Back to bathroom remodel contractors
Aurora Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Aug 2026
- Last 24 months
- 17 permits filed
168 permits since 2000: 150 completed, 3 in progress, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
70 bathroom remodel permits: 65 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 1301 41st Av | 2nd floor bath remodel: replace tub/shower with shower, move toilet, new tile and fixturesDetails
2nd floor bath remodel: replace tub/shower with shower, move toilet, new tile and fixtures | $48,000 |
| Sep 26, 2025 | Completed final sign-off Aug 2026 | 501 28th St | unit #505 kitchen & 1 full bath remodel. unit #501 kitchen & 2 full bath remodel and deck repair less than 50%Details
unit #505 kitchen & 1 full bath remodel. unit #501 kitchen & 2 full bath remodel and deck repair less than 50% | $85,000 |
| Apr 4, 2025 | Completed final sign-off Dec 2025 | 2955 Jackson St | reconfiguration of the 3rd fl to create a new bedroom, relocate existing bath, renovate primary bath and renovate ground floor bathDetails
reconfiguration of the 3rd fl to create a new bedroom, relocate existing bath, renovate primary bath and renovate ground floor bath | $185,000 |
| Feb 5, 2025 | Expired or cancelled expired Aug 2026 | 21 Vicksburg St | enlarge exiting 1st floor bath, new fixture and tile, relocate laundry.Details
enlarge exiting 1st floor bath, new fixture and tile, relocate laundry. | $68,000 |
| Jan 22, 2025 | Expired or cancelled expired Jul 2026 | 21 Vicksburg St | remodel 2/f half bath. replace toliet and sink in same location. install new lighting. replace finishes and install wood flooring.Details
remodel 2/f half bath. replace toliet and sink in same location. install new lighting. replace finishes and install wood flooring. | $35,000 |
| Aug 12, 2024 | Completed final sign-off Sep 2025 | 124 Vasquez Av | 2nd fl: 1 bathroom remodel in kind. kitchen remodel & 2 new windows, new skylights & suntubeDetails
2nd fl: 1 bathroom remodel in kind. kitchen remodel & 2 new windows, new skylights & suntube | $30,000 |
| Jun 26, 2024 | Completed final sign-off Jun 2025 | 617 Castro St | interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courtsDetails
interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courts | $100,000 |
| Dec 6, 2023 | Completed final sign-off Aug 2024 | 14 Vicksburg St | (e) kitchen & full bathroom renovation. replace 1 side door & add 1 skylight (not visible from st)Details
(e) kitchen & full bathroom renovation. replace 1 side door & add 1 skylight (not visible from st) | $85,000 |
| Feb 15, 2023 | Completed final sign-off Jun 2023 | 1201 California St | #1103 bathroom remodel relocate shower and vanity remove partition wallDetails
#1103 bathroom remodel relocate shower and vanity remove partition wall | $45,000 |
| Jan 27, 2023 | Completed final sign-off Mar 2023 | 3271 20th St | revision to bpa#201911207745, reduction in of scope of work. deleted: new siding face of house, new entry doors, new fin & handrail @ entry stairs, floor drain in breezeway, raised ceiling 2/f bath, new trim on face of house. deleted work clouded on plans. no structural changes.Details
revision to bpa#201911207745, reduction in of scope of work. deleted: new siding face of house, new entry doors, new fin & handrail @ entry stairs, floor drain in breezeway, raised ceiling 2/f bath, new trim on face of house. deleted work clouded on plans. no structural changes. | |
| Nov 18, 2022 | Completed final sign-off Feb 2024 | 550 12th Av | add bedroom at 1st flr. new partition walls at 1st floor. relocate laundry and install one half bath. kitchen renovation. existing full bath renovation. install (n) full bath at 3rd floor. new rear deck. install (4) exterior doors and (8) windows, not visible to the street. partial fnd replace & sogDetails
