Back to kitchen remodel contractors
B Park Construction & Painting Co.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to May 2018
- Last 24 months
- 0 permits filed
29 permits since 2000: 26 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2018 | Completed final sign-off Aug 2018 | 2106 Divisadero St | non- structural remodel, paint all interior rooms, replace master bedrom cabinets, add light fixture to ceiling in living room(s) repalce laundry room door replace broken window pane in bathroom and replace bathroom fixtures, vanity, replace kitchen cabinets and fixtures, patch ceiling holes,Details
non- structural remodel, paint all interior rooms, replace master bedrom cabinets, add light fixture to ceiling in living room(s) repalce laundry room door replace broken window pane in bathroom and replace bathroom fixtures, vanity, replace kitchen cabinets and fixtures, patch ceiling holes, | $32,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2016 | 360 Lily St | remove 4' pocket door and open wall approx 10' long, lower bathroom and hallway ceiling, install 6" duct pipe to outside wall for kitchen hood, install bath fan, add 7 down lights.Details
remove 4' pocket door and open wall approx 10' long, lower bathroom and hallway ceiling, install 6" duct pipe to outside wall for kitchen hood, install bath fan, add 7 down lights. | $9,500 |
| Apr 30, 2015 | Completed final sign-off Apr 2016 | 71 San Jacinto Wy | remodel kitchen and 3 bathrooms, change lighting, replace 5 windows, not visable from street, enlarge closet at master bedroom. not visible from street.Details
remodel kitchen and 3 bathrooms, change lighting, replace 5 windows, not visable from street, enlarge closet at master bedroom. not visible from street. | $120,000 |
| Dec 23, 2013 | Completed final sign-off May 2014 | 718 Pine St | remodel kitchen, change lighting, install 1 window. frame the wall at existing sunroom. al work at 2nd flDetails
remodel kitchen, change lighting, install 1 window. frame the wall at existing sunroom. al work at 2nd fl | $24,000 |
| Apr 13, 2009 | Completed final sign-off Jul 2009 | 2784 Bush St | work at 2784 bush st.: remodel kitchen & bath include plumbing, electric tile, sheetrock, cabient & wall.Details
work at 2784 bush st.: remodel kitchen & bath include plumbing, electric tile, sheetrock, cabient & wall. | $36,000 |
| Apr 23, 2008 | Completed final sign-off Jul 2008 | 180 Beaumont Av | kitchen and bathroom remodel, sheetrock, plumbing, electrical, tile and painting, cabinets install.Details
kitchen and bathroom remodel, sheetrock, plumbing, electrical, tile and painting, cabinets install. | $46,000 |
| Dec 3, 2002 | Completed final sign-off Apr 2003 | 201 Magellan Av | kitchen remodel,remove cabinet,sink,countertop,plaster & install new cabinet,insulation,sheetrock,tiDetails
kitchen remodel,remove cabinet,sink,countertop,plaster & install new cabinet,insulation,sheetrock,ti | $16,000 |
| May 17, 2001 | Completed final sign-off Nov 2001 | 303 Greenwich St | removal of rot and ex floor in bath enlarge kitchen as per owners plans no structural work wash/dryeDetails
removal of rot and ex floor in bath enlarge kitchen as per owners plans no structural work wash/drye | $35,000 |