Baa General Builder
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Mar 2026
- Last 24 months
- 6 permits filed
20 permits since 2000: 14 completed, 3 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | In progress issued Mar 2026 | 53 Florentine Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $3,000 |
| Dec 24, 2025 | Completed final sign-off Jan 2026 | 53 Florentine Av | to abate complaint 202548002 to remove unpermitted deck at rear of property.Details
to abate complaint 202548002 to remove unpermitted deck at rear of property. | $2,000 |
| Sep 15, 2025 | Completed final sign-off Oct 2025 | 2298 Mission St | build new shed for trash bin to comply with nov 202418598.Details
build new shed for trash bin to comply with nov 202418598. | $3,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 1940 Vallejo St | unit 3: remove ports of the drywall to install new electrical subpanel, install new p trap on 3 bathrooms sinks, replace old wire in conduit for outlets and lights.Details
unit 3: remove ports of the drywall to install new electrical subpanel, install new p trap on 3 bathrooms sinks, replace old wire in conduit for outlets and lights. | $800 |
| Jun 2, 2025 | Completed final sign-off Jun 2025 | 1274 35th Av | install new electric fire place. provide a new circuit. build a frame (12" x 60") bump out from existing wall.Details
install new electric fire place. provide a new circuit. build a frame (12" x 60") bump out from existing wall. | $3,000 |
| Apr 17, 2025 | Completed final sign-off May 2025 | 839 Noriega St | replace central heater; install new ducting in (e) locations., install 20' 3/4in gas line. install new electrical circuit. build framing to cover duct plus drywall.Details
replace central heater; install new ducting in (e) locations., install 20' 3/4in gas line. install new electrical circuit. build framing to cover duct plus drywall. | $8,000 |
| Aug 2, 2024 | Completed final sign-off Sep 2024 | 3002 Baker St | 2nd floor: bathroom addition 36sq ft approximately. demo interior wall non structural. update plumbing and install one new electrical circuit & ceiling lights & exhaust fancDetails
2nd floor: bathroom addition 36sq ft approximately. demo interior wall non structural. update plumbing and install one new electrical circuit & ceiling lights & exhaust fanc | $18,000 |
| Mar 11, 2024 | Completed final sign-off Oct 2024 | 1745 16th Av | siding replacement - 750 sf approx. not street visible.Details
siding replacement - 750 sf approx. not street visible. | $25,000 |
| Mar 1, 2024 | In progress filed Mar 2024, not yet issued | 2250 Mission St | build new 1/2 bath on (e) space, install new under ground plumbing insall new circuit new bath room will be built in the comic store in ground fl.Details
build new 1/2 bath on (e) space, install new under ground plumbing insall new circuit new bath room will be built in the comic store in ground fl. | $15,000 |
| Jul 17, 2023 | Completed final sign-off Dec 2024 | 2250 Mission St | comply w/nov 202302914 ; unit 101 -interior alterations to legalize the configuration of the ground floor dwelling unit to include 2 bedrooms, w full bathrooms, kitchen & living roomDetails
comply w/nov 202302914 ; unit 101 -interior alterations to legalize the configuration of the ground floor dwelling unit to include 2 bedrooms, w full bathrooms, kitchen & living room | $30,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 2250 Mission St | revision to bpa#202301270941: apply stucco around existing (5) windows located in unit#208.install sheetmetal on one existing skylight.Details
revision to bpa#202301270941: apply stucco around existing (5) windows located in unit#208.install sheetmetal on one existing skylight. | $800 |
| Jan 31, 2023 | Never finaled issued Feb 2023, no final | 2250 Mission St | to comply w/ abe program, abe # 202209094095Details
to comply w/ abe program, abe # 202209094095 | $1,000 |
| Jan 27, 2023 | Completed final sign-off Mar 2023 | 2250 Mission St | comply with 202290685 (outstanding items 8, 9, 11, 15, 16, 17). repair ceiling fixture near gr fl cover elec box. repair ceiling with fire rated sheet rock. demo water line out. side of rear building. door latches hallway doorsDetails
comply with 202290685 (outstanding items 8, 9, 11, 15, 16, 17). repair ceiling fixture near gr fl cover elec box. repair ceiling with fire rated sheet rock. demo water line out. side of rear building. door latches hallway doors | $7,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 10 Sumner St | legalize (e) dwelling unit, 10 sumner st apt #e per ordinance 43-14/planning code section 207.3. legalized unit include bedroom, living bathroom, & kitchen.Details
legalize (e) dwelling unit, 10 sumner st apt #e per ordinance 43-14/planning code section 207.3. legalized unit include bedroom, living bathroom, & kitchen. | $23,000 |
| Nov 21, 2022 | Never finaled issued Nov 2022, no final | 264 Collingwood St | bathroom remodel: update plumbing/install 2 new electrical circuit for bathroom only/bathroom fan.Details
bathroom remodel: update plumbing/install 2 new electrical circuit for bathroom only/bathroom fan. | $15,000 |
| Nov 18, 2022 | Completed final sign-off Jul 2023 | 2280 Pacific Av | unit #602: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
unit #602: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)3 & (k)5. | $18,000 |
| Nov 18, 2022 | Completed final sign-off Jul 2023 | 2280 Pacific Av | unit #302: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0 (k)3 & (k)5.Details
unit #302: 1 kitchen and 1 bathroom remodel. update plmg and electrical. replace outlet/install 8 led lights. cabinet installation. no new wall & no (e) wall relocation. plumbing fixture counts remain same. new lighting shall comply with cec 150.0 (k)3 & (k)5. | $18,000 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 2250 Mission St | to comply with nov 202289354 and to comply with 202290685 #6 and #14: plumbing bring discharged water line to outside of the boiler room. install sheet metal on interior of garbage room and apply sheet rock. update emergency lights/install self closing door system on door in common areas.Details
to comply with nov 202289354 and to comply with 202290685 #6 and #14: plumbing bring discharged water line to outside of the boiler room. install sheet metal on interior of garbage room and apply sheet rock. update emergency lights/install self closing door system on door in common areas. | $3,000 |
| Jun 15, 2022 | Completed final sign-off Aug 2022 | 2131 Grove St | one kitchen remodel in kind. remove existing cabinet, replace plug, sink.Details
one kitchen remodel in kind. remove existing cabinet, replace plug, sink. | $7,500 |
| Mar 23, 2022 | Completed final sign-off May 2023 | 3731 26th St | legalization of (e) dwelling unit in (e) single family dwelling. remodel (e) habital space on 1st floor (unit b) onl, including kitchen and bathroom. upgrade fire separation between units common at property line. new foundations throughout.Details
legalization of (e) dwelling unit in (e) single family dwelling. remodel (e) habital space on 1st floor (unit b) onl, including kitchen and bathroom. upgrade fire separation between units common at property line. new foundations throughout. | $12,000 |