Back to kitchen remodel contractors
Aurora Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Aug 2026
- Last 24 months
- 17 permits filed
168 permits since 2000: 149 completed, 4 in progress, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
65 kitchen remodel permits: 57 completed, 2 in progress, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2026 | In progress issued May 2026 | 232 28th St | 1st floor (ground floor) unit. remodel kitchen in kind. replace cabinetry & appliances, elec & plumbing fixtures & finishes. sink & stove to remain in (e) location.Details
1st floor (ground floor) unit. remodel kitchen in kind. replace cabinetry & appliances, elec & plumbing fixtures & finishes. sink & stove to remain in (e) location. | $50,000 |
| May 6, 2026 | Expired or cancelled cancelled May 2026 | 1201 California St | unit 1103- revision to 202604240080: move kitchen sink to counter across from e) locationDetails
unit 1103- revision to 202604240080: move kitchen sink to counter across from e) location | |
| Apr 24, 2026 | Completed final sign-off Sep 2026 | 1201 California St | kitchen remodel, relocate refrigerator and sink. remove partiton wall, replace finishes, replace closet doors.Details
kitchen remodel, relocate refrigerator and sink. remove partiton wall, replace finishes, replace closet doors. | $50,000 |
| Sep 26, 2025 | Completed final sign-off Aug 2026 | 501 28th St | unit #505 kitchen & 1 full bath remodel. unit #501 kitchen & 2 full bath remodel and deck repair less than 50%Details
unit #505 kitchen & 1 full bath remodel. unit #501 kitchen & 2 full bath remodel and deck repair less than 50% | $85,000 |
| Dec 18, 2024 | Expired or cancelled expired Aug 2026 | 21 Vicksburg St | remove post between kitchen and sunporch. replace (3) exterior doors & (7) windows at the rear (not visible from street). new tankless water heater. new central split heat pumpDetails
remove post between kitchen and sunporch. replace (3) exterior doors & (7) windows at the rear (not visible from street). new tankless water heater. new central split heat pump | $85,000 |
| Dec 17, 2024 | Completed final sign-off Mar 2025 | 130 Palm Av | unit #1: kitchen remodel. replace plumbing fixtures and appliances in kind in same location. replace cabinets counters and tile.Details
unit #1: kitchen remodel. replace plumbing fixtures and appliances in kind in same location. replace cabinets counters and tile. | $50,000 |
| Oct 28, 2024 | Expired or cancelled expired Jul 2026 | 21 Vicksburg St | kitchen remodel demo and replace finishes plumbing fixtures and appliances to remain n same location, no wall demolition or construction.Details
kitchen remodel demo and replace finishes plumbing fixtures and appliances to remain n same location, no wall demolition or construction. | $60,000 |
| Aug 12, 2024 | Completed final sign-off Sep 2025 | 124 Vasquez Av | 2nd fl: 1 bathroom remodel in kind. kitchen remodel & 2 new windows, new skylights & suntubeDetails
2nd fl: 1 bathroom remodel in kind. kitchen remodel & 2 new windows, new skylights & suntube | $30,000 |
| Jul 9, 2024 | Completed final sign-off Dec 2024 | 5177 Diamond Heights Bl | apt #214: kitchen remodel, fixtures remain in existing locations with new finishes. add laundry to closet next to entry door.Details
apt #214: kitchen remodel, fixtures remain in existing locations with new finishes. add laundry to closet next to entry door. | $50,000 |
| Jun 26, 2024 | Completed final sign-off Jun 2025 | 617 Castro St | interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courtsDetails
interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courts | $100,000 |
| May 7, 2024 | Completed final sign-off Aug 2024 | 451 03rd Av | replace partial kitchen cabinets + countertop, replace sink, appliances and lighting.Details
replace partial kitchen cabinets + countertop, replace sink, appliances and lighting. | $40,000 |
| Dec 6, 2023 | Completed final sign-off Aug 2024 | 14 Vicksburg St | (e) kitchen & full bathroom renovation. replace 1 side door & add 1 skylight (not visible from st)Details
(e) kitchen & full bathroom renovation. replace 1 side door & add 1 skylight (not visible from st) | $85,000 |
| Jun 20, 2023 | Completed final sign-off Sep 2023 | 95 Cameo Wy | revision to pa 202304246358 remove bearing wall between kitchen and dining roomDetails
