Block 0500, lot 013
1256 Lombard St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 10, 2014 | Completed final sign-off Dec 2014 | 1256 Lombard St | Gelling & Judd Inc. | remodel to unconditioned store; add non struc wlls & closet doors to e b/f store. new wine storage, new gyp bd to e storage walls and ceilings. add new guardrail/handrail to stair ,add 1 step; lightings; no work on other fls.Details
remodel to unconditioned store; add non struc wlls & closet doors to e b/f store. new wine storage, new gyp bd to e storage walls and ceilings. add new guardrail/handrail to stair ,add 1 step; lightings; no work on other fls. | $15,000 |
| Sep 26, 2014 | Completed final sign-off Mar 2015 | 1256 Lombard St | J K M Fire Protection | adding 2" fire service to finish/close permit per app#200508099847 r-2. n/a for the maher ordinance#155-13Details
adding 2" fire service to finish/close permit per app#200508099847 r-2. n/a for the maher ordinance#155-13 | $8,000 |
| Sep 16, 2014 | Completed final sign-off Jul 2015 | 1256 Lombard St | Gelling & Judd Inc. | to obtain final inspection for work approved under pa#200502256300 all work is complete. n/a ordinance #155-13.Details
to obtain final inspection for work approved under pa#200502256300 all work is complete. n/a ordinance #155-13. | |
| Sep 16, 2014 | Completed final sign-off Mar 2015 | 1256 Lombard St | Gelling & Judd Inc. | to comply with physical inspection report #cc-7849 electrical, plumbing and building report bring upto code. n/a ordinance #155-13.Details
to comply with physical inspection report #cc-7849 electrical, plumbing and building report bring upto code. n/a ordinance #155-13. | $2,000 |
| Dec 14, 2012 | Completed final sign-off Feb 2013 | 1258 Lombard St | W Factor Construction Inc | replace (e) 1 window with new window at side of building (alley)Details
replace (e) 1 window with new window at side of building (alley) | $2,000 |
| Mar 4, 2010 | Completed final sign-off Oct 2010 | 1256 Lombard St | Gelling & Judd Inc. | removal of wall at bottom of stair at 2nd floor, work to be done in conjuction with dwelling unit merger, merging (e) housekeeping unit at 2nd floor into the dwelling unit on the third floor.Details
removal of wall at bottom of stair at 2nd floor, work to be done in conjuction with dwelling unit merger, merging (e) housekeeping unit at 2nd floor into the dwelling unit on the third floor. | $400 |
| Apr 4, 2006 | Expired or cancelled cancelled Nov 2007 | 1258 Lombard St | relocate (e) housekeeping unit / merge (e) lower unit at 1st floor.Details
relocate (e) housekeeping unit / merge (e) lower unit at 1st floor. | $125,000 | |
| Aug 9, 2005 | Completed final sign-off Oct 2005 | 1256 Lombard St | Barker-O'donoghue Master Bldrs | renewal pa 200305275459, 200406216973 for final inspection.Details
renewal pa 200305275459, 200406216973 for final inspection. | |
| Feb 25, 2005 | Expired or cancelled expired Mar 2015 | 1256 Lombard St | Mazzys Fire Protection | add new fire sprinklers to (e0 garage and rear storage areaDetails
add new fire sprinklers to (e0 garage and rear storage area | $7,000 |
| Oct 22, 2004 | Completed final sign-off Jul 2005 | 1256 Lombard St | new stair to connect 1st floor to 2nd floor, remodel 1st floor, relocate (e) rear windowDetails
new stair to connect 1st floor to 2nd floor, remodel 1st floor, relocate (e) rear window | $48,000 | |
| Jun 21, 2004 | Expired or cancelled expired Oct 2005 | 1256 Lombard St | rmodel of 3rd floor dwelling unit. work includes remodelof two bathrooms, new kitchen counters and *Details
rmodel of 3rd floor dwelling unit. work includes remodelof two bathrooms, new kitchen counters and * | $42,000 | |
| Jan 15, 2004 | Completed final sign-off Feb 2004 | 1256 Lombard St | Barker-O'donoghue Master Bldrs | basic siesmic upgrade & foundation bolts, hds, sheerwall. drawings.(voluntary seismic strengtheingDetails
basic siesmic upgrade & foundation bolts, hds, sheerwall. drawings.(voluntary seismic strengtheing | $10,000 |
| May 27, 2003 | Expired or cancelled expired Oct 2005 | 1256 Lombard St | Barker-O'donoghue Master Bldrs | remodeling of exist 1st flr flat bathrms; new kitchen finishes; replacement windows to double pane gDetails
remodeling of exist 1st flr flat bathrms; new kitchen finishes; replacement windows to double pane g | $35,000 |
| May 27, 2003 | Completed final sign-off Jul 2003 | 1256 Lombard St | Barker-O'donoghue Master Bldrs | demolition of interior fixtures & surfaces only bathroom demolition only.Details
demolition of interior fixtures & surfaces only bathroom demolition only. | $2,000 |
| Jan 13, 2003 | Expired or cancelled withdrawn Apr 2003 | 1256 Lombard St | Tom Can Construction | remove illegal kitchen in garage area cap all utilities at source, remove non load bearing walls & cDetails
remove illegal kitchen in garage area cap all utilities at source, remove non load bearing walls & c | $6,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Barker-O'donoghue Master Bldrs (4), Gelling & Judd Inc. (4), J K M Fire Protection, Mazzys Fire Protection, Tom Can Construction, W Factor Construction Inc
- Architects
- John Lum Architecture
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.