Back to kitchen remodel contractors
B N Builders Inc
- Based in
- San Mateo
- On San Francisco permits
- Feb 2007 to Nov 2026
- Last 24 months
- 29 permits filed
36 permits since 2000: 19 completed, 15 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
2 kitchen remodel permits: 2 in progress. Typically 88 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Nov 2026 | 2 Harrison St | new grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen equipment is part of separate permit. accessibility deferred due to hvac work only.Details
new grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen equipment is part of separate permit. accessibility deferred due to hvac work only. | $44,730 |
| Dec 30, 2025 | In progress issued Apr 2026 | 2 Harrison St | 2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph.Details
2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph. | $500,000 |