add bedroom at 1st flr. new partition walls at 1st floor. relocate laundry and install one half bath. kitchen renovation. existing full bath renovation. install (n) full bath at 3rd floor. new rear deck. install (4) exterior doors and (8) windows, not visible to the street. partial fnd replace & sog | $90,000 |
| Nov 2, 2022 | Completed final sign-off Mar 2023 | 739 Shrader St | revision to bpa#202209283321, remove (e) wall between (2) bathrooms, move toilet & tub to new locations, install (2) vanity sinks. shower to remain. new finishes throughout. no additional plumbing fixtures.Details
revision to bpa#202209283321, remove (e) wall between (2) bathrooms, move toilet & tub to new locations, install (2) vanity sinks. shower to remain. new finishes throughout. no additional plumbing fixtures. | $15,000 |
| Sep 28, 2022 | Completed final sign-off Aug 2023 | 739 Shrader St | master bath remodel, in kind. fixtures to remain in same location. replace finishes.Details
master bath remodel, in kind. fixtures to remain in same location. replace finishes. | $50,000 |
| Mar 18, 2022 | Completed final sign-off Aug 2023 | 1201 California St | unit 306: interior renovation including kitchen and bath. remove interior partition walls, no change in building envelope.Details
unit 306: interior renovation including kitchen and bath. remove interior partition walls, no change in building envelope. | $80,000 |
| Jul 9, 2021 | Completed final sign-off Nov 2021 | 734 14th St | bath and kitchen remodel. replace finishes, all fixtures to remain in existing locations.Details
bath and kitchen remodel. replace finishes, all fixtures to remain in existing locations. | $30,000 |
| Jun 25, 2021 | Completed final sign-off Dec 2021 | 4152 25th St | one bathroom remodel - replace all bathroom finishes, plumbing fixtures to remain in same locations.Details
one bathroom remodel - replace all bathroom finishes, plumbing fixtures to remain in same locations. | $35,000 |
| May 13, 2021 | Completed final sign-off Jun 2022 | 1201 California St | #101: scope includes renovation & reconfiguration of the existing kitchen & bath areas at unit 101 with opening the kitchen area to the living/dining area.Details
#101: scope includes renovation & reconfiguration of the existing kitchen & bath areas at unit 101 with opening the kitchen area to the living/dining area. | $35,000 |
| Apr 1, 2021 | Completed final sign-off Aug 2021 | 1835 Golden Gate Av | replace finishes & fixtures in bathroom. install exhaust fan.Details
replace finishes & fixtures in bathroom. install exhaust fan. | $28,000 |
| Feb 4, 2021 | Completed final sign-off Jan 2022 | 447 03rd Av | 1st fl expansion of (e) habitable space. infill under (e) 2nd fl room above, and (n) full bath. 2nd fl relocate stairs down and relocate of half bath.Details
1st fl expansion of (e) habitable space. infill under (e) 2nd fl room above, and (n) full bath. 2nd fl relocate stairs down and relocate of half bath. | $60,000 |
| Oct 16, 2020 | Completed final sign-off Mar 2022 | 3481 19th St | new ada restroom & entry door power operation at commercial pace w/tenant improvements for a private professional office, waiting area & break rooml & renovations to adjacent apartment 3481a w/infill at (e) lightwell, new kitchen & bath.Details
new ada restroom & entry door power operation at commercial pace w/tenant improvements for a private professional office, waiting area & break rooml & renovations to adjacent apartment 3481a w/infill at (e) lightwell, new kitchen & bath. | $75,000 |
| Aug 26, 2020 | Completed final sign-off Jul 2024 | 1358 Palou Av | new adu studio unit above (e) garage per ord# 95-17. new kitchen & bath, (3) exterior doors,(1) window and (1) skyline. main residence, relocated entry stairs.Details
