Back to bathroom remodel contractors
Barbosa Construction & Design **See Note
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Feb 2015
- Last 24 months
- 0 permits filed
14 permits since 2000: 9 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 8, 2013 | Completed final sign-off May 2013 | 484 Los Palmos Dr | new bathroom and laundry room in non habitable space. relocate furnace and water heater. new finish for existing staircaseDetails
new bathroom and laundry room in non habitable space. relocate furnace and water heater. new finish for existing staircase | $30,000 |
| May 27, 2009 | Expired or cancelled expired Jan 2016 | 3566 17th St | replace (resurfacing) existing two bathrooms- master & guest & repalce (resurfacing) kitchen - replace fixtures & appliances.no change bathroom lighting, piping.Details
replace (resurfacing) existing two bathrooms- master & guest & repalce (resurfacing) kitchen - replace fixtures & appliances.no change bathroom lighting, piping. | $20,000 |
| May 28, 2008 | Completed final sign-off Jul 2008 | 979 Duncan St | revision to 200712200984 to include 3 wall heater in living room, master bathroom, and 2nd bedroomDetails
revision to 200712200984 to include 3 wall heater in living room, master bathroom, and 2nd bedroom | $600 |
| Mar 4, 2008 | Completed final sign-off Apr 2009 | 523 Valley St | remodel kitchen at ground floor, update baths at ground and 1st floor, replace lath and plaster at kitchen and bedroom on ground floor only.Details
remodel kitchen at ground floor, update baths at ground and 1st floor, replace lath and plaster at kitchen and bedroom on ground floor only. | $60,000 |
| Feb 13, 2008 | Completed final sign-off Mar 2009 | 622 Spruce St | upper level: remove wall in hallway, replace lath & plaster w/drywall 3 rooms & hall.remodel kitchen & move into (e) bedroom. remodel bathroom,move 1/2 bath,add stairway to lower level. downstairs.remove kitchen & replace with bathroom, add laundry closet. move rear door, combine ex 2 units to 1.Details
upper level: remove wall in hallway, replace lath & plaster w/drywall 3 rooms & hall.remodel kitchen & move into (e) bedroom. remodel bathroom,move 1/2 bath,add stairway to lower level. downstairs.remove kitchen & replace with bathroom, add laundry closet. move rear door, combine ex 2 units to 1. | $180,000 |
| Dec 20, 2007 | Completed final sign-off Jul 2008 | 979 Duncan St | work on unit 979 - remove wall in hallway. dividing kitchen and hall. remodel kitchen. relocate (2) bathrooms. replace drywall for elecrical and plumbing.Details
work on unit 979 - remove wall in hallway. dividing kitchen and hall. remodel kitchen. relocate (2) bathrooms. replace drywall for elecrical and plumbing. | $100,000 |