Baba Builders Co
- Based in
- San Bruno
- On San Francisco permits
- Aug 2009 to Aug 2026
- Last 24 months
- 6 permits filed
92 permits since 2000: 55 completed, 3 in progress, 28 never finaled, 6 expired or cancelled.
Of the 28 never-finaled permits, 2 are 3 to 5 years old, 15 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 7 completed, 3 never finaled. Typically 44 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2021 | Completed final sign-off Apr 2021 | 1219 40th Av | repair existing stair at rear 50% max repair in kind.Details
repair existing stair at rear 50% max repair in kind. | $5,000 |
| Apr 29, 2020 | Completed final sign-off May 2020 | 1223 07th Av | item #2 per nov#201970341: repair and replace awning framing less then 50% to match extg per nov complaint #201970341 item #3 nov201970341: repair and replace exterior stairs less then 50%Details
item #2 per nov#201970341: repair and replace awning framing less then 50% to match extg per nov complaint #201970341 item #3 nov201970341: repair and replace exterior stairs less then 50% | $1,800 |
| Oct 12, 2016 | Never finaled issued Apr 2017, no final | 960 Howard St | comply w/complaints: barrier removal: new h.c. toilet to replace non complying toilets. remove front door and stair. new auto doors located at center front bay. new stairs and lift. repair conc. recess panels at extg & new door locations, modify extg windows at door locations.Details
comply w/complaints: barrier removal: new h.c. toilet to replace non complying toilets. remove front door and stair. new auto doors located at center front bay. new stairs and lift. repair conc. recess panels at extg & new door locations, modify extg windows at door locations. | $30,000 |
| Jun 14, 2016 | Completed final sign-off May 2022 | 1379 Kansas St | excavate (e) ground fl to convert grd flr storage to habitable studio vertical & horizontal addition to enlarge (e) kitchen & bedroom. remodel bath, relocate (e) entry stairs & excavate for off street bike storage.**maher yes**Details
excavate (e) ground fl to convert grd flr storage to habitable studio vertical & horizontal addition to enlarge (e) kitchen & bedroom. remodel bath, relocate (e) entry stairs & excavate for off street bike storage.**maher yes** | $175,000 |
| Feb 25, 2016 | Never finaled issued Sep 2016, no final | 2439 Pacific Av | relocate lower level unit at 2nd floor to 1st floor level 25% set max reduction. subterranian addition at rear within 25% setback less than 3' above extg grade. modify stair at 2nd level to connect 2nd floor with upper floor unit. building to be fully sprinklered (nfpa-13r).Details
relocate lower level unit at 2nd floor to 1st floor level 25% set max reduction. subterranian addition at rear within 25% setback less than 3' above extg grade. modify stair at 2nd level to connect 2nd floor with upper floor unit. building to be fully sprinklered (nfpa-13r). | $60,000 |
| Nov 13, 2015 | Completed final sign-off Jan 2019 | 513 08th Av | rear addition & partial attic & garage conversion to habitable. (e) kitchen will be remodeled. (n) full & a half bath will be added. (n) stair to garage level. mud room is proposed.Details
rear addition & partial attic & garage conversion to habitable. (e) kitchen will be remodeled. (n) full & a half bath will be added. (n) stair to garage level. mud room is proposed. | $175,000 |
| May 8, 2014 | Completed final sign-off Oct 2014 | 327 Hayes St | repair & rebuild existing exit stair @ rear yard, existing non conforming condition for egress , repair in kind.n/a maherDetails
repair & rebuild existing exit stair @ rear yard, existing non conforming condition for egress , repair in kind.n/a maher | $5,000 |
| Sep 13, 2013 | Completed final sign-off Oct 2018 | 4272 23rd St | replacement of dryrotted stair in kind at back of bldg. same location, same configuration. required means of egress. to comply with complaint #201032501Details
replacement of dryrotted stair in kind at back of bldg. same location, same configuration. required means of egress. to comply with complaint #201032501 | $5,000 |
| Apr 17, 2012 | Completed final sign-off Jun 2012 | 1679 Broderick St | repair or replace back stairs to buildings. paint to match builders.Details
repair or replace back stairs to buildings. paint to match builders. | $7,500 |
| Jan 11, 2010 | Never finaled issued Jan 2010, no final | 1454 South Van Ness Av | to comply with his nov# 2009.28391. remodel bathrooms incl. fixtures in units 2 and 3, paint units, tile floor, new carpet. unit 5 : new paint, new carpet. work to include replacement of rotten boards of stairsDetails
to comply with his nov# 2009.28391. remodel bathrooms incl. fixtures in units 2 and 3, paint units, tile floor, new carpet. unit 5 : new paint, new carpet. work to include replacement of rotten boards of stairs | $8,500 |