Back to kitchen remodel contractors
Barbosa Construction & Design **See Note
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Feb 2015
- Last 24 months
- 0 permits filed
14 permits since 2000: 9 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 expired or cancelled. Typically 13 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2009 | Expired or cancelled expired May 2018 | 3566 17th St | localized removal of kitchen bearing wallDetails
localized removal of kitchen bearing wall | $5,000 |
| May 27, 2009 | Expired or cancelled expired Jan 2016 | 3566 17th St | replace (resurfacing) existing two bathrooms- master & guest & repalce (resurfacing) kitchen - replace fixtures & appliances.no change bathroom lighting, piping.Details
replace (resurfacing) existing two bathrooms- master & guest & repalce (resurfacing) kitchen - replace fixtures & appliances.no change bathroom lighting, piping. | $20,000 |
| Mar 4, 2008 | Completed final sign-off Apr 2009 | 523 Valley St | remodel kitchen at ground floor, update baths at ground and 1st floor, replace lath and plaster at kitchen and bedroom on ground floor only.Details
remodel kitchen at ground floor, update baths at ground and 1st floor, replace lath and plaster at kitchen and bedroom on ground floor only. | $60,000 |
| Feb 13, 2008 | Completed final sign-off Mar 2009 | 622 Spruce St | upper level: remove wall in hallway, replace lath & plaster w/drywall 3 rooms & hall.remodel kitchen & move into (e) bedroom. remodel bathroom,move 1/2 bath,add stairway to lower level. downstairs.remove kitchen & replace with bathroom, add laundry closet. move rear door, combine ex 2 units to 1.Details
upper level: remove wall in hallway, replace lath & plaster w/drywall 3 rooms & hall.remodel kitchen & move into (e) bedroom. remodel bathroom,move 1/2 bath,add stairway to lower level. downstairs.remove kitchen & replace with bathroom, add laundry closet. move rear door, combine ex 2 units to 1. | $180,000 |
| Dec 20, 2007 | Completed final sign-off Jul 2008 | 979 Duncan St | work on unit 979 - remove wall in hallway. dividing kitchen and hall. remodel kitchen. relocate (2) bathrooms. replace drywall for elecrical and plumbing.Details
work on unit 979 - remove wall in hallway. dividing kitchen and hall. remodel kitchen. relocate (2) bathrooms. replace drywall for elecrical and plumbing. | $100,000 |