new adu studio unit above (e) garage per ord# 95-17. new kitchen & bath, (3) exterior doors,(1) window and (1) skyline. main residence, relocated entry stairs. | $140,000 |
| Jun 26, 2020 | Completed final sign-off Nov 2022 | 617 Bosworth St | kitchen & bath remodel, replace bath windows in kind at rear side of building.Details
kitchen & bath remodel, replace bath windows in kind at rear side of building. | $34,000 |
| Feb 25, 2020 | Completed final sign-off Jun 2020 | 143 02nd Av | revision to pa 2020-0110-1627 move gas range and add toilet to bathroom - no sprinkler system in buildingDetails
revision to pa 2020-0110-1627 move gas range and add toilet to bathroom - no sprinkler system in building | $31,336 |
| Jan 10, 2020 | Completed final sign-off Jun 2020 | 143 02nd Av | kichen and bath remodel; replace cabinets, finisher, appliances, plumbing fixtures and lighting. plumbing fixtures to remain in same location. bathroom 5'x8', kitchen 8'x8'Details
kichen and bath remodel; replace cabinets, finisher, appliances, plumbing fixtures and lighting. plumbing fixtures to remain in same location. bathroom 5'x8', kitchen 8'x8' | $30,000 |
| Jul 18, 2019 | Completed final sign-off Feb 2020 | 543 Rhode Island St | existing full bath renovation including infill of one story lightell, install 1 new skylightDetails
existing full bath renovation including infill of one story lightell, install 1 new skylight | $45,000 |
| Mar 22, 2019 | Completed final sign-off Jul 2019 | 121 Jordan Av | bathroom remodel. new fixtures to remain in existing locations. no change in walls and openings layout.Details
bathroom remodel. new fixtures to remain in existing locations. no change in walls and openings layout. | $28,000 |
| Feb 26, 2019 | Completed final sign-off Aug 2020 | 3331 Kirkham St | expand conditioned space to 1st flr to incl (n) bedroom, bath and fam room. renovate (e) kitchen & bath at 2nd flr.Details
expand conditioned space to 1st flr to incl (n) bedroom, bath and fam room. renovate (e) kitchen & bath at 2nd flr. | $60,000 |
| Dec 21, 2018 | Completed final sign-off Feb 2019 | 153 Alpine Tr | remodel 1 bathroom, repair dryrot, fixtures to remain in existing location.Details
remodel 1 bathroom, repair dryrot, fixtures to remain in existing location. | $45,000 |
| Dec 20, 2018 | Completed final sign-off Jun 2019 | 149 Alhambra St | kitchen and bath renovation , new cabinets, fixtures tileDetails
kitchen and bath renovation , new cabinets, fixtures tile | $30,000 |
| Dec 7, 2018 | Completed final sign-off Dec 2019 | 1631 Hyde St | revision to app#201808096943. remove post at lower floor in master bedroom and install new beam. install new concrete footing at east side. remodel 2nd floor bathroom.Details
revision to app#201808096943. remove post at lower floor in master bedroom and install new beam. install new concrete footing at east side. remodel 2nd floor bathroom. | $15,000 |
| Oct 30, 2018 | Completed final sign-off Aug 2019 | 4001 Folsom St | remodel 2 (e) bathrms & 1 kitchen. all plumbing fixts to remain in same location. bathtub in lower bathrm convert to shower. new lighting & finishes kitchen (100 sq) bathrooms (40 sq ea) trhoughout.Details
remodel 2 (e) bathrms & 1 kitchen. all plumbing fixts to remain in same location. bathtub in lower bathrm convert to shower. new lighting & finishes kitchen (100 sq) bathrooms (40 sq ea) trhoughout. | $49,362 |
| Aug 20, 2018 | Completed final sign-off Nov 2018 | 118 Palm Av | 1 bath remodel - gut bathroom to shuds, replace fixtures in existing locations. tile and electrical fixtures.Details
