Back to bathroom remodel contractors
B C W Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Dec 2019
- Last 24 months
- 0 permits filed
33 permits since 2000: 28 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2017 | Completed final sign-off Jan 2018 | 1415 28th Av | install (n) hardwood floor. remodel existing kitchen and bath, same location. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
install (n) hardwood floor. remodel existing kitchen and bath, same location. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $12,000 |
| Mar 18, 2016 | Completed final sign-off Jun 2016 | 101 Tiffany Av | bathroom remodeling. no structure changeDetails
bathroom remodeling. no structure change | $5,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2017 | 806 39th Av | 1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell.Details
1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell. | $70,000 |
| May 27, 2015 | Completed final sign-off Jul 2015 | 1711 26th Av | replace kitchen cabinets, replace kitchen & bath floor tiles,repl bathrm & bedrms doors and remove carpet, install hardwood floor at the 2nd flr.Details
replace kitchen cabinets, replace kitchen & bath floor tiles,repl bathrm & bedrms doors and remove carpet, install hardwood floor at the 2nd flr. | $8,000 |
| Nov 14, 2014 | Completed final sign-off Sep 2015 | 285 Paris St | remodel basement, bedrooms and bathroom per plan. 1st fl: remodel and upgrade per plan. 2nd fl: remodel and add a (n) bathroom per plan. 9 windows replacement. dh in front for the house.Details
remodel basement, bedrooms and bathroom per plan. 1st fl: remodel and upgrade per plan. 2nd fl: remodel and add a (n) bathroom per plan. 9 windows replacement. dh in front for the house. | $55,000 |
| Oct 14, 2014 | Never finaled issued Nov 2014, no final | 930 Huron Av | 1st flr remodel: add one new guest room, one family room, one bathroom, one office room, 2 storage. 2nd flr: add a rear new deck with a stairway.Details
1st flr remodel: add one new guest room, one family room, one bathroom, one office room, 2 storage. 2nd flr: add a rear new deck with a stairway. | $40,000 |
| Sep 24, 2014 | Completed final sign-off Feb 2016 | 2226 40th Av | comply w/complaint #201490571: legalize existing wood deck at back of house, to provide 1-hr fire rated wall & guardrailing. legalize 1st floor bedrooms & bathroom per plan.Details
comply w/complaint #201490571: legalize existing wood deck at back of house, to provide 1-hr fire rated wall & guardrailing. legalize 1st floor bedrooms & bathroom per plan. | $38,000 |
| Jul 1, 2014 | Completed final sign-off Jan 2015 | 151 Tucker Av | replace 4 windows in kind at the back of the house, 3 windows at the left side, repair stair less 50% on the left side of the house, repair damage concrete int he garage, remove tile & hood at the kitchen & bath 2 fl. all repairs in kind.Details
replace 4 windows in kind at the back of the house, 3 windows at the left side, repair stair less 50% on the left side of the house, repair damage concrete int he garage, remove tile & hood at the kitchen & bath 2 fl. all repairs in kind. | $4,500 |
| May 21, 2014 | Completed final sign-off Nov 2014 | 1776 Sloat Bl | remodel existing family room, half bathroom with new bedrooms & (n) bathroom per plan.Details
remodel existing family room, half bathroom with new bedrooms & (n) bathroom per plan. | $35,000 |
| Apr 9, 2014 | Completed final sign-off Oct 2015 | 570 28th Av | remodel basement to create new guest w/a new spiral stair connecting to upper floor. remodel 1st floor (e) family room, legalize bathroom & add new stair connecting to 2nd floor.Details
remodel basement to create new guest w/a new spiral stair connecting to upper floor. remodel 1st floor (e) family room, legalize bathroom & add new stair connecting to 2nd floor. | $25,000 |
| Jul 25, 2013 | Completed final sign-off Jan 2014 | 525 Garfield St | ground floor remodel. remodel extg garage to one car garage, one storage, one new playroom, and one new bathroom.Details
ground floor remodel. remodel extg garage to one car garage, one storage, one new playroom, and one new bathroom. | $28,000 |
| Mar 25, 2013 | Expired or cancelled expired Feb 2016 | 682 Madrid St | basement interior remodel. add a family room and a full bath per plan.Details
basement interior remodel. add a family room and a full bath per plan. | $16,800 |
| Jun 22, 2012 | Completed final sign-off Sep 2012 | 38 Pope St | to comply with complaint #201123801 and #201129662 per plan. front building legalize to new bedroom and bathroom. rear building revert back to storage room; remove illegal unit in the backDetails
to comply with complaint #201123801 and #201129662 per plan. front building legalize to new bedroom and bathroom. rear building revert back to storage room; remove illegal unit in the back | $10,000 |
| Apr 30, 2012 | Completed final sign-off Mar 2014 | 432 Holyoke St | 2-story rear addition. 1st floor: (n) play room & bath. 2nd floor: (n) bedroom & baths.Details
2-story rear addition. 1st floor: (n) play room & bath. 2nd floor: (n) bedroom & baths. | $165,000 |
| Jun 21, 2011 | Completed final sign-off Sep 2013 | 103 Dwight St | addition on side of existing property, 1/fl new garage. 2/fl (n) kitchen, living room, dining room and bathroom. 3/fl bedrooms, and baths.Details
addition on side of existing property, 1/fl new garage. 2/fl (n) kitchen, living room, dining room and bathroom. 3/fl bedrooms, and baths. | $180,000 |