revision to pa 202304246358 remove bearing wall between kitchen and dining room | $1,000 |
| May 11, 2023 | Completed final sign-off Oct 2023 | 1301 41st Av | kitchen remodel - in kind - fixtures to remain in same location. new finishes throughout.Details
kitchen remodel - in kind - fixtures to remain in same location. new finishes throughout. | $45,000 |
| Apr 24, 2023 | Completed final sign-off Sep 2023 | 95 Cameo Wy | remodel kitchen, all fixtures and appliances to remain in same location. new flooring, cabinets, counter tops.Details
remodel kitchen, all fixtures and appliances to remain in same location. new flooring, cabinets, counter tops. | $50,000 |
| Nov 18, 2022 | Completed final sign-off Feb 2024 | 550 12th Av | add bedroom at 1st flr. new partition walls at 1st floor. relocate laundry and install one half bath. kitchen renovation. existing full bath renovation. install (n) full bath at 3rd floor. new rear deck. install (4) exterior doors and (8) windows, not visible to the street. partial fnd replace & sogDetails
add bedroom at 1st flr. new partition walls at 1st floor. relocate laundry and install one half bath. kitchen renovation. existing full bath renovation. install (n) full bath at 3rd floor. new rear deck. install (4) exterior doors and (8) windows, not visible to the street. partial fnd replace & sog | $90,000 |
| Oct 24, 2022 | Expired or cancelled cancelled Nov 2022 | 550 12th Av | kitchen remodel in kind: new finishes.Details
kitchen remodel in kind: new finishes. | $50,000 |
| Oct 11, 2022 | Completed final sign-off Aug 2024 | 1854 Grove St | remodel kitchen & laundry room including minor demo of non-structural partition & terra cotta flue & gas line. upgrade electrical from knob & tube to support compliant lighting & gfci, underfloor heating pad & electric dryer & range. reloate plumbing & door opening. replace window sash.Details
remodel kitchen & laundry room including minor demo of non-structural partition & terra cotta flue & gas line. upgrade electrical from knob & tube to support compliant lighting & gfci, underfloor heating pad & electric dryer & range. reloate plumbing & door opening. replace window sash. | $60,000 |
| Mar 18, 2022 | Completed final sign-off Aug 2023 | 1201 California St | unit 306: interior renovation including kitchen and bath. remove interior partition walls, no change in building envelope.Details
unit 306: interior renovation including kitchen and bath. remove interior partition walls, no change in building envelope. | $80,000 |
| Oct 15, 2021 | Completed final sign-off Nov 2022 | 848 Brussels St | kitchen remodel, fixtures to remain in same location. replace back kitchen door and 2 windows in kind, replace siding on back of house including 2 windows and 1 sliding door. replace furnace. max u-factor = 0.30Details
kitchen remodel, fixtures to remain in same location. replace back kitchen door and 2 windows in kind, replace siding on back of house including 2 windows and 1 sliding door. replace furnace. max u-factor = 0.30 | $45,000 |
| Jul 9, 2021 | Completed final sign-off Nov 2021 | 734 14th St | bath and kitchen remodel. replace finishes, all fixtures to remain in existing locations.Details
bath and kitchen remodel. replace finishes, all fixtures to remain in existing locations. | $30,000 |
| May 13, 2021 | Completed final sign-off Jun 2022 | 1201 California St | #101: scope includes renovation & reconfiguration of the existing kitchen & bath areas at unit 101 with opening the kitchen area to the living/dining area.Details
#101: scope includes renovation & reconfiguration of the existing kitchen & bath areas at unit 101 with opening the kitchen area to the living/dining area. | $35,000 |
| Jan 22, 2021 | Completed final sign-off Jan 2024 | 615 Bosworth St | rear addition to extend existing kitchen at #617, and infill below at #615. install two new exterior doors and one window (not visible to the street). new rear deck 180s.f.Details
rear addition to extend existing kitchen at #617, and infill below at #615. install two new exterior doors and one window (not visible to the street). new rear deck 180s.f. | $42,000 |