1 bath remodel - gut bathroom to shuds, replace fixtures in existing locations. tile and electrical fixtures. | $20,000 |
| Aug 20, 2018 | Completed final sign-off Nov 2018 | 40 Palm Av | 1 bath remodel - gut bathroom to shuds, replace fixtures in existing locations. tile and electrical fixtures.Details
1 bath remodel - gut bathroom to shuds, replace fixtures in existing locations. tile and electrical fixtures. | $20,000 |
| Aug 9, 2018 | Completed final sign-off Dec 2019 | 1631 Hyde St | relocate/remodel kitchen, remodel e lower flr bathroom, new wood flooring throughout,, new window at dinin rm (rear-facing), new window on north side at liv rm. new lighting, new furnace. no work visible from streetDetails
relocate/remodel kitchen, remodel e lower flr bathroom, new wood flooring throughout,, new window at dinin rm (rear-facing), new window on north side at liv rm. new lighting, new furnace. no work visible from street | $75,000 |
| Feb 2, 2018 | Completed final sign-off Feb 2020 | 50 07th Av | convert 1st fl storage to living space, 254 sf, 1 story residential elevator from 1st to 2nd fl. kitchen renovation. add 1 new full bath, renovate 1 e full bath. relocate laundry, replace 13 windows, 5 new windows, 2 doors. not visible from streetDetails
convert 1st fl storage to living space, 254 sf, 1 story residential elevator from 1st to 2nd fl. kitchen renovation. add 1 new full bath, renovate 1 e full bath. relocate laundry, replace 13 windows, 5 new windows, 2 doors. not visible from street | $160,000 |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 2100 Pacific Av | remodel kitchen and bathroom. all fixtures to remain in same location. new finishes throughout - sheetrock, tile , hardwood flooring, cabinetry, new fixtures and appliances.Details
remodel kitchen and bathroom. all fixtures to remain in same location. new finishes throughout - sheetrock, tile , hardwood flooring, cabinetry, new fixtures and appliances. | $85,000 |
| Mar 2, 2017 | Completed final sign-off Jul 2017 | 149 Alhambra St | remodel kitchen and bath, new finishes to remain in extg location. add toilet to bathroom. move kitchen/hallway opening. n/a for maherDetails
remodel kitchen and bath, new finishes to remain in extg location. add toilet to bathroom. move kitchen/hallway opening. n/a for maher | $60,000 |
| Mar 2, 2017 | Completed final sign-off Jan 2018 | 24 Brompton Av | remodel bath and kitchen upstairs, replace 3 extg skylights, add 2 new skylights in dining room and stairwell, add family room with bath and a laundry room at garage room at garage level. front window replace in kind same size, opening and operation wood.Details
remodel bath and kitchen upstairs, replace 3 extg skylights, add 2 new skylights in dining room and stairwell, add family room with bath and a laundry room at garage room at garage level. front window replace in kind same size, opening and operation wood. | $90,000 |
| Jan 13, 2017 | Completed final sign-off Apr 2017 | 121 Jordan Av | bathroom shower replacement and upgrades on finishes. replace (e) window in shower in-kind. (not visiable from street).Details
bathroom shower replacement and upgrades on finishes. replace (e) window in shower in-kind. (not visiable from street). | $40,000 |
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 1717 Mason St | #7- bath and kitchen remodel, new finishes, electrical and plumbing fixtures.Details
#7- bath and kitchen remodel, new finishes, electrical and plumbing fixtures. | $35,000 |
| Oct 3, 2016 | Completed final sign-off Dec 2016 | 2600 18th St | bathroom remodel - convert bath/shower to shower. all fixtures in same place. new finishes; sheetrock, tile, cabinets, electrical & plumbing fixtures. install packet door to replace existing door. no structural work.Details
