Barker-O'donoghue Master Bldrs
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Jul 2025
- Last 24 months
- 5 permits filed
109 permits since 2000: 81 completed, 3 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 8 completed, 3 expired or cancelled. Typically 250 days from filing to permit and 468 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2017 | Completed final sign-off Jun 2021 | 3826 25th St | expanding all 3 flrs north. addition of east dormer. extedning west dormer north. three (n) operable skylights. (n) green roof @ balcony above 2nd flr expansion. (n) deck above 1st flr expansion. (n) planter on west side of deck. (n) stairs off (n) 2nd flr deck to rear yard grade.Details
expanding all 3 flrs north. addition of east dormer. extedning west dormer north. three (n) operable skylights. (n) green roof @ balcony above 2nd flr expansion. (n) deck above 1st flr expansion. (n) planter on west side of deck. (n) stairs off (n) 2nd flr deck to rear yard grade. | $375,000 |
| Jan 18, 2017 | Expired or cancelled cancelled Jan 2026 | 1769 Beach St | revision to app#201408184113. remove extg top run of rear stairs from 3rd floor to 2nd floor and replace with ipe deck. remove extg roof canopy. n/a for maherDetails
revision to app#201408184113. remove extg top run of rear stairs from 3rd floor to 2nd floor and replace with ipe deck. remove extg roof canopy. n/a for maher | |
| Nov 21, 2014 | Completed final sign-off Aug 2019 | 1451 Shotwell St | bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms.Details
bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms. | $400,000 |
| Oct 22, 2014 | Completed final sign-off Oct 2016 | 4020 26th St | horizontal addition at the rear of (e) three story single family res'd & interior alterion to the(e) bldg. the proposed horizontal addition includes a family room, office, bath, & laundry room. window replacement, a new deck & cosmetic altrations are proposed at the front facade.Details
horizontal addition at the rear of (e) three story single family res'd & interior alterion to the(e) bldg. the proposed horizontal addition includes a family room, office, bath, & laundry room. window replacement, a new deck & cosmetic altrations are proposed at the front facade. | $350,000 |
| Feb 11, 2014 | Completed final sign-off Sep 2021 | 891 Carolina St | change of use. convert existing single family house to 2-unit residence w/horizontal & vertical addition. remodel (n) kitchen,(n)bath,(n)bedrms & assoc living spac (n)decks & install(n)elevator. excavate rear yard. add fire sprinkler system throughout under separate permit.Details
change of use. convert existing single family house to 2-unit residence w/horizontal & vertical addition. remodel (n) kitchen,(n)bath,(n)bedrms & assoc living spac (n)decks & install(n)elevator. excavate rear yard. add fire sprinkler system throughout under separate permit. | $560,000 |
| Dec 9, 2013 | Completed final sign-off Aug 2015 | 126 17th Av | horizontal rear yard addition (does not increase overall length of bldg). garage level: (n) media rm & bath; 2nd level: enlarge family rm; top level: add bathroom, enlarge bedrm, (n) deck.Details
horizontal rear yard addition (does not increase overall length of bldg). garage level: (n) media rm & bath; 2nd level: enlarge family rm; top level: add bathroom, enlarge bedrm, (n) deck. | $125,000 |
| Oct 11, 2005 | Expired or cancelled expired May 2008 | 2741 Divisadero St | site permit application - lateral/rear infill addition on all floors - remove existing substandard deck, greenhouse and stairs.- horizontal addition.Details
site permit application - lateral/rear infill addition on all floors - remove existing substandard deck, greenhouse and stairs.- horizontal addition. | $250,000 |
| May 12, 2003 | Completed final sign-off Jun 2003 | 806 De Haro St | re-surface extng deck w/ maranti type hardwood & trim. local dry rot/flushing. repair @ windows.Details
re-surface extng deck w/ maranti type hardwood & trim. local dry rot/flushing. repair @ windows. | $5,000 |
| Apr 16, 2003 | Completed final sign-off Jun 2003 | 806 De Haro St | pull up slate deck, renew membrane install wood type deck overe top -approx 100 s.qfDetails
pull up slate deck, renew membrane install wood type deck overe top -approx 100 s.qf | $6,760 |
| Feb 26, 2003 | Completed final sign-off Nov 2004 | 515 Chenery St | removal of rear deck and bay, replace with new horizontal addition to include new deck & stair, addDetails
removal of rear deck and bay, replace with new horizontal addition to include new deck & stair, add | $200,000 |
| Dec 5, 2001 | Expired or cancelled expired Aug 2005 | 321 Duncan St | addition of 1st fl. deck & second fl deck at rear of bldg. w/(n) stairs. remodel of 2nd fl kitchen &Details
addition of 1st fl. deck & second fl deck at rear of bldg. w/(n) stairs. remodel of 2nd fl kitchen & | $57,000 |