B C W Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Dec 2019
- Last 24 months
- 0 permits filed
33 permits since 2000: 28 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 2 never finaled. Typically 0 days from filing to permit and 372 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 1225 Mendell St | comply with nov 201929561. repair front exterior entrance terrazo stairs less than 10 percent. repair drainage pipe at rear of bulding below window.Details
comply with nov 201929561. repair front exterior entrance terrazo stairs less than 10 percent. repair drainage pipe at rear of bulding below window. | $3,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2017 | 806 39th Av | 1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell.Details
1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell. | $70,000 |
| Dec 7, 2015 | Completed final sign-off Dec 2015 | 930 Huron Av | stucco and dry rot repair at front below window sills and side of stair.Details
stucco and dry rot repair at front below window sills and side of stair. | $1,000 |
| Oct 14, 2014 | Never finaled issued Nov 2014, no final | 930 Huron Av | 1st flr remodel: add one new guest room, one family room, one bathroom, one office room, 2 storage. 2nd flr: add a rear new deck with a stairway.Details
1st flr remodel: add one new guest room, one family room, one bathroom, one office room, 2 storage. 2nd flr: add a rear new deck with a stairway. | $40,000 |
| Jul 1, 2014 | Completed final sign-off Jan 2015 | 151 Tucker Av | replace 4 windows in kind at the back of the house, 3 windows at the left side, repair stair less 50% on the left side of the house, repair damage concrete int he garage, remove tile & hood at the kitchen & bath 2 fl. all repairs in kind.Details
replace 4 windows in kind at the back of the house, 3 windows at the left side, repair stair less 50% on the left side of the house, repair damage concrete int he garage, remove tile & hood at the kitchen & bath 2 fl. all repairs in kind. | $4,500 |
| Apr 9, 2014 | Completed final sign-off Oct 2015 | 570 28th Av | remodel basement to create new guest w/a new spiral stair connecting to upper floor. remodel 1st floor (e) family room, legalize bathroom & add new stair connecting to 2nd floor.Details
remodel basement to create new guest w/a new spiral stair connecting to upper floor. remodel 1st floor (e) family room, legalize bathroom & add new stair connecting to 2nd floor. | $25,000 |