bathroom remodel - convert bath/shower to shower. all fixtures in same place. new finishes; sheetrock, tile, cabinets, electrical & plumbing fixtures. install packet door to replace existing door. no structural work. | $25,000 |
| Sep 29, 2016 | Completed final sign-off May 2017 | 881 Wisconsin St | kitchen and bath remodl. move bath wall and open counter area between kitchen and dining room. new finishes, elec and plumbDetails
kitchen and bath remodl. move bath wall and open counter area between kitchen and dining room. new finishes, elec and plumb | $60,000 |
| May 23, 2016 | Completed final sign-off Nov 2016 | 1701 Page St | kitchen remodel. relocate sink and appliances, modify lighting, bath remodel, extend kitchen/bath wall, relocate exit to back stairs, resize and replace existing windows, install new shower, tub, tile, lighting, raise floor in plane with kitchenDetails
kitchen remodel. relocate sink and appliances, modify lighting, bath remodel, extend kitchen/bath wall, relocate exit to back stairs, resize and replace existing windows, install new shower, tub, tile, lighting, raise floor in plane with kitchen | $58,000 |
| Mar 21, 2016 | Completed final sign-off Jul 2016 | 739 Shrader St | remodel (e) 1/2 bath to full bathroom with shower, move toilet. remove partition wall and move doorway. add pantry to (e) kitchen refirdgerator nicheDetails
remodel (e) 1/2 bath to full bathroom with shower, move toilet. remove partition wall and move doorway. add pantry to (e) kitchen refirdgerator niche | $30,000 |
| Feb 24, 2016 | Completed final sign-off May 2016 | 332 College Av | bath remodel: new plumbing & electrical fixtures, new sheetrock, new tile, new cabinetry, raise (e) window and replace with awning window.Details
bath remodel: new plumbing & electrical fixtures, new sheetrock, new tile, new cabinetry, raise (e) window and replace with awning window. | $19,000 |
| Oct 22, 2015 | Completed final sign-off Jan 2016 | 142 Beulah St | bathroom remodel (same area).Details
bathroom remodel (same area). | $20,000 |
| Oct 15, 2015 | Completed final sign-off Mar 2016 | 514 47th Av | remodel (e) one bathroom, demo (e) bathroom to studs, move sink and oitillet, flange, install electrical, sheet rock and tile.Details
remodel (e) one bathroom, demo (e) bathroom to studs, move sink and oitillet, flange, install electrical, sheet rock and tile. | $14,000 |
| Jun 10, 2015 | Completed final sign-off Apr 2016 | 754 22nd Av | install(1)skylight(5'6"from property line),install(2)skylights 4'from pl w/fire rated parapet,reframe 1 kitchen and 1 bath wibdow for new window installation.Details
install(1)skylight(5'6"from property line),install(2)skylights 4'from pl w/fire rated parapet,reframe 1 kitchen and 1 bath wibdow for new window installation. | $3,200 |
| Mar 10, 2015 | Completed final sign-off Apr 2016 | 754 22nd Av | comply with nov 201531641: remodel kitchen and (e) bathroom. add bathroom at back bedroom, remove partition walls and frame new space, change bathroom, plumbing fixture locations. remove ceiling tiles in 2 rooms & cover with sheetrock. 2 skylights under seperate permitDetails
comply with nov 201531641: remodel kitchen and (e) bathroom. add bathroom at back bedroom, remove partition walls and frame new space, change bathroom, plumbing fixture locations. remove ceiling tiles in 2 rooms & cover with sheetrock. 2 skylights under seperate permit | $100,000 |
| Dec 16, 2014 | Completed final sign-off Apr 2015 | 451 03rd Av | remodel 2 bathrooms & 2-1/2 baths. all fixtures to remain in same location. demolition, framing. install 2 pocket doors, sheetrock, tile, plumbing & electrical.Details
remodel 2 bathrooms & 2-1/2 baths. all fixtures to remain in same location. demolition, framing. install 2 pocket doors, sheetrock, tile, plumbing & electrical. | $30,000 |
