Back to bathroom remodel contractors
B Park Construction & Painting Co.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to May 2018
- Last 24 months
- 0 permits filed
29 permits since 2000: 26 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2018 | Completed final sign-off Aug 2018 | 2106 Divisadero St | non- structural remodel, paint all interior rooms, replace master bedrom cabinets, add light fixture to ceiling in living room(s) repalce laundry room door replace broken window pane in bathroom and replace bathroom fixtures, vanity, replace kitchen cabinets and fixtures, patch ceiling holes,Details
non- structural remodel, paint all interior rooms, replace master bedrom cabinets, add light fixture to ceiling in living room(s) repalce laundry room door replace broken window pane in bathroom and replace bathroom fixtures, vanity, replace kitchen cabinets and fixtures, patch ceiling holes, | $32,000 |
| Mar 2, 2017 | Completed final sign-off Sep 2017 | 1232 Masonic Av | remodel 2 bathrooms, add one powder room, enlarged closet. relocate back door and window. remove 8' walls.Details
remodel 2 bathrooms, add one powder room, enlarged closet. relocate back door and window. remove 8' walls. | $58,000 |
| Jul 15, 2016 | Completed final sign-off Feb 2017 | 3050 Turk Bl | convert (e) storage space in ground floor into living space including one bedroom & a half bath (296 sf). voluntary seismic upgrade to ground floor.Details
convert (e) storage space in ground floor into living space including one bedroom & a half bath (296 sf). voluntary seismic upgrade to ground floor. | $12,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2016 | 360 Lily St | remove 4' pocket door and open wall approx 10' long, lower bathroom and hallway ceiling, install 6" duct pipe to outside wall for kitchen hood, install bath fan, add 7 down lights.Details
remove 4' pocket door and open wall approx 10' long, lower bathroom and hallway ceiling, install 6" duct pipe to outside wall for kitchen hood, install bath fan, add 7 down lights. | $9,500 |
| Feb 4, 2016 | Completed final sign-off Jun 2016 | 142 Cerritos Av | master bathroom remodel include shower, sink & toilet. tile floor & walls, sheetrock, plumbing & electrical works. mew moldings at door.Details
master bathroom remodel include shower, sink & toilet. tile floor & walls, sheetrock, plumbing & electrical works. mew moldings at door. | $12,000 |
| Apr 30, 2015 | Completed final sign-off Apr 2016 | 71 San Jacinto Wy | remodel kitchen and 3 bathrooms, change lighting, replace 5 windows, not visable from street, enlarge closet at master bedroom. not visible from street.Details
remodel kitchen and 3 bathrooms, change lighting, replace 5 windows, not visable from street, enlarge closet at master bedroom. not visible from street. | $120,000 |
| Sep 14, 2012 | Completed final sign-off Oct 2012 | 3050 Turk Bl | bathroom remodel - install sheetrock, tile, plumbing and electric work. relocate sink only. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors cef 150(k)10Details
bathroom remodel - install sheetrock, tile, plumbing and electric work. relocate sink only. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors cef 150(k)10 | $8,600 |
| Jul 13, 2012 | Completed final sign-off Oct 2012 | 431 Jersey St | remodel bathroom, high efficacy lighting or occupancy sensor. new sheetrock, tile, change light and bathroom fixtures.Details
remodel bathroom, high efficacy lighting or occupancy sensor. new sheetrock, tile, change light and bathroom fixtures. | $12,500 |
| Apr 13, 2009 | Completed final sign-off Jul 2009 | 2784 Bush St | work at 2784 bush st.: remodel kitchen & bath include plumbing, electric tile, sheetrock, cabient & wall.Details
work at 2784 bush st.: remodel kitchen & bath include plumbing, electric tile, sheetrock, cabient & wall. | $36,000 |
| Apr 23, 2008 | Completed final sign-off Jul 2008 | 180 Beaumont Av | kitchen and bathroom remodel, sheetrock, plumbing, electrical, tile and painting, cabinets install.Details
kitchen and bathroom remodel, sheetrock, plumbing, electrical, tile and painting, cabinets install. | $46,000 |
| Nov 16, 2007 | Completed final sign-off Jan 2008 | 571 14th Av | work @ unit# 571 only. bathroom remodel. sheetrock, plumbing, tile work. (e) light fixture to remain. no structural work.Details
work @ unit# 571 only. bathroom remodel. sheetrock, plumbing, tile work. (e) light fixture to remain. no structural work. | $8,500 |
| May 17, 2001 | Completed final sign-off Nov 2001 | 303 Greenwich St | removal of rot and ex floor in bath enlarge kitchen as per owners plans no structural work wash/dryeDetails
removal of rot and ex floor in bath enlarge kitchen as per owners plans no structural work wash/drye | $35,000 |