Back to bathroom remodel contractors
Baba Builders Co
- Based in
- San Bruno
- On San Francisco permits
- Aug 2009 to Aug 2026
- Last 24 months
- 6 permits filed
92 permits since 2000: 55 completed, 3 in progress, 28 never finaled, 6 expired or cancelled.
Of the 28 never-finaled permits, 2 are 3 to 5 years old, 15 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 11 completed, 1 in progress, 3 never finaled. Typically 0 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | In progress issued May 2026 | 2319 Green St | unit 2: remodel kitchen and 1/2 bath and 1 full bath, in kind. patch plaster and paint walls, refinish hardwood flooring.Details
unit 2: remodel kitchen and 1/2 bath and 1 full bath, in kind. patch plaster and paint walls, refinish hardwood flooring. | $22,000 |
| May 27, 2020 | Completed final sign-off Aug 2021 | 346 01st St | unit 109. 2 bathroom remodels: remove tile, install new shower pan, install new tile walls and floors, new fixtures. all remodel work in-kind.Details
unit 109. 2 bathroom remodels: remove tile, install new shower pan, install new tile walls and floors, new fixtures. all remodel work in-kind. | $8,500 |
| Dec 22, 2017 | Completed final sign-off Aug 2023 | 1080 Capp St | remodel (e) 4 bedroom apartment. relocate 1 full bath. adding 2-1/2 baths. replace 3 windows in the lightwell.Details
remodel (e) 4 bedroom apartment. relocate 1 full bath. adding 2-1/2 baths. replace 3 windows in the lightwell. | $150,000 |
| Jun 14, 2016 | Completed final sign-off May 2022 | 1379 Kansas St | excavate (e) ground fl to convert grd flr storage to habitable studio vertical & horizontal addition to enlarge (e) kitchen & bedroom. remodel bath, relocate (e) entry stairs & excavate for off street bike storage.**maher yes**Details
excavate (e) ground fl to convert grd flr storage to habitable studio vertical & horizontal addition to enlarge (e) kitchen & bedroom. remodel bath, relocate (e) entry stairs & excavate for off street bike storage.**maher yes** | $175,000 |
| Nov 13, 2015 | Completed final sign-off Jan 2019 | 513 08th Av | rear addition & partial attic & garage conversion to habitable. (e) kitchen will be remodeled. (n) full & a half bath will be added. (n) stair to garage level. mud room is proposed.Details
rear addition & partial attic & garage conversion to habitable. (e) kitchen will be remodeled. (n) full & a half bath will be added. (n) stair to garage level. mud room is proposed. | $175,000 |
| Feb 9, 2015 | Completed final sign-off Nov 2015 | 2824 Geary Bl | #2: remodel kitchen and bath. add bathroom, relocate bedroom, add washer & dryer.Details
#2: remodel kitchen and bath. add bathroom, relocate bedroom, add washer & dryer. | $30,000 |
| Nov 6, 2014 | Completed final sign-off Oct 2015 | 959 Corbett Av | unit #14: 1 kitchen and 1 bath, remodel paint unit finish floor, tile floor, bath & kitchen wall tile bath. lighting in kitchen & bathroom remodel shall comply with cec 150 (k). no new wall & no existing wall relocation.Details
unit #14: 1 kitchen and 1 bath, remodel paint unit finish floor, tile floor, bath & kitchen wall tile bath. lighting in kitchen & bathroom remodel shall comply with cec 150 (k). no new wall & no existing wall relocation. | $10,500 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 2186 Union St | to comply with complaint 201494584 - 2 common bathrooms - tile walls and floors and shower; paint walls, ceiling and trim; replace with new toilets and sinks. n/a ordinance #155-13Details
to comply with complaint 201494584 - 2 common bathrooms - tile walls and floors and shower; paint walls, ceiling and trim; replace with new toilets and sinks. n/a ordinance #155-13 | $3,500 |
| Apr 9, 2014 | Completed final sign-off Dec 2014 | 186 02nd St | t.i. including new commercial kitchen, food prep area, seating area, retail areas, electrical, mechanical and plmg work with new accessible bathrooms. n/a for the maher ordinance #155-13Details
t.i. including new commercial kitchen, food prep area, seating area, retail areas, electrical, mechanical and plmg work with new accessible bathrooms. n/a for the maher ordinance #155-13 | $276,000 |
| Jun 28, 2012 | Completed final sign-off Dec 2012 | 2310 Leavenworth St | unit # 2: remodel bath and kitchen, new floor covering, wall covering, new tub. new cabinets and tops. hardwood floor in kitchen, tile floor bath. no new walls. install new toilet, vanity and tub. also washer/dryer reinstall. reconnect electrical outlets gfci electrical dryer.Details
unit # 2: remodel bath and kitchen, new floor covering, wall covering, new tub. new cabinets and tops. hardwood floor in kitchen, tile floor bath. no new walls. install new toilet, vanity and tub. also washer/dryer reinstall. reconnect electrical outlets gfci electrical dryer. | $22,000 |
| Dec 15, 2011 | Completed final sign-off Aug 2012 | 984 Valencia St | notice of violation complaint 3201173437. repair bathroom floor, repair window sash cord, repair walls and ceiling in dining room, repair window second floor, patch & paint.Details
notice of violation complaint 3201173437. repair bathroom floor, repair window sash cord, repair walls and ceiling in dining room, repair window second floor, patch & paint. | $2,500 |
| Jan 11, 2010 | Never finaled issued Jan 2010, no final | 1454 South Van Ness Av | to comply with his nov# 2009.28391. remodel bathrooms incl. fixtures in units 2 and 3, paint units, tile floor, new carpet. unit 5 : new paint, new carpet. work to include replacement of rotten boards of stairsDetails
to comply with his nov# 2009.28391. remodel bathrooms incl. fixtures in units 2 and 3, paint units, tile floor, new carpet. unit 5 : new paint, new carpet. work to include replacement of rotten boards of stairs | $8,500 |
| Oct 13, 2009 | Completed final sign-off May 2010 | 2437 Pacific Av | kitchen and bath remodel.no wall moving or add. no layout change.Details
kitchen and bath remodel.no wall moving or add. no layout change. | $18,000 |
| Sep 29, 2009 | Never finaled issued Sep 2009, no final | 3154 Octavia St | work @ unit#3156 octavia st only. remodel kitchen & bathroom only. no plans. no new walls or moving wall. kitchen 50% of lighting wattage be of high efficancy lights. bath: high efficancy lights or manual on occupancy sensor.Details
work @ unit#3156 octavia st only. remodel kitchen & bathroom only. no plans. no new walls or moving wall. kitchen 50% of lighting wattage be of high efficancy lights. bath: high efficancy lights or manual on occupancy sensor. | $30,000 |
| Aug 24, 2009 | Never finaled issued Aug 2009, no final | 3154 Octavia St | remodel kitchen cabinets and appliances. remodel bathroom fixtures and tile.Details
remodel kitchen cabinets and appliances. remodel bathroom fixtures and tile. | $15,000 |