Back to bathroom remodel contractors
B Birmingham Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Jan 2025
- Last 24 months
- 2 permits filed
99 permits since 2000: 82 completed, 1 in progress, 12 never finaled, 4 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 11 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2023 | Completed final sign-off Sep 2023 | 2505 Noriega St | t.i. voluntary upgrade to ada & interior improvements: 1-bath to make accessible, upgrade of finishes, energy efficient upgrades of lighting, addition of tenant improvment kitchenette (inside), removal of safety hazard (ramp w/no guardrail) & interior renovated for new office.Details
t.i. voluntary upgrade to ada & interior improvements: 1-bath to make accessible, upgrade of finishes, energy efficient upgrades of lighting, addition of tenant improvment kitchenette (inside), removal of safety hazard (ramp w/no guardrail) & interior renovated for new office. | $103,000 |
| Apr 6, 2022 | Completed final sign-off Nov 2022 | 38 Idora Av | to comply with nov #202288715. renovating extg bathroom. expand closet. all non bearing walls. no work to exterior of bldg.Details
to comply with nov #202288715. renovating extg bathroom. expand closet. all non bearing walls. no work to exterior of bldg. | $20,000 |
| Dec 30, 2021 | Completed final sign-off Mar 2023 | 62 Allston Wy | to remodel (e) master bedroom, (e) bathroom and half bath at 2/f. replace (e) front windows.Details
to remodel (e) master bedroom, (e) bathroom and half bath at 2/f. replace (e) front windows. | $40,000 |
| Aug 9, 2018 | Completed final sign-off Dec 2018 | 21 Allston Wy | replace bathroom fixtures, new tile, new vanity, cainbet, approx 40sf.Details
replace bathroom fixtures, new tile, new vanity, cainbet, approx 40sf. | $5,000 |
| Jul 23, 2018 | Completed final sign-off Aug 2019 | 1310 Church St | newly created habitable space 987sf (780sf calc) w/in (e) storage.new bedroom,closet,laundry,bathroom,great room w wetbar,new stair to upper floor.r/r (e) decking and exterior stair to yard. new landscaping under sep permit, elec, mech sep permit.Details
newly created habitable space 987sf (780sf calc) w/in (e) storage.new bedroom,closet,laundry,bathroom,great room w wetbar,new stair to upper floor.r/r (e) decking and exterior stair to yard. new landscaping under sep permit, elec, mech sep permit. | $120,000 |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 146 Taraval St | new master bath on extg second floor. new master closet. new doors in extg bedroom on 2nd floor. remove extg rear yard terracing and provide grade level deck off of bedrooms at 2nd floor.Details
new master bath on extg second floor. new master closet. new doors in extg bedroom on 2nd floor. remove extg rear yard terracing and provide grade level deck off of bedrooms at 2nd floor. | $70,000 |
| Jun 20, 2013 | Completed final sign-off Dec 2013 | 940 Laguna Honda Bl | furr over cmu walls with metal framing and drywall. replace cabinetry and add tbar ceiling in classroom. convert 2 stalls in boys bath and girls bath to single accessible stall and add ceiling bathDetails
furr over cmu walls with metal framing and drywall. replace cabinetry and add tbar ceiling in classroom. convert 2 stalls in boys bath and girls bath to single accessible stall and add ceiling bath | $60,000 |
| May 6, 2013 | Completed final sign-off Feb 2014 | 138 Alpine Tr | new foundation to replace extg below gym and bath and more. revision to app#201301188345Details
new foundation to replace extg below gym and bath and more. revision to app#201301188345 | $9,000 |
| Jan 18, 2013 | Completed final sign-off Feb 2014 | 138 Alpine Tr | interior remodel on 3rd fl, including reconfigure of the kitchen, bathroom (n) solar panels & (n) two skylights on roof. interior of 1st fl relocate kitchen to 2nd fl. & convert to a wet bar, reconfigure bathroom & add stairways from 1st to 2nd fl. (n) wood hot tub on 2nd fl. 2 rooms combined onDetails
interior remodel on 3rd fl, including reconfigure of the kitchen, bathroom (n) solar panels & (n) two skylights on roof. interior of 1st fl relocate kitchen to 2nd fl. & convert to a wet bar, reconfigure bathroom & add stairways from 1st to 2nd fl. (n) wood hot tub on 2nd fl. 2 rooms combined on | $250,000 |
| May 30, 2012 | Completed final sign-off Jan 2013 | 181 Granville Wy | replace kitchen cabinets, renovate 1 full bathroom. lighting will comply with cec150(k)8 for kitchen and cec150(k)10 for bathroom.Details
replace kitchen cabinets, renovate 1 full bathroom. lighting will comply with cec150(k)8 for kitchen and cec150(k)10 for bathroom. | $20,000 |
| Jun 17, 2005 | Expired or cancelled expired Dec 2010 | 4150 17th St | retile full bathroom. move electrical & plumbing fixturesDetails
retile full bathroom. move electrical & plumbing fixtures | $4,000 |