Back to bathroom remodel contractors
Baa General Builder
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Mar 2026
- Last 24 months
- 6 permits filed
20 permits since 2000: 14 completed, 3 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 5 completed, 2 in progress, 2 never finaled. Typically 4 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2025 | In progress issued Aug 2025 | 1940 Vallejo St | unit 3: remove ports of the drywall to install new electrical subpanel, install new p trap on 3 bathrooms sinks, replace old wire in conduit for outlets and lights.Details
unit 3: remove ports of the drywall to install new electrical subpanel, install new p trap on 3 bathrooms sinks, replace old wire in conduit for outlets and lights. | $800 |
| Aug 2, 2024 | Completed final sign-off Sep 2024 | 3002 Baker St | 2nd floor: bathroom addition 36sq ft approximately. demo interior wall non structural. update plumbing and install one new electrical circuit & ceiling lights & exhaust fancDetails
2nd floor: bathroom addition 36sq ft approximately. demo interior wall non structural. update plumbing and install one new electrical circuit & ceiling lights & exhaust fanc | $18,000 |
| Mar 1, 2024 | In progress filed Mar 2024, not yet issued | 2250 Mission St | build new 1/2 bath on (e) space, install new under ground plumbing insall new circuit new bath room will be built in the comic store in ground fl.Details
build new 1/2 bath on (e) space, install new under ground plumbing insall new circuit new bath room will be built in the comic store in ground fl. | $15,000 |
| Jul 17, 2023 | Completed final sign-off Dec 2024 | 2250 Mission St | comply w/nov 202302914 ; unit 101 -interior alterations to legalize the configuration of the ground floor dwelling unit to include 2 bedrooms, w full bathrooms, kitchen & living roomDetails
comply w/nov 202302914 ; unit 101 -interior alterations to legalize the configuration of the ground floor dwelling unit to include 2 bedrooms, w full bathrooms, kitchen & living room | $30,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 10 Sumner St | legalize (e) dwelling unit, 10 sumner st apt #e per ordinance 43-14/planning code section 207.3. legalized unit include bedroom, living bathroom, & kitchen.Details
legalize (e) dwelling unit, 10 sumner st apt #e per ordinance 43-14/planning code section 207.3. legalized unit include bedroom, living bathroom, & kitchen. | $23,000 |
| Nov 21, 2022 | Never finaled issued Nov 2022, no final | 264 Collingwood St | bathroom remodel: update plumbing/install 2 new electrical circuit for bathroom only/bathroom fan.Details
bathroom remodel: update plumbing/install 2 new electrical circuit for bathroom only/bathroom fan. | $15,000 |
| Nov 18, 2022 | Completed final sign-off Jul 2023 | 2280 Pacific Av | unit #302: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0 (k)3 & (k)5.Details
unit #302: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0 (k)3 & (k)5. | $18,000 |
| Nov 18, 2022 | Completed final sign-off Jul 2023 | 2280 Pacific Av | unit #602: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
unit #602: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)3 & (k)5. | $18,000 |
| Mar 23, 2022 | Completed final sign-off May 2023 | 3731 26th St | legalization of (e) dwelling unit in (e) single family dwelling. remodel (e) habital space on 1st floor (unit b) onl, including kitchen and bathroom. upgrade fire separation between units common at property line. new foundations throughout.Details
legalization of (e) dwelling unit in (e) single family dwelling. remodel (e) habital space on 1st floor (unit b) onl, including kitchen and bathroom. upgrade fire separation between units common at property line. new foundations throughout. | $12,000 |