Back to kitchen remodel contractors
B Birmingham Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Jan 2025
- Last 24 months
- 2 permits filed
99 permits since 2000: 82 completed, 1 in progress, 12 never finaled, 4 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 never finaled. Typically 4 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2024 | Completed final sign-off Jun 2025 | 3212 Baker St | kitchen remodel (n) millwork lighting wall removal and association workDetails
kitchen remodel (n) millwork lighting wall removal and association work | $110,000 |
| Apr 24, 2023 | Completed final sign-off Sep 2023 | 2505 Noriega St | t.i. voluntary upgrade to ada & interior improvements: 1-bath to make accessible, upgrade of finishes, energy efficient upgrades of lighting, addition of tenant improvment kitchenette (inside), removal of safety hazard (ramp w/no guardrail) & interior renovated for new office.Details
t.i. voluntary upgrade to ada & interior improvements: 1-bath to make accessible, upgrade of finishes, energy efficient upgrades of lighting, addition of tenant improvment kitchenette (inside), removal of safety hazard (ramp w/no guardrail) & interior renovated for new office. | $103,000 |
| Feb 15, 2022 | Completed final sign-off Jun 2022 | 1726 39th Av | replace (e) kitchen cabinets and counter top update electricalDetails
replace (e) kitchen cabinets and counter top update electrical | $25,000 |
| Mar 25, 2015 | Completed final sign-off Mar 2017 | 187 Precita Av | rebuild rear yard decks & stairs. expand garage/upgrade driveway. renovate 2nd/3rd floor unit kitchens & add bathroms. add solar panels. integrate new basement & first flor bedrom suites & second floor flat using new interior stair. revision to application 201103172302-s to correct scope in dbi recDetails
rebuild rear yard decks & stairs. expand garage/upgrade driveway. renovate 2nd/3rd floor unit kitchens & add bathroms. add solar panels. integrate new basement & first flor bedrom suites & second floor flat using new interior stair. revision to application 201103172302-s to correct scope in dbi rec | |
| Jan 18, 2013 | Completed final sign-off Feb 2014 | 138 Alpine Tr | interior remodel on 3rd fl, including reconfigure of the kitchen, bathroom (n) solar panels & (n) two skylights on roof. interior of 1st fl relocate kitchen to 2nd fl. & convert to a wet bar, reconfigure bathroom & add stairways from 1st to 2nd fl. (n) wood hot tub on 2nd fl. 2 rooms combined onDetails
interior remodel on 3rd fl, including reconfigure of the kitchen, bathroom (n) solar panels & (n) two skylights on roof. interior of 1st fl relocate kitchen to 2nd fl. & convert to a wet bar, reconfigure bathroom & add stairways from 1st to 2nd fl. (n) wood hot tub on 2nd fl. 2 rooms combined on | $250,000 |
| May 30, 2012 | Completed final sign-off Jan 2013 | 181 Granville Wy | replace kitchen cabinets, renovate 1 full bathroom. lighting will comply with cec150(k)8 for kitchen and cec150(k)10 for bathroom.Details
replace kitchen cabinets, renovate 1 full bathroom. lighting will comply with cec150(k)8 for kitchen and cec150(k)10 for bathroom. | $20,000 |
| May 15, 2012 | Completed final sign-off Oct 2012 | 5 Burnett North Av | work is @ unit # 2: replace (e) kitchen cabinets with new cabinets. replace counter tops. ada lighting.Details
work is @ unit # 2: replace (e) kitchen cabinets with new cabinets. replace counter tops. ada lighting. | $10,000 |
| Jan 10, 2012 | Completed final sign-off Jan 2012 | 1 Rockaway Av | install exhaust system for the kitchenDetails
install exhaust system for the kitchen | $2,000 |
| Jul 22, 2011 | Completed final sign-off Jan 2012 | 1 Rockaway Av | church hall kitchen upgrade & remodel: replace single sink w/ triple compartment sink; add prep & handwash sink; replace dishwasher; relocate gas range & replace exhaust hood w/ code compliant hood w/ fire suppression, widen service counter window, lower counter to ada height; install floor drain &Details
church hall kitchen upgrade & remodel: replace single sink w/ triple compartment sink; add prep & handwash sink; replace dishwasher; relocate gas range & replace exhaust hood w/ code compliant hood w/ fire suppression, widen service counter window, lower counter to ada height; install floor drain & | $30,000 |
| Jun 3, 2011 | Completed final sign-off May 2012 | 594 Arkansas St | new wd deck off kitchen, new windows, doors & siding @west facade, remodel (e) 2nd fl kitchen & bedrm, repl (e) stairs, fire sepration of garage from conditioned spaces. excavation of rear portions of 1st fl crawl space to aloow 8ft min ceiling hgt. new ext rear door landing w/retaining walls & landDetails
new wd deck off kitchen, new windows, doors & siding @west facade, remodel (e) 2nd fl kitchen & bedrm, repl (e) stairs, fire sepration of garage from conditioned spaces. excavation of rear portions of 1st fl crawl space to aloow 8ft min ceiling hgt. new ext rear door landing w/retaining walls & land | $175,000 |
| Jun 1, 2004 | Never finaled issued Jul 2004, no final | 380 Roosevelt Wy | rev to ceiling framing in kitchen to allow clear upper windows.rev to 985149 & 200206128835.Details
rev to ceiling framing in kitchen to allow clear upper windows.rev to 985149 & 200206128835. | |
| Aug 21, 2003 | Completed final sign-off Dec 2003 | 463 Arlington St | remove and replace kitchen, upgrade electrical service. install additional lighting and outlets. remDetails
remove and replace kitchen, upgrade electrical service. install additional lighting and outlets. rem | $10,000 |