Back to kitchen remodel contractors
B R J Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Jun 2026
- Last 24 months
- 4 permits filed
56 permits since 2000: 49 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 18 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Jan 2026 | 261 Onondaga Av | basic kitchen remodel in-kind. repair and replace cabinets, countertops, appliances, sink and lights.Details
basic kitchen remodel in-kind. repair and replace cabinets, countertops, appliances, sink and lights. | $30,000 |
| Feb 26, 2020 | Completed final sign-off May 2021 | 21 Bennington St | remodel (e) kitchen, 2 bathrooms & deck within (e) buidling envelopeDetails
remodel (e) kitchen, 2 bathrooms & deck within (e) buidling envelope | $265,000 |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 136 Lundys Ln | repalce finishes & fixtures in kind in kitchen & bathroom repalce furnace & water heater, lighting per cenc 150 (k) gas vent per cms802.6.6 combustion air per cmc ch7Details
repalce finishes & fixtures in kind in kitchen & bathroom repalce furnace & water heater, lighting per cenc 150 (k) gas vent per cms802.6.6 combustion air per cmc ch7 | $17,500 |
| Jan 29, 2015 | Completed final sign-off Nov 2015 | 2111 Franklin St | reconfigure non bearing walls at dining, kitchen, bedroom 3. install new cabinets, appliances at kitchen. new laundry install new outlets and light fixtures --work for this unit only no changes to doors and windows.Details
reconfigure non bearing walls at dining, kitchen, bedroom 3. install new cabinets, appliances at kitchen. new laundry install new outlets and light fixtures --work for this unit only no changes to doors and windows. | $25,000 |
| Nov 18, 2014 | Completed final sign-off Apr 2015 | 1566 Newcomb Av | kitchen remodel- new cabinets, appliances, 4 new windows & 4 new skylights in existing locations, new lighting in kitchen, living room, entry hall.Details
kitchen remodel- new cabinets, appliances, 4 new windows & 4 new skylights in existing locations, new lighting in kitchen, living room, entry hall. | $31,000 |
| Jan 13, 2014 | Completed final sign-off Apr 2014 | 100 Junipero Serra Bl | kitchen remodel, new cabinets and appliances. new recessed lights in library.Details
kitchen remodel, new cabinets and appliances. new recessed lights in library. | $46,000 |
| Dec 11, 2013 | Completed final sign-off Mar 2014 | 871 14th St | 4to comply with complaint #201042958 - remove non-permitted one kitchen return to one garage + storage space.Details
4to comply with complaint #201042958 - remove non-permitted one kitchen return to one garage + storage space. | $1,000 |
| Apr 25, 2012 | Completed final sign-off Jul 2012 | 1272 Treat Av | 2nd floor: remove portion of non-bearing wall at kitchen, replace kitchen cabinets, fixtures & appliances, remove sink & water heater at laundry. install water heater at west exterior wall. no work at 1st floor.Details
2nd floor: remove portion of non-bearing wall at kitchen, replace kitchen cabinets, fixtures & appliances, remove sink & water heater at laundry. install water heater at west exterior wall. no work at 1st floor. | $14,000 |
| Jan 25, 2012 | Completed final sign-off Mar 2012 | 999 Dolores St | kitchen-remove non bearing walls, install new cabinets, appliances, replace 1 (e) window. bathroom-replace vanity, tub/shower, add toilet. toilet room-add wall sinkDetails
kitchen-remove non bearing walls, install new cabinets, appliances, replace 1 (e) window. bathroom-replace vanity, tub/shower, add toilet. toilet room-add wall sink | $39,000 |
| Jun 10, 2011 | Completed final sign-off Aug 2011 | 1682 44th Av | remodel kitchen, remove non bearing walls and kitchen/dining area. reshape closet adjacent to kitchen, remove fireplace at living rm, repair flue chase hole at roofDetails
remodel kitchen, remove non bearing walls and kitchen/dining area. reshape closet adjacent to kitchen, remove fireplace at living rm, repair flue chase hole at roof | $18,000 |