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 255 Laguna St | remodel kitchen & bath, new cabinetry, appliances & fixtures in kitchen. existing ceiling & lighting to remain. bath - install new fixtures & shower, resize (1) exisitng lightwell, window & install for shower. u = 0.32 max.Details
remodel kitchen & bath, new cabinetry, appliances & fixtures in kitchen. existing ceiling & lighting to remain. bath - install new fixtures & shower, resize (1) exisitng lightwell, window & install for shower. u = 0.32 max. | $12,000 |
| Mar 18, 2014 | Completed final sign-off May 2014 | 46 Marietta Dr | kitchen & bath remodel, gut existing & install new plumbing, electrical, sheetrock, cabinetry, flooring, appliances. install new shower to replace bath.Details
kitchen & bath remodel, gut existing & install new plumbing, electrical, sheetrock, cabinetry, flooring, appliances. install new shower to replace bath. | $60,000 |
| Mar 18, 2014 | Completed final sign-off May 2014 | 46 Marietta Dr | replace existing front windows in kind, relocate bath & kitchen windows (1 each) & replace tempered glass for shower window.Details
replace existing front windows in kind, relocate bath & kitchen windows (1 each) & replace tempered glass for shower window. | $5,000 |
| Sep 13, 2011 | Completed final sign-off Aug 2012 | 349 Pope St | ground floor remodeling - one (n) bedroom, one (n) full bath, one (n) family room, one (n) office, and one (n) deck.Details
ground floor remodeling - one (n) bedroom, one (n) full bath, one (n) family room, one (n) office, and one (n) deck. | $35,000 |
| Apr 8, 2011 | Completed final sign-off May 2011 | 4349 20th St | 2nd flr bath remodel- upgrade existing plumbing fixtures same location and 1 recessed can, radiant floor heat tile and sr, 3rd flr bathroom- add radiant heat flooring and new tile floorDetails
2nd flr bath remodel- upgrade existing plumbing fixtures same location and 1 recessed can, radiant floor heat tile and sr, 3rd flr bathroom- add radiant heat flooring and new tile floor | $18,000 |
| Jul 22, 2010 | Completed final sign-off Aug 2010 | 4977 17th St | replace bathroom vanity with pedestal sink in same location, replace ceiling fan and sconce in same location, add wall heater, replace medicine cabinet, sheet rock repair.Details
replace bathroom vanity with pedestal sink in same location, replace ceiling fan and sconce in same location, add wall heater, replace medicine cabinet, sheet rock repair. | $3,000 |
| Feb 22, 2010 | Completed final sign-off Apr 2010 | 4507 19th St | add new bathroom with shower to (e) front bedroom, add 2 skylightsDetails
add new bathroom with shower to (e) front bedroom, add 2 skylights | $20,000 |
| Sep 24, 2009 | Completed final sign-off Dec 2009 | 2343 37th Av | remodel (e) bathroom, relocate kitchen & convert (e) kitchen space to home office. add two skylights as shown. all work at second floor.Details
remodel (e) bathroom, relocate kitchen & convert (e) kitchen space to home office. add two skylights as shown. all work at second floor. | $24,000 |
| Dec 30, 2008 | Completed final sign-off Mar 2009 | 2825 26th St | bathroom remodel/new plumbing + electrical fixtures sheetrock, tile no structural work. kitchen upgrade- replace cabinets + appliances in existing location new tile foor no walls will be opened. no structural work.Details
bathroom remodel/new plumbing + electrical fixtures sheetrock, tile no structural work. kitchen upgrade- replace cabinets + appliances in existing location new tile foor no walls will be opened. no structural work. | $20,000 |
| Oct 8, 2008 | Completed final sign-off Dec 2008 | 685 Corbett Av | bath remodel - new finishes, new light fixtures, new plumbing fixtures, sheetrock, & tile locate on 1st floor. no structural work.Details
