Back to bathroom remodel contractors
B R J Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Jun 2026
- Last 24 months
- 4 permits filed
56 permits since 2000: 49 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2021 | Completed final sign-off May 2022 | 110 Junipero Serra Bl | remove (3) windows at rear of house master bath install (4) new wood windowsDetails
remove (3) windows at rear of house master bath install (4) new wood windows | $9,300 |
| Jun 14, 2021 | Completed final sign-off May 2022 | 110 Junipero Serra Bl | remodel master bath upstairs 110 sqft. new shower, tub, toilet, 2 lavs, vanity. in kind, no alteration of walls.Details
remodel master bath upstairs 110 sqft. new shower, tub, toilet, 2 lavs, vanity. in kind, no alteration of walls. | $23,000 |
| Feb 26, 2020 | Completed final sign-off May 2021 | 21 Bennington St | remodel (e) kitchen, 2 bathrooms & deck within (e) buidling envelopeDetails
remodel (e) kitchen, 2 bathrooms & deck within (e) buidling envelope | $265,000 |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 136 Lundys Ln | repalce finishes & fixtures in kind in kitchen & bathroom repalce furnace & water heater, lighting per cenc 150 (k) gas vent per cms802.6.6 combustion air per cmc ch7Details
repalce finishes & fixtures in kind in kitchen & bathroom repalce furnace & water heater, lighting per cenc 150 (k) gas vent per cms802.6.6 combustion air per cmc ch7 | $17,500 |
| Oct 4, 2013 | Completed final sign-off Oct 2013 | 3975 20th St | revision to pa201305156954. omit voluntary seismic strentghening at garage per sheets s1 & sheet s2.1. delte proposed skylight at third floor hall & delete built in cabinets. relocate skylight to bathroom.Details
revision to pa201305156954. omit voluntary seismic strentghening at garage per sheets s1 & sheet s2.1. delte proposed skylight at third floor hall & delete built in cabinets. relocate skylight to bathroom. | |
| May 15, 2013 | Completed final sign-off Oct 2013 | 3975 20th St | repartitioning & interior renovation of 3rd floor - bedrooms & bath; add bedroom storage lofts within existing attic space; add (4) new skylights. replace (e) 3rd floor front windows with new wood windows, detailing to match (e), relocate 3rd floor rear window. no change to (e) building envelope.Details
repartitioning & interior renovation of 3rd floor - bedrooms & bath; add bedroom storage lofts within existing attic space; add (4) new skylights. replace (e) 3rd floor front windows with new wood windows, detailing to match (e), relocate 3rd floor rear window. no change to (e) building envelope. | $65,000 |
| Dec 28, 2012 | Completed final sign-off Apr 2013 | 856 Church St | convert (e) storage space into bedroom w/closet & full bathroomDetails
convert (e) storage space into bedroom w/closet & full bathroom | $20,000 |
| Oct 23, 2012 | Completed final sign-off Oct 2012 | 1864 Church St | revision to appl #2012.1018.2403 - to exclude bathroom window replacement @1864 church st.Details
revision to appl #2012.1018.2403 - to exclude bathroom window replacement @1864 church st. | |
| Jan 25, 2012 | Completed final sign-off Mar 2012 | 999 Dolores St | kitchen-remove non bearing walls, install new cabinets, appliances, replace 1 (e) window. bathroom-replace vanity, tub/shower, add toilet. toilet room-add wall sinkDetails
kitchen-remove non bearing walls, install new cabinets, appliances, replace 1 (e) window. bathroom-replace vanity, tub/shower, add toilet. toilet room-add wall sink | $39,000 |
| Sep 6, 2011 | Completed final sign-off Dec 2011 | 465 Laidley St | reconfigure 3 rooms at 1st floor to new bedroom and bedroom/rec room including sink. replace shower at bath on 1st fl with tub shower. replace sliding door at south rear wall with french doorsDetails
reconfigure 3 rooms at 1st floor to new bedroom and bedroom/rec room including sink. replace shower at bath on 1st fl with tub shower. replace sliding door at south rear wall with french doors | $25,000 |
| Nov 16, 2010 | Completed final sign-off Feb 2011 | 3758 20th St | remodel bathroom in kind, no moving or adding wallsDetails
remodel bathroom in kind, no moving or adding walls | $27,000 |
| Apr 3, 2009 | Expired or cancelled expired May 2013 | 20 Crestline Dr | at unit #12: raise existing ceiling 2'-0" to 10'-0". extend rear deck to side property line, replace an existing rear-yard glazing, remodel existing interior including new kitchen & bathroom.Details
at unit #12: raise existing ceiling 2'-0" to 10'-0". extend rear deck to side property line, replace an existing rear-yard glazing, remodel existing interior including new kitchen & bathroom. | $174,500 |
| Jul 11, 2008 | Completed final sign-off Oct 2008 | 639 Carolina St | work only on #639 carolina st. bath 1-replace (e) toilet & vanity. no structural. replace (e) tub/shower w/tiled shower. bath 2-replace (e) tile shower &toilet. comply with his nov#200724153 with future permit.Details
work only on #639 carolina st. bath 1-replace (e) toilet & vanity. no structural. replace (e) tub/shower w/tiled shower. bath 2-replace (e) tile shower &toilet. comply with his nov#200724153 with future permit. | $15,500 |
| Feb 21, 2008 | Completed final sign-off May 2008 | 3856 26th St | kitchen renovation and add (n) 1/2 bath under existing exterior stairDetails
kitchen renovation and add (n) 1/2 bath under existing exterior stair | $38,000 |