| Oct 16, 2020 | Completed final sign-off Mar 2022 | 3481 19th St | new ada restroom & entry door power operation at commercial pace w/tenant improvements for a private professional office, waiting area & break rooml & renovations to adjacent apartment 3481a w/infill at (e) lightwell, new kitchen & bath.Details
new ada restroom & entry door power operation at commercial pace w/tenant improvements for a private professional office, waiting area & break rooml & renovations to adjacent apartment 3481a w/infill at (e) lightwell, new kitchen & bath. | $75,000 |
| Oct 6, 2020 | Completed final sign-off Apr 2021 | 1460 Alabama St | kitchen remodel- replace all interior finishes, fixtures, cabinetry, appliances & lighting. expand (e) openings from kitchen to adjacent laundry & pantry and dining rooms.Details
kitchen remodel- replace all interior finishes, fixtures, cabinetry, appliances & lighting. expand (e) openings from kitchen to adjacent laundry & pantry and dining rooms. | $55,000 |
| Sep 20, 2020 | Completed final sign-off Jan 2024 | 617 Bosworth St | rev to pa202006269184: relocate laundry, remove wall between kitchen & living room. remove flat ceiling at kitchen/livingroom and vault within (e) roof envelope. 2 new skylights.Details
rev to pa202006269184: relocate laundry, remove wall between kitchen & living room. remove flat ceiling at kitchen/livingroom and vault within (e) roof envelope. 2 new skylights. | $25,000 |
| Aug 26, 2020 | Completed final sign-off Jul 2024 | 1358 Palou Av | new adu studio unit above (e) garage per ord# 95-17. new kitchen & bath, (3) exterior doors,(1) window and (1) skyline. main residence, relocated entry stairs.Details
new adu studio unit above (e) garage per ord# 95-17. new kitchen & bath, (3) exterior doors,(1) window and (1) skyline. main residence, relocated entry stairs. | $140,000 |
| Jun 26, 2020 | Completed final sign-off Nov 2022 | 617 Bosworth St | kitchen & bath remodel, replace bath windows in kind at rear side of building.Details
kitchen & bath remodel, replace bath windows in kind at rear side of building. | $34,000 |
| Jan 10, 2020 | Completed final sign-off Jun 2020 | 143 02nd Av | kichen and bath remodel; replace cabinets, finisher, appliances, plumbing fixtures and lighting. plumbing fixtures to remain in same location. bathroom 5'x8', kitchen 8'x8'Details
kichen and bath remodel; replace cabinets, finisher, appliances, plumbing fixtures and lighting. plumbing fixtures to remain in same location. bathroom 5'x8', kitchen 8'x8' | $30,000 |
| Sep 23, 2019 | Completed final sign-off Jan 2022 | 3271 20th St | relocate 1 (e) door & window at back wall of house. install plumbing and electrical for new washer and dryer in (e) closet. repair opening belwer 9e0 skylight in kitchen.Details
relocate 1 (e) door & window at back wall of house. install plumbing and electrical for new washer and dryer in (e) closet. repair opening belwer 9e0 skylight in kitchen. | $40,000 |
| Aug 13, 2019 | In progress issued Apr 2024 | 1358 Palou Av | horizontal addition. 1-story rear addition including kitchen renovation at (n) location, (n) stair to rear yard. install (1) exterior door, (4) windows & (1) skylight (not visible to street).Details
horizontal addition. 1-story rear addition including kitchen renovation at (n) location, (n) stair to rear yard. install (1) exterior door, (4) windows & (1) skylight (not visible to street). | $60,000 |
| Feb 26, 2019 | Completed final sign-off Aug 2020 | 3331 Kirkham St | expand conditioned space to 1st flr to incl (n) bedroom, bath and fam room. renovate (e) kitchen & bath at 2nd flr.Details
expand conditioned space to 1st flr to incl (n) bedroom, bath and fam room. renovate (e) kitchen & bath at 2nd flr. | $60,000 |
| Dec 20, 2018 | Completed final sign-off Jun 2019 | 149 Alhambra St | kitchen and bath renovation , new cabinets, fixtures tileDetails
kitchen and bath renovation , new cabinets, fixtures tile | $30,000 |
| Oct 30, 2018 | Completed final sign-off Aug 2019 | 4001 Folsom St | remodel 2 (e) bathrms & 1 kitchen. all plumbing fixts to remain in same location. bathtub in lower bathrm convert to shower. new lighting & finishes kitchen (100 sq) bathrooms (40 sq ea) trhoughout.Details
remodel 2 (e) bathrms & 1 kitchen. all plumbing fixts to remain in same location. bathtub in lower bathrm convert to shower. new lighting & finishes kitchen (100 sq) bathrooms (40 sq ea) trhoughout. | $49,362 |
