Block 0580, lot 011
2280 Pacific Ave
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 6
- Units
- 24
- Rooms
- 24 bathrooms
- Building
- 28,614 sq ft
- Lot
- 6,609 sq ft
- Zoning
- RM1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 24, 2024 | In progress issued Dec 2024 | 2280 Pacific Av | Crime Watch Security Sys Llc | upgrade exising fire alarm system to comply with sffc section 1103.7.6.1.Details
upgrade exising fire alarm system to comply with sffc section 1103.7.6.1. | $76,800 |
| Nov 18, 2022 | Completed final sign-off Jul 2023 | 2280 Pacific Av | Baa General Builder | unit #602: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
unit #602: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)3 & (k)5. | $18,000 |
| Nov 18, 2022 | Completed final sign-off Jul 2023 | 2280 Pacific Av | Baa General Builder | unit #302: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0 (k)3 & (k)5.Details
unit #302: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0 (k)3 & (k)5. | $18,000 |
| Apr 13, 2021 | Never finaled issued Apr 2021, no final | 2280 Pacific Av | remodel kitchen cabinets in #504 and #604 and #202 and kitchen appliances.Details
remodel kitchen cabinets in #504 and #604 and #202 and kitchen appliances. | $30,000 | |
| May 28, 2019 | Never finaled issued May 2019, no final | 2280 Pacific Av | apt 204: tile secondary bathroom.Details
apt 204: tile secondary bathroom. | $3,000 | |
| Sep 7, 2018 | Never finaled issued Sep 2018, no final | 2280 Pacific Av | unit 203 re-tile 3500 sq ftDetails
unit 203 re-tile 3500 sq ft | $3,000 | |
| Jun 27, 2018 | Completed final sign-off Aug 2018 | 2280 Pacific Av | Everest Waterproofing & Restoration Inc. | apt 602: to comply with nov# 20186808. #3. repair ceiling in kind.Details
apt 602: to comply with nov# 20186808. #3. repair ceiling in kind. | $5,000 |
| Sep 29, 2016 | Never finaled issued Sep 2016, no final | 2280 Pacific Av | street spaceDetails
street space | ||
| Aug 26, 2016 | Never finaled issued Aug 2016, no final | 2280 Pacific Av | street space permitDetails
street space permit | ||
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 2280 Pacific Av | unit 601: remodel kitchen/cabinets/bath/hall. no structural work.Details
unit 601: remodel kitchen/cabinets/bath/hall. no structural work. | $7,500 | |
| Aug 27, 2015 | Never finaled issued Aug 2015, no final | 2280 Pacific Av | repair stucco at front of building approx 150 sfDetails
repair stucco at front of building approx 150 sf | $3,000 | |
| Apr 4, 2014 | Completed final sign-off Jul 2014 | 2280 Pacific Av | work in unit 201: replace tub and shower enclosures, window, tubv valve waste and overflow. bathroom remodel.Details
work in unit 201: replace tub and shower enclosures, window, tubv valve waste and overflow. bathroom remodel. | $2,500 | |
| Sep 7, 2012 | Expired or cancelled expired Jul 2014 | 2280 Pacific Av | remodel kitchen-new cabinets, new appliances, counter top & sink. remodel bathroom-new tile & cabinetsDetails
remodel kitchen-new cabinets, new appliances, counter top & sink. remodel bathroom-new tile & cabinets | $13,000 | |
| Apr 30, 2010 | Completed final sign-off Dec 2010 | 2280 Pacific Av | unit #204: remodel kitchen, bath; remove/replace ceiling in unit; kitchen bath hallway; kitchen cabinets, countertop, electric; bath tile and fixturesDetails
unit #204: remodel kitchen, bath; remove/replace ceiling in unit; kitchen bath hallway; kitchen cabinets, countertop, electric; bath tile and fixtures | $3,500 | |
| Jan 29, 2010 | Completed final sign-off Jul 2010 | 2280 Pacific Av | remodel kitchen & bath. remove/replace plaster ceiling in kit., bath & hallway. kitchen: (n) cabinets, countertops, electrical & plumbing, bath: (n) tile & fixtures,Details
remodel kitchen & bath. remove/replace plaster ceiling in kit., bath & hallway. kitchen: (n) cabinets, countertops, electrical & plumbing, bath: (n) tile & fixtures, | $5,000 | |
| Jun 3, 2009 | Never finaled issued Jun 2009, no final | 2280 Pacific Av | street space permit only.Details
street space permit only. | ||
| May 7, 2009 | Completed final sign-off Aug 2009 | 2280 Pacific Av | work @ unit# 404 & #504 only. remodel kitchen & bathroom. new tile counters on new cabinets in kitchen. new appliances in kitchen. new tile & fixtures in baths. new bathtub & sink installed. paint entire unit & refurnish the hardwood floors.Details
work @ unit# 404 & #504 only. remodel kitchen & bathroom. new tile counters on new cabinets in kitchen. new appliances in kitchen. new tile & fixtures in baths. new bathtub & sink installed. paint entire unit & refurnish the hardwood floors. | $8,500 | |
| May 4, 2009 | Never finaled issued May 2009, no final | 2280 Pacific Av | street space for scaffoldDetails
street space for scaffold | ||
| Aug 6, 2008 | Completed final sign-off Sep 2008 | 2280 Pacific Av | Kelly Roofing Inc | reroofingDetails
reroofing | $49,600 |
| Apr 9, 2002 | Completed final sign-off Sep 2002 | 2280 Pacific Av | Flagmount Construction Inc | remove & replace existing windows with new marvin windowsDetails
remove & replace existing windows with new marvin windows | $30,000 |
| Nov 21, 2000 | Completed final sign-off Feb 2001 | 2280 Pacific Av | replace bathroom tiles floor & wainscoat (non wet walls)Details
replace bathroom tiles floor & wainscoat (non wet walls) | $500 | |
| May 22, 2000 | Expired or cancelled expired Dec 2001 | 2280 Pacific Av | replace existing windows in existing openings using new vinyl framed-dual pane onesDetails
replace existing windows in existing openings using new vinyl framed-dual pane ones | $40,000 | |
| Apr 28, 2000 | Completed final sign-off Sep 2000 | 2280 Pacific Av | correct records,janitors unit to be legalized per compli 8/5/38 dph letter,final insp on 1938 violDetails
correct records,janitors unit to be legalized per compli 8/5/38 dph letter,final insp on 1938 viol |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.