| Sep 21, 2010 | Completed final sign-off Nov 2010 | 40 Lurline St | replace 10'6 wall with 4x8 beam at kitchen/dining area. revision to 201009030180Details
replace 10'6 wall with 4x8 beam at kitchen/dining area. revision to 201009030180 | $600 |
| Sep 3, 2010 | Completed final sign-off Nov 2010 | 40 Lurline St | replace ktichen cabinets & appliances, remoce non-bearing walls @ kitchen, install new lighting @ living rm, dining rm, & kitchen.Details
replace ktichen cabinets & appliances, remoce non-bearing walls @ kitchen, install new lighting @ living rm, dining rm, & kitchen. | $12,000 |
| Mar 18, 2010 | Completed final sign-off Jun 2010 | 20 Crestline Dr | unit #10 - replace kitchen cabinets, coutnertops & appliances in kind, remove (e) wall between kitchen & dining room (non-bearing), install recessed lights @ kitchen.Details
unit #10 - replace kitchen cabinets, coutnertops & appliances in kind, remove (e) wall between kitchen & dining room (non-bearing), install recessed lights @ kitchen. | $15,000 |
| Apr 22, 2009 | Completed final sign-off Jun 2009 | 465 Laidley St | revision to 200904146185, remove bearing wall at kitchen and install headerDetails
revision to 200904146185, remove bearing wall at kitchen and install header | $500 |
| Apr 14, 2009 | Completed final sign-off Jun 2009 | 465 Laidley St | kitchen remodel to include: new cabinets & appliances, new lighting, new windows to replace (e), remove non bearing wall between kitchen & dining. install pocket doors between kitchen & entryDetails
kitchen remodel to include: new cabinets & appliances, new lighting, new windows to replace (e), remove non bearing wall between kitchen & dining. install pocket doors between kitchen & entry | $26,000 |
| Apr 3, 2009 | Expired or cancelled expired May 2013 | 20 Crestline Dr | at unit #12: raise existing ceiling 2'-0" to 10'-0". extend rear deck to side property line, replace an existing rear-yard glazing, remodel existing interior including new kitchen & bathroom.Details
at unit #12: raise existing ceiling 2'-0" to 10'-0". extend rear deck to side property line, replace an existing rear-yard glazing, remodel existing interior including new kitchen & bathroom. | $174,500 |
| Nov 14, 2008 | Completed final sign-off Mar 2009 | 741 Lawton St | interior remodel of existing kitchen, replace all kitchen cabinets & appliances, removal of gyp board on first fl interior walls to allow for insulation, removal of existing fire place, removal & replace of existing flooring.Details
interior remodel of existing kitchen, replace all kitchen cabinets & appliances, removal of gyp board on first fl interior walls to allow for insulation, removal of existing fire place, removal & replace of existing flooring. | $45,000 |
| Nov 4, 2008 | Completed final sign-off Mar 2009 | 1604 Treat Av | remodel kitchen and dining room,fill in window at kitchen. all work at 2nd floorDetails
remodel kitchen and dining room,fill in window at kitchen. all work at 2nd floor | $23,000 |
| Jun 12, 2008 | Completed final sign-off Dec 2008 | 215 29th St | replace kitchen cabinets & appliances & build (n) closet @ entry.Details
replace kitchen cabinets & appliances & build (n) closet @ entry. | $22,000 |
| Feb 21, 2008 | Completed final sign-off May 2008 | 3856 26th St | kitchen renovation and add (n) 1/2 bath under existing exterior stairDetails
kitchen renovation and add (n) 1/2 bath under existing exterior stair | $38,000 |
| Nov 14, 2007 | Completed final sign-off Feb 2008 | 2426 17th Av | ground floor: replace (e) fireplace/water heater/furnace flues. 2nd floor: remove non-bearing walls in kitchen area. remove stairs in lightwell adj. to kitchen. enclose door opening between kitchen/lightwell. replace kitchen cabinets, lighting, appliances, replace (2) existing windows.Details
ground floor: replace (e) fireplace/water heater/furnace flues. 2nd floor: remove non-bearing walls in kitchen area. remove stairs in lightwell adj. to kitchen. enclose door opening between kitchen/lightwell. replace kitchen cabinets, lighting, appliances, replace (2) existing windows. | $26,500 |