B Power Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Dec 2014 to Oct 2017
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 8 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2017 | Completed final sign-off Jul 2017 | 65 Harold Av | comply with nov 201762911 replace deck and stairs at rear in kind on 2nd fl landing and stairs at 1st fl as original configuration.Details
comply with nov 201762911 replace deck and stairs at rear in kind on 2nd fl landing and stairs at 1st fl as original configuration. | $5,000 |
| Jan 18, 2017 | Completed final sign-off Mar 2018 | 539 Los Palmos Dr | basement: add family room, wet bar,1 bath, and patio at rear. 1st floor - add 3 bedrooms, 2 baths, 1 laundry, and cantilever deck at rear. lower 2nd floor: total remodel and new cantilever deck. new stairs to connect all 3 floors. enclose front entry. upper 2nd floor. new roof deckDetails
basement: add family room, wet bar,1 bath, and patio at rear. 1st floor - add 3 bedrooms, 2 baths, 1 laundry, and cantilever deck at rear. lower 2nd floor: total remodel and new cantilever deck. new stairs to connect all 3 floors. enclose front entry. upper 2nd floor. new roof deck | $180,000 |
| May 2, 2016 | Completed final sign-off Feb 2017 | 2023 18th Av | 1st floor: infill at rear. add (1) bedroom, 1 family room, 1 bathroom, 1 wet bar and laundry. 2nd floor: remodel kitchen, add half bath and new interior stairs to 1st floor. 3rd floor: remodel bathroom and add (1) bathroom. repair front windows. maher naDetails
1st floor: infill at rear. add (1) bedroom, 1 family room, 1 bathroom, 1 wet bar and laundry. 2nd floor: remodel kitchen, add half bath and new interior stairs to 1st floor. 3rd floor: remodel bathroom and add (1) bathroom. repair front windows. maher na | $115,000 |