Back to kitchen remodel contractors
Atm Construction
- Based in
- Berkeley
- On San Francisco permits
- Jan 2001 to Jul 2026
- Last 24 months
- 1 permit filed
50 permits since 2000: 32 completed, 8 never finaled, 10 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 9 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | Completed final sign-off Sep 2026 | 2521 Pine St | front bldg 2521.5 pine unit#2: like for like kitchen remodel - remove & replace (e) cabinets, countertop, and sink in same location. no change to fl plan, no wall removal/relocation. bathroom - replace showerpan in (e) footprint only, new water proofing and tile finish, patch adjacent wall surface.Details
front bldg 2521.5 pine unit#2: like for like kitchen remodel - remove & replace (e) cabinets, countertop, and sink in same location. no change to fl plan, no wall removal/relocation. bathroom - replace showerpan in (e) footprint only, new water proofing and tile finish, patch adjacent wall surface. | $5,500 |
| Sep 5, 2023 | Completed final sign-off Sep 2023 | 1545 Filbert St | kitchen remodeling in kind. no structural workDetails
kitchen remodeling in kind. no structural work | $3,000 |
| Dec 27, 2017 | Completed final sign-off May 2018 | 2186 California St | replacing tub shower valve in the bathroom and tile. replacing new cabinet & countertop in the kitchen of apt 23 maher naDetails
replacing tub shower valve in the bathroom and tile. replacing new cabinet & countertop in the kitchen of apt 23 maher na | $20,000 |
| Mar 26, 2013 | Completed final sign-off Oct 2013 | 1409 Shrader St | unit #5: replacing the bathroom tub and sink in the bathroom, replacing the kitchen cabinet and sink, replacing elec wiring and new plumbing, new sheetrock in living room, kitchen and bathDetails
unit #5: replacing the bathroom tub and sink in the bathroom, replacing the kitchen cabinet and sink, replacing elec wiring and new plumbing, new sheetrock in living room, kitchen and bath | $6,500 |
| Jul 19, 2012 | Completed final sign-off Sep 2012 | 2016 California St | replacing cabinets and sink in the kitchen and replace the bath tub in the bathroom.Details
replacing cabinets and sink in the kitchen and replace the bath tub in the bathroom. | $2,700 |
| Feb 28, 2012 | Completed final sign-off Jul 2012 | 2016 California St | replacing the bath tub and sink in the bathroom in (e) location. change the cabinet in the kitchen in (e) location in apt# 8 (3-4 cabinets)Details
replacing the bath tub and sink in the bathroom in (e) location. change the cabinet in the kitchen in (e) location in apt# 8 (3-4 cabinets) | $3,100 |
| May 20, 2011 | Completed final sign-off May 2012 | 2016 California St | replace kitchen cabinets in units 2,3,4Details
replace kitchen cabinets in units 2,3,4 | $15,000 |
| Jul 14, 2009 | Never finaled issued Jul 2009, no final | 475 Warren Dr | replacing kitchen sink, dishwasher, toilet.Details
replacing kitchen sink, dishwasher, toilet. | $4,000 |
| Jul 14, 2009 | Never finaled issued Jul 2009, no final | 475 Warren Dr | replacing kitchen sink, dishwasher, toilet.Details
replacing kitchen sink, dishwasher, toilet. | $4,000 |
| Aug 16, 2001 | Expired or cancelled expired Dec 2001 | 1409 Shrader St | replacing the bath tub in the bathroom sink & cabinet.replacing the kitchen sink & cabinet.necessaryDetails
replacing the bath tub in the bathroom sink & cabinet.replacing the kitchen sink & cabinet.necessary | $5,000 |
| Mar 20, 2001 | Completed final sign-off Aug 2001 | 1409 Shrader St | replacing the bath tub in the bathroom. replacing the sink cabinet in the kitchen. necessary elec. &Details
replacing the bath tub in the bathroom. replacing the sink cabinet in the kitchen. necessary elec. & | $8,000 |
| Jan 29, 2001 | Completed final sign-off Mar 2001 | 10 Sharon St | installing new cabinets in the kitchen & counter top (2nd flr).Details
installing new cabinets in the kitchen & counter top (2nd flr). | $2,500 |