Back to bathroom remodel contractors
B Power Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Dec 2014 to Oct 2017
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 71 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2017 | Completed final sign-off Mar 2018 | 539 Los Palmos Dr | basement: add family room, wet bar,1 bath, and patio at rear. 1st floor - add 3 bedrooms, 2 baths, 1 laundry, and cantilever deck at rear. lower 2nd floor: total remodel and new cantilever deck. new stairs to connect all 3 floors. enclose front entry. upper 2nd floor. new roof deckDetails
basement: add family room, wet bar,1 bath, and patio at rear. 1st floor - add 3 bedrooms, 2 baths, 1 laundry, and cantilever deck at rear. lower 2nd floor: total remodel and new cantilever deck. new stairs to connect all 3 floors. enclose front entry. upper 2nd floor. new roof deck | $180,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2018 | 323 Orizaba Av | 1st floor - add 1 family room, 1 bedroom, and 1 bath; 2nd floor, 2nd total remodel - relocate rooms per plans, new deck at rear. attic convert to living space. add 1 bedroom, 1 playroom, 1 bath, and 1 media. comply with complaint 201611172 & 201612452Details
1st floor - add 1 family room, 1 bedroom, and 1 bath; 2nd floor, 2nd total remodel - relocate rooms per plans, new deck at rear. attic convert to living space. add 1 bedroom, 1 playroom, 1 bath, and 1 media. comply with complaint 201611172 & 201612452 | $160,000 |
| May 2, 2016 | Completed final sign-off Feb 2017 | 2023 18th Av | 1st floor: infill at rear. add (1) bedroom, 1 family room, 1 bathroom, 1 wet bar and laundry. 2nd floor: remodel kitchen, add half bath and new interior stairs to 1st floor. 3rd floor: remodel bathroom and add (1) bathroom. repair front windows. maher naDetails
1st floor: infill at rear. add (1) bedroom, 1 family room, 1 bathroom, 1 wet bar and laundry. 2nd floor: remodel kitchen, add half bath and new interior stairs to 1st floor. 3rd floor: remodel bathroom and add (1) bathroom. repair front windows. maher na | $115,000 |
| Mar 9, 2015 | Completed final sign-off Dec 2016 | 2221 31st Av | legalize in-law unit as per ordinance 43-14. 2 new bedrooms, 1 new kitchen & 1 new bath.Details
legalize in-law unit as per ordinance 43-14. 2 new bedrooms, 1 new kitchen & 1 new bath. | $7,000 |
| Dec 30, 2014 | Completed final sign-off Nov 2017 | 100 Scotia Av | 2 story rear addition including 2 bedrooms, 1 bath & family room @ 2nd floor. 2 bedrooms, 1 bath & social room @ 1st floor per plan. upgrade (e) toilet rooms to full bathroom @ 1st floor within (e) building.Details
2 story rear addition including 2 bedrooms, 1 bath & family room @ 2nd floor. 2 bedrooms, 1 bath & social room @ 1st floor per plan. upgrade (e) toilet rooms to full bathroom @ 1st floor within (e) building. | $100,000 |