| Aug 9, 2018 | Completed final sign-off Dec 2019 | 1631 Hyde St | relocate/remodel kitchen, remodel e lower flr bathroom, new wood flooring throughout,, new window at dinin rm (rear-facing), new window on north side at liv rm. new lighting, new furnace. no work visible from streetDetails
relocate/remodel kitchen, remodel e lower flr bathroom, new wood flooring throughout,, new window at dinin rm (rear-facing), new window on north side at liv rm. new lighting, new furnace. no work visible from street | $75,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 522 12th Av | remodle kitchen: remove finishes surfaces down to framing. all plumbing fixtures to remain in same location. new electrival,cingets, rile, sheetrock etc.Details
remodle kitchen: remove finishes surfaces down to framing. all plumbing fixtures to remain in same location. new electrival,cingets, rile, sheetrock etc. | $25,000 |
| Feb 2, 2018 | Completed final sign-off Feb 2020 | 50 07th Av | convert 1st fl storage to living space, 254 sf, 1 story residential elevator from 1st to 2nd fl. kitchen renovation. add 1 new full bath, renovate 1 e full bath. relocate laundry, replace 13 windows, 5 new windows, 2 doors. not visible from streetDetails
convert 1st fl storage to living space, 254 sf, 1 story residential elevator from 1st to 2nd fl. kitchen renovation. add 1 new full bath, renovate 1 e full bath. relocate laundry, replace 13 windows, 5 new windows, 2 doors. not visible from street | $160,000 |
| Jun 22, 2017 | Completed final sign-off Feb 2018 | 2261 Clay St | kitchen remodel. replace (e) cabinets, replace (e) floor/new cooktop oven, new sink and faucet. new ceiling cans. all other appliances remain. no change in kitchen layout.Details
kitchen remodel. replace (e) cabinets, replace (e) floor/new cooktop oven, new sink and faucet. new ceiling cans. all other appliances remain. no change in kitchen layout. | $30,000 |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 2100 Pacific Av | remodel kitchen and bathroom. all fixtures to remain in same location. new finishes throughout - sheetrock, tile , hardwood flooring, cabinetry, new fixtures and appliances.Details
remodel kitchen and bathroom. all fixtures to remain in same location. new finishes throughout - sheetrock, tile , hardwood flooring, cabinetry, new fixtures and appliances. | $85,000 |
| Mar 30, 2017 | Completed final sign-off Jul 2017 | 332 College Av | kitchen remodel, infill window at kitchen sink, replace e baywindow in kitchen in kind, side of house, not visible from street, relocate kitchen sink, demo wall at dining room and add support beamDetails
kitchen remodel, infill window at kitchen sink, replace e baywindow in kitchen in kind, side of house, not visible from street, relocate kitchen sink, demo wall at dining room and add support beam | $45,000 |
| Mar 2, 2017 | Completed final sign-off Jan 2018 | 24 Brompton Av | remodel bath and kitchen upstairs, replace 3 extg skylights, add 2 new skylights in dining room and stairwell, add family room with bath and a laundry room at garage room at garage level. front window replace in kind same size, opening and operation wood.Details
remodel bath and kitchen upstairs, replace 3 extg skylights, add 2 new skylights in dining room and stairwell, add family room with bath and a laundry room at garage room at garage level. front window replace in kind same size, opening and operation wood. | $90,000 |
| Mar 2, 2017 | Completed final sign-off Jul 2017 | 149 Alhambra St | remodel kitchen and bath, new finishes to remain in extg location. add toilet to bathroom. move kitchen/hallway opening. n/a for maherDetails
remodel kitchen and bath, new finishes to remain in extg location. add toilet to bathroom. move kitchen/hallway opening. n/a for maher | $60,000 |
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 1717 Mason St | #7- bath and kitchen remodel, new finishes, electrical and plumbing fixtures.Details
#7- bath and kitchen remodel, new finishes, electrical and plumbing fixtures. | $35,000 |
| Sep 29, 2016 | Completed final sign-off May 2017 | 881 Wisconsin St | kitchen and bath remodl. move bath wall and open counter area between kitchen and dining room. new finishes, elec and plumbDetails