bath remodel - new finishes, new light fixtures, new plumbing fixtures, sheetrock, & tile locate on 1st floor. no structural work. | $10,000 |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 859 37th Av | remodel 2 kitchens,2 full bathrooms&1 half bath.replace cabinets, fixtures,sheetrock,sinks,lighting, floor covering&wall tiles in bathroom.reloc 2 water heater&2 furnaces to grd flr.comply w/3r report #5309. new light high effic or manuel on auto off switch fr laundry rm to garage&attic.Details
remodel 2 kitchens,2 full bathrooms&1 half bath.replace cabinets, fixtures,sheetrock,sinks,lighting, floor covering&wall tiles in bathroom.reloc 2 water heater&2 furnaces to grd flr.comply w/3r report #5309. new light high effic or manuel on auto off switch fr laundry rm to garage&attic. | $80,000 |
| Feb 1, 2008 | Completed final sign-off Feb 2008 | 3948 Folsom St | revision to pa# 2007/07/12/6633 to delete proposed kitchen and bathroom remodel on the 2nd floor.Details
revision to pa# 2007/07/12/6633 to delete proposed kitchen and bathroom remodel on the 2nd floor. | |
| Nov 28, 2007 | Completed final sign-off Jun 2008 | 50 Collingwood St | remedel kitchen, bath & a new bath & closet addition on 2nd floor, all within existing footprint.Details
remedel kitchen, bath & a new bath & closet addition on 2nd floor, all within existing footprint. | $48,737 |
| Nov 26, 2007 | Completed final sign-off Jan 2008 | 2134 Grove St | remodel bathroom, move plumbing fixtures, add lighting tile sheetrock. add lighting and some insulated sheetrock to kitchen ceiling. (1) window replacement in kitchen @ lightwell.Details
remodel bathroom, move plumbing fixtures, add lighting tile sheetrock. add lighting and some insulated sheetrock to kitchen ceiling. (1) window replacement in kitchen @ lightwell. | $15,000 |
| Jul 5, 2007 | Completed final sign-off Sep 2007 | 227 Vicente St | bathroom remodel-new sheetrock tile, fixtures and trim 50% fluorescent lighting.Details
bathroom remodel-new sheetrock tile, fixtures and trim 50% fluorescent lighting. | $15,000 |
| Jun 15, 2007 | Completed final sign-off Aug 2007 | 2380 Bay St | eliminate 1 2'3' double hung window in bath, add 1 2'x19' awning windows in shower and 1 12'x48' glass block window u value <0.67Details
eliminate 1 2'3' double hung window in bath, add 1 2'x19' awning windows in shower and 1 12'x48' glass block window u value <0.67 | $5,000 |
| Jun 12, 2007 | Completed final sign-off Aug 2007 | 2380 Bay St | remodel bath: eliminate tub, move plumbing fixtures,. new sheetrock, tile, shower pan & fixtures.Details
remodel bath: eliminate tub, move plumbing fixtures,. new sheetrock, tile, shower pan & fixtures. | $25,000 |
| Nov 2, 2005 | Completed final sign-off Dec 2005 | 4185 Cesar Chavez St | rev. appl#200507016669 eliminate roof over ext.stair,reconfigure bathroom, add entry door at top of stairs.revision are clouded & indicated by revision #1.Details
rev. appl#200507016669 eliminate roof over ext.stair,reconfigure bathroom, add entry door at top of stairs.revision are clouded & indicated by revision #1. | |
| Jul 1, 2005 | Completed final sign-off Aug 2005 | 1024 Chenery St | bathroom replace (e) tile, new fixtures in same place as (e), add fan / light in shower.Details
bathroom replace (e) tile, new fixtures in same place as (e), add fan / light in shower. | $9,000 |
| Mar 17, 2004 | Completed final sign-off Jun 2004 | 700 Hayes St | remove & replace existing fixtures-new tile work- no exterior & no structural work- bath (2) remodelDetails
remove & replace existing fixtures-new tile work- no exterior & no structural work- bath (2) remodel | $6,000 |