (n)decks & install(n)elevator. excavate rear yard. add fire sprinkler system throughout under separate permit.Details
change of use. convert existing single family house to 2-unit residence w/horizontal & vertical addition. remodel (n) kitchen,(n)bath,(n)bedrms & assoc living spac (n)decks & install(n)elevator. excavate rear yard. add fire sprinkler system throughout under separate permit. | $560,000 |
| Dec 9, 2013 | Completed final sign-off Aug 2015 | 126 17th Av | horizontal rear yard addition (does not increase overall length of bldg). garage level: (n) media rm & bath; 2nd level: enlarge family rm; top level: add bathroom, enlarge bedrm, (n) deck.Details
horizontal rear yard addition (does not increase overall length of bldg). garage level: (n) media rm & bath; 2nd level: enlarge family rm; top level: add bathroom, enlarge bedrm, (n) deck. | $125,000 |
| Apr 30, 2013 | Never finaled issued Jul 2013, no final | 2136 18th St | rev to an open pa# 201004230966 (n0 new structural) for a new 2 story addition to an (e) residence & the scope of the work includes mostly interior work; add 1 bathroom and relocate and remodel of 1 bathroom and 1 kitchen, also add two skylights& replace 3 windows in kind.Details
rev to an open pa# 201004230966 (n0 new structural) for a new 2 story addition to an (e) residence & the scope of the work includes mostly interior work; add 1 bathroom and relocate and remodel of 1 bathroom and 1 kitchen, also add two skylights& replace 3 windows in kind. | |
| Jul 19, 2012 | Never finaled issued Jul 2012, no final | 1333 Jones St | remove tile in master bath. room & guest bathroom - install new tile in master bath only. remove & replace (e) counter tops in kitchen with new. replace (e) hardwood flooring with new cork flooring. plumbing required for new washer/dryer. no layout change and no new opening on the wall.Details
remove tile in master bath. room & guest bathroom - install new tile in master bath only. remove & replace (e) counter tops in kitchen with new. replace (e) hardwood flooring with new cork flooring. plumbing required for new washer/dryer. no layout change and no new opening on the wall. | $40,000 |
| Jun 19, 2012 | Completed final sign-off Feb 2021 | 4524 25th St | alteration to 1st & 3rd floors. addition at rear on all floors. addition of new bedroom, 2 new baths, family room & expand basement level.Details
alteration to 1st & 3rd floors. addition at rear on all floors. addition of new bedroom, 2 new baths, family room & expand basement level. | $140,000 |
| Feb 8, 2010 | Completed final sign-off Jun 2011 | 83 Vicksburg St | remodel all floors of (e) 3 story single family res. scope includes: excavation of ground floor to achieve legal head height, converting (e) roof to occupied roof, dormer addition, voluntary seismic upgrades, infill under (e) condition porch, bathroom & kitchen remodelDetails
remodel all floors of (e) 3 story single family res. scope includes: excavation of ground floor to achieve legal head height, converting (e) roof to occupied roof, dormer addition, voluntary seismic upgrades, infill under (e) condition porch, bathroom & kitchen remodel | $300,000 |
| Jul 11, 2007 | Expired or cancelled expired Jul 2008 | 150 Saint Germain Av | remodel kitchen. remodel bathroom.Details
remodel kitchen. remodel bathroom. | $15,000 |
| Apr 5, 2007 | Completed final sign-off Jul 2009 | 150 Saint Germain Av | interior remodel including kitchen and bathrooms and new windows. railing at rear to be refurbished with new infill panels.Details
interior remodel including kitchen and bathrooms and new windows. railing at rear to be refurbished with new infill panels. | $353,000 |
| Jul 26, 2006 | Expired or cancelled expired Nov 2009 | 24 Winfield St | replace vinyl windows w/cedar wood windows, remodel kitchens and bath in both unit, replace e garage door with wood garage door. same size and location. add 1 full bath at top unit. sheetrock work at ktichen and bath, 1 new skylightDetails
replace vinyl windows w/cedar wood windows, remodel kitchens and bath in both unit, replace e garage door with wood garage door. same size and location. add 1 full bath at top unit. sheetrock work at ktichen and bath, 1 new skylight | $100,000 |
| Jul 18, 2005 | Expired or cancelled expired Apr 2006 | 517 Hickory St | as bult revision for permit 200005180428 s1 r3 to show interior glass window at bath and new windowDetails
as bult revision for permit 200005180428 s1 r3 to show interior glass window at bath and new window | $500 |
| Aug 14, 2003 | Completed final sign-off Mar 2005 | 271 30th St | remodel (e) res. to include kitchen/powder room/2 bath/master closet/laundry/study. new spiral stairDetails
remodel (e) res. to include kitchen/powder room/2 bath/master closet/laundry/study. new spiral stair | $73,000 |
| May 27, 2003 | Completed final sign-off Jul 2003 | 1256 Lombard St | demolition of interior fixtures & surfaces only bathroom demolition only.Details
demolition of interior fixtures & surfaces only bathroom demolition only. | $2,000 |
| Mar 4, 2003 | Completed final sign-off Apr 2003 | 1845 Alabama St | install new sheetrock @ bathroom & kitchen.install new kitchen cabinets.tile & trim @ bathroom.Details
install new sheetrock @ bathroom & kitchen.install new kitchen cabinets.tile & trim @ bathroom. | $5,000 |