kitchen and bath remodl. move bath wall and open counter area between kitchen and dining room. new finishes, elec and plumb | $60,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 2987 Mission St | kitchen remodel-replace existing cabinets & finishes all fixtures in same location.Details
kitchen remodel-replace existing cabinets & finishes all fixtures in same location. | $20,000 |
| May 23, 2016 | Completed final sign-off Nov 2016 | 1701 Page St | kitchen remodel. relocate sink and appliances, modify lighting, bath remodel, extend kitchen/bath wall, relocate exit to back stairs, resize and replace existing windows, install new shower, tub, tile, lighting, raise floor in plane with kitchenDetails
kitchen remodel. relocate sink and appliances, modify lighting, bath remodel, extend kitchen/bath wall, relocate exit to back stairs, resize and replace existing windows, install new shower, tub, tile, lighting, raise floor in plane with kitchen | $58,000 |
| Mar 21, 2016 | Completed final sign-off Jul 2016 | 739 Shrader St | remodel (e) 1/2 bath to full bathroom with shower, move toilet. remove partition wall and move doorway. add pantry to (e) kitchen refirdgerator nicheDetails
remodel (e) 1/2 bath to full bathroom with shower, move toilet. remove partition wall and move doorway. add pantry to (e) kitchen refirdgerator niche | $30,000 |
| Nov 2, 2015 | Completed final sign-off Mar 2016 | 514 47th Av | kitchen remodel. replace (2) existing windows in lightwellDetails
kitchen remodel. replace (2) existing windows in lightwell | $30,000 |
| Sep 30, 2015 | Completed final sign-off Aug 2017 | 1134 Stanyan St | kitchen remodel. replace windows and siding at lightwell. strengthen gr fl walls at lightwellDetails
kitchen remodel. replace windows and siding at lightwell. strengthen gr fl walls at lightwell | $80,000 |
| Jun 10, 2015 | Completed final sign-off Apr 2016 | 754 22nd Av | install(1)skylight(5'6"from property line),install(2)skylights 4'from pl w/fire rated parapet,reframe 1 kitchen and 1 bath wibdow for new window installation.Details
install(1)skylight(5'6"from property line),install(2)skylights 4'from pl w/fire rated parapet,reframe 1 kitchen and 1 bath wibdow for new window installation. | $3,200 |
| Mar 10, 2015 | Completed final sign-off Apr 2016 | 754 22nd Av | comply with nov 201531641: remodel kitchen and (e) bathroom. add bathroom at back bedroom, remove partition walls and frame new space, change bathroom, plumbing fixture locations. remove ceiling tiles in 2 rooms & cover with sheetrock. 2 skylights under seperate permitDetails
comply with nov 201531641: remodel kitchen and (e) bathroom. add bathroom at back bedroom, remove partition walls and frame new space, change bathroom, plumbing fixture locations. remove ceiling tiles in 2 rooms & cover with sheetrock. 2 skylights under seperate permit | $100,000 |
| Nov 19, 2014 | Completed final sign-off Jun 2015 | 74 Pond St | kitchen remodel - remove cabinetry, add plumbing & electrical for new appliances, sheetrockDetails
kitchen remodel - remove cabinetry, add plumbing & electrical for new appliances, sheetrock | $24,000 |
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 255 Laguna St | remodel kitchen & bath, new cabinetry, appliances & fixtures in kitchen. existing ceiling & lighting to remain. bath - install new fixtures & shower, resize (1) exisitng lightwell, window & install for shower. u = 0.32 max.Details
remodel kitchen & bath, new cabinetry, appliances & fixtures in kitchen. existing ceiling & lighting to remain. bath - install new fixtures & shower, resize (1) exisitng lightwell, window & install for shower. u = 0.32 max. | $12,000 |
| Mar 18, 2014 | Completed final sign-off May 2014 | 46 Marietta Dr | replace existing front windows in kind, relocate bath & kitchen windows (1 each) & replace tempered glass for shower window.Details
replace existing front windows in kind, relocate bath & kitchen windows (1 each) & replace tempered glass for shower window. | $5,000 |
| Mar 18, 2014 | Completed final sign-off May 2014 | 46 Marietta Dr | kitchen & bath remodel, gut existing & install new plumbing, electrical, sheetrock, cabinetry, flooring, appliances. install new shower to replace bath.Details
kitchen & bath remodel, gut existing & install new plumbing, electrical, sheetrock, cabinetry, flooring, appliances. install new shower to replace bath. | $60,000 |
| Jan 16, 2014 | Completed final sign-off Apr 2014 | 4185 Cesar Chavez St | remodel (e) kitchen, new cabinets, plumbing & electrical fixtures - existing ceiling & ceiling lighting to remain, no change in (e) layout & openings, new under cabinet led lighting will be added above counter top.Details
remodel (e) kitchen, new cabinets, plumbing & electrical fixtures - existing ceiling & ceiling lighting to remain, no change in (e) layout & openings, new under cabinet led lighting will be added above counter top. | $25,000 |
| Jan 2, 2014 | Completed final sign-off Mar 2014 | 1545 Broadway | unit 108. kitchen remodel - replace existing cabinets, plumbing & electrical fixtures, appliances and sheetrock with new in kind. all existing walls to reamin, no new walls, no change to current layout.Details
unit 108. kitchen remodel - replace existing cabinets, plumbing & electrical fixtures, appliances and sheetrock with new in kind. all existing walls to reamin, no new walls, no change to current layout. | $18,000 |
| Sep 24, 2009 | Completed final sign-off Dec 2009 | 2343 37th Av | remodel (e) bathroom, relocate kitchen & convert (e) kitchen space to home office. add two skylights as shown. all work at second floor.Details
remodel (e) bathroom, relocate kitchen & convert (e) kitchen space to home office. add two skylights as shown. all work at second floor. | $24,000 |
| Jan 20, 2009 | Completed final sign-off Mar 2009 | 1642 21st Av | kitchen remodel, new cabinets, tile floor, electrical + plumbing fixtures, sheetrock paint.Details
kitchen remodel, new cabinets, tile floor, electrical + plumbing fixtures, sheetrock paint. | $30,000 |
| Dec 30, 2008 | Completed final sign-off Mar 2009 | 2825 26th St | bathroom remodel/new plumbing + electrical fixtures sheetrock, tile no structural work. kitchen upgrade- replace cabinets + appliances in existing location new tile foor no walls will be opened. no structural work.Details
bathroom remodel/new plumbing + electrical fixtures sheetrock, tile no structural work. kitchen upgrade- replace cabinets + appliances in existing location new tile foor no walls will be opened. no structural work. | $20,000 |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 859 37th Av | remodel 2 kitchens,2 full bathrooms&1 half bath.replace cabinets, fixtures,sheetrock,sinks,lighting, floor covering&wall tiles in bathroom.reloc 2 water heater&2 furnaces to grd flr.comply w/3r report #5309. new light high effic or manuel on auto off switch fr laundry rm to garage&attic.Details
remodel 2 kitchens,2 full bathrooms&1 half bath.replace cabinets, fixtures,sheetrock,sinks,lighting, floor covering&wall tiles in bathroom.reloc 2 water heater&2 furnaces to grd flr.comply w/3r report #5309. new light high effic or manuel on auto off switch fr laundry rm to garage&attic. | $80,000 |
| May 22, 2008 | Completed final sign-off Jan 2009 | 1 Nordhoff St | kitchen remodel on the 2nd floor and replace ex. windows at kitchen with 5 new ones. all new windows are facing the street.Details
kitchen remodel on the 2nd floor and replace ex. windows at kitchen with 5 new ones. all new windows are facing the street. | $15,000 |
| Feb 1, 2008 | Completed final sign-off Feb 2008 | 3948 Folsom St | revision to pa# 2007/07/12/6633 to delete proposed kitchen and bathroom remodel on the 2nd floor.Details
revision to pa# 2007/07/12/6633 to delete proposed kitchen and bathroom remodel on the 2nd floor. | |
| Nov 28, 2007 | Completed final sign-off Jun 2008 | 50 Collingwood St | remedel kitchen, bath & a new bath & closet addition on 2nd floor, all within existing footprint.Details
remedel kitchen, bath & a new bath & closet addition on 2nd floor, all within existing footprint. | $48,737 |
| Nov 26, 2007 | Completed final sign-off Jan 2008 | 2134 Grove St | remodel bathroom, move plumbing fixtures, add lighting tile sheetrock. add lighting and some insulated sheetrock to kitchen ceiling. (1) window replacement in kitchen @ lightwell.Details
remodel bathroom, move plumbing fixtures, add lighting tile sheetrock. add lighting and some insulated sheetrock to kitchen ceiling. (1) window replacement in kitchen @ lightwell